• 제목/요약/키워드: Construction field data

검색결과 1,434건 처리시간 0.031초

현장 적용성을 향상시킨 건설현장 소음예측프로그램 개발 (Development of the Noise Prediction Program to apply in Construction Site)

  • 오진균;박혜나;손장열
    • 한국소음진동공학회논문집
    • /
    • 제19권4호
    • /
    • pp.409-417
    • /
    • 2009
  • Nowadays, the construction sites are growing in city every year, so complaints for construction noise have increased more and more. To analyze this noise scientifically, construction noise prediction program was developed in 1998 and 2005 but it is too difficult to apply program in field because there is few soundproof facilities and it can't understand the coordinate system and so on. The aim of this study is to develop noise prediction program to apply in construction sites. For this, the problems of existing program was analyzed and survey was performed to get requestion of field overseer and upgraded program. To get reliability of program, it was compared with sound measurement value in field. As a result, construction sound prediction program have various soundproof facilities data than existing program. It can also analyze multi receiver point at the same time for several construction machinery. Most of all, it is more powerful to set receiver or source in the axis of X, Y, Z. so program user can make use of it easily. An average of difference is -0.9~1.8 dB.

Analysis of Relationship between Teamwork Attitude and the Job Satisfaction of Project Participants

  • Acharya Nirmal Kumar;Kim Hyung-Soo;Lee Young-Dai
    • 한국건설관리학회논문집
    • /
    • 제7권4호
    • /
    • pp.164-176
    • /
    • 2006
  • Conflict may occur during teamwork activities. Conflict is the incompatibility of interest of participants; hence, it is more common in a wide varied activities involved construction field. Goals and values involve positive or negative features and are therefore common sources of conflict in construction field. Excessive conflict is a major hindrance to the effective operation of a team. If the conflict is not managed timely and properly, it could be transformed into a big dispute, thus to avoid these situation, it is necessary to augment working together culture. This paper aims to identify project team working factors and to uncover underlying relationships between these factors. A questionnaire survey was used to collect data from professionals. Factor analysis was employed to categorize twenty-one teamwork items evaluated by 169 respondents working in three major construction parties namely, owners, consultants and contractors. Factor analysis uncover that these team work factors can be grouped under three categories titled as: integrative working culture, relationship building and trust building. Multiple regression analysis however, showed that relationship building factor does not influence job satisfaction of project participants. Results of this study can be used as a tool to strengthening relationship between project participants in the construction industry.

수치지도 품질향상을 위한 지리조사 기준 정립 (A Thesis of Field Survey Standard for Quality Improvement of Digital Map)

  • 최석근;이승기;조의환;박상전
    • 대한공간정보학회지
    • /
    • 제17권3호
    • /
    • pp.57-64
    • /
    • 2009
  • 현재 제작되고 있는 수치지도 지리조사 기준은 수치지도작성작업내규를 기준으로 각종 작업지침서에 의해 이루어지고 있다. 그러나 수치지도작성작업내규는 과거 종이지도 제작에 사용된 규정을 수정하여 사용하고 있어 현재의 수치지도 품질상에 여러 가지 문제점들이 나타나고 있다. 그러므로, 고품질 수치지도를 제작하기 위해서는 지리조사에 관련된 전반적인 기준들이 재검토되어야 하고, 이를 기준으로 정확한 수치지도를 제작하는 것이 매우 중요하다. 따라서, 본 연구에서는 기존 수치지도 지리조사에 관련된 문제점들을 분석하여 보다 합리적인 지리조사 기준을 정립하므로써 정확한 수치지도를 제작하고자 한다. 이를 위하여 수치지도 작성에 관련된 작업규정들을 분석하고, 기구축된 수치지도 속성자료와 지리조사자료 등을 비교.분석하였으며, 분석된 결과를 지리조사자들과 관련 전문가의 의견을 수렴하여 합리적인 수치지도 지리조사기준을 제시하였다.

  • PDF

중학교 기술 가정.교과서의 의복구성 분야 내용 분석 (The Content Analysis of Clothing Construction field in the middle-school Textbook of Technology and Home Economics)

  • 박은희;조현주
    • 패션비즈니스
    • /
    • 제17권1호
    • /
    • pp.131-144
    • /
    • 2013
  • The purpose of this study was to analyse the structure and contents of clothing construction field in the middle-school textbook of technology and home economics with curriculum revised in 2007. 10 kinds of textbooks certified by Ministry of Education, Science and Technology in 2010 were selected and home economics field in them was the subject of this study with the external characteristics such as textbook system, instruction area and contents included. This study was content analysis-oriented and descriptive with data calculated by frequency and percentage. The findings are as follows. In 'Reality of Home-Life', food life area showed highest as 34.4% followed by clothing life(28.7%) and dwelling life(28.7%). The portion of present teachers in writing staffs was highest while there was no textbook where professors of each field were included in writing staffs. The contents of costume society, clothes material, clothes management from section 'Choice and Management of Clothes' in the chapter 'Family Life' and clothing construction from the section 'Making and Modifying Clothes' of the chapter 'Reality of Home-Life' were analysed in this study. Clothing construction-related fields were suggested separately by method of measurement, construction theory, drafting theory, drafting an original form, fabric trimming, utilization of the original form, length measure, cloth cutting, hand stitching, how to use a sewing machine, basting and correction, needlework process, completion, and evaluation. The contents of the unit 'Making Shorts' were about clothing construction theory, human body measurement, drafting an original form, process of making shorts and activity/research/experience. The contents of the unit 'Wearing Clothes after Fixing' in clothing construction-related field were about how to fix and recycling.

작업측정기법을 이용한 거푸집 공사의 생산성에 관한 연구 (A Study on the Productivity of Form Work by using Work Analysis Method)

  • 정희경;윤여완;양극영
    • 한국건축시공학회지
    • /
    • 제5권4호
    • /
    • pp.131-137
    • /
    • 2005
  • Lately Construction industry has been depressing by hard construction market circumstance. Construction company, especial at this time, makes more rationalize the management of inside Company and Construction field. In this study we are to present the method of calculation reasonable duration at Reinforced Concrete Work. For the study first make up a question at field workers, then sampling the Form workers based the question. Second, We are using Work Analysis Method analysing the worker's work-method and Time. And then using the result of analysis, measure the Productivity of Form work. The productivity of Form work is used the basic data of duration at Reinforced Concrete Work

유압식 항타소음의 특성과 예측에 관한 연구 (A Study on the Characteristics and Prediction of Piling Noise by Oil Pressure Method)

  • 이병윤;윤해동;김재수
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2001년도 추계학술대회논문집 I
    • /
    • pp.102-107
    • /
    • 2001
  • Recently, with the increasing of construction works, large construction equipment are used to reduce the term of work and labor cost in construction field. Therefore, construction equipment noise has caused much annoyance for a number of dweller in nearby construction field and it has become a very serious problem in our living environment. Neverthless, in our country, adequite guidelines for the construction equipment noise are very deficiency because of the lack of basic data and insufficient research works. From this point of view, this study attempts to survey the characteristics and prediction of piling noise in oil pressure method. On the basis of measurement value, we analysed about prediction possibility of piling noise in oil pressure method.

  • PDF

거푸집 공사의 생산성 측정에 관한 연구 (A Study on the Measure of Productivity of Form Work)

  • 정희경;윤여완;양극영
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2005년도 추계 학술논문 발표대회
    • /
    • pp.149-155
    • /
    • 2005
  • Lately Construction industry depressed by hard construction market condition. So Construction company, especial at this time, make more rationalize the management of inside Company and Construction field. So in this study we are to present the method of calculation reasonable duration at Reinforced Concrete Work. For the study first make up a question at field workers, then sampling the Form workers based the question. Second, We are using Work Analysis Method analysing the worker's work-method and Time. And then using the result of analysis, measure the Productivity of Form work. The productivity of Form work is used the basic data of duration at Reinforced Concrete Work

  • PDF

Curve Fitting을 이용한 건설장비 CO2 배출량 예측 모델 (A Prediction Model of CO2 Emissions for Construction Equipment Using Curve Fitting)

  • 노재윤;김유진;이지연;이민우;한승우
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2020년도 봄 학술논문 발표대회
    • /
    • pp.107-108
    • /
    • 2020
  • The severity of the global climate crisis is increasing due to greenhouse gases caused by human activities. As a result, countries and industries are making efforts to reduce carbon dioxide emissions, the biggest cause of global warming. Many studies have been conducted to predict carbon emissions in the construction sector to reduce this, but they have not actually produced a highly usable formula in the field. Therefore, the two variables 'Curve Fitting' were performed based on the data of excavators and trucks measured at the field. As a result, we have obtained a carbon dioxide emission prediction model for construction equipment, and we would like to use it to help establish an eco-friendly process plan.

  • PDF

사업초기단계에서 토지비 및 건축공사비 산정을 위한 의사결정프로세스에 관한 고찰 - 제주도 내 주택건설사업 중심으로 - (A Review on the Decision-making Process for Calculating Land and Construction Costs in the Early Stages of the Project - Focusing on the Housing Vonstruction Project in Jeju Island -)

  • 조성민;조성희;전상훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 봄 학술논문 발표대회
    • /
    • pp.321-322
    • /
    • 2021
  • This study is to develop a non-contact construction project management solution that can reduce cost and construction period through on-site information sharing, minimizing contact with others by COVID19, and improving the productivity of the construction industry. Decisions, checklists, and execution rates of construction costs can be checked with smart devices through sharing on-site photos and videos, exchanging opinions. Details and checklist data stored on cloud servers of sites that apply non-face-to-face construction project management solutions will be used as data for analyzing amounts and construction periods depending on the size of the construction. Real-time field information sharing will reduce expected problems and waste factors, expand communication channels with users to prevent or minimize construction disputes and claims, and contribute to the expansion and growth of new research industry markets in construction technology.

  • PDF

AN AUTOMATED FORMWORK MODELING SYSTEM DEVELOPMENT FOR QUANTITY TAKE-OFF BASED ON BIM

  • Seong-Ah Kim;Sangyoon Chin;Su-Won Yoon;Tae-Hong Shin;Yea-Sang Kim;Cheolho Choi
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1113-1116
    • /
    • 2009
  • The attempt to use a 3D model each field such as design, structure, construction, facilities, and estimation in the construction project has recently increased more and more while BIM (Building Information Modeling) that manages the process of generating and managing building data has risen during life cycle of a construction project. While the 2D Drawing based work of each field is achieved in the already existing construction project, the BIM based construction project aims at accomplishing 3D model based work of each field efficiently. Accordingly, the solution that fits 3D model based work of each field and supports plans in order to efficiently accomplish the relevant work is demanded. The estimation, one of the fields of the construction project, has applied BIM to calculate quantity and cost of the building materials used to construction works after taking off building quantity information from the 3D model by a item for a Quantity Take-off grouping the materials relevant to a 3D object. A 3D based estimation program has been commonly used in abroad advanced countries using BIM. The program can only calculate quantity related to one 3D object. In other words, it doesn't support the take-off process considering quantity of a contiguous object. In case of temporary materials used in the frame construction, there are instances where quantity is different by the contiguous object. For example, the formwork of the temporary materials quantity is changed by dimensions of the contiguous object because formwork of temporary materials goes through the quantity take-off process that deduces quantity of the connected object when different objects are connected. A worker can compulsorily adjust quantity so as to recognize the different object connected to the contiguous object and deduces quantity, but it mainly causes the confusion of work because it must complexly consider quantity of other materials related to the object besides. Therefore, this study is to propose the solution that automates the formwork 3D modeling to efficiently accomplish the quantity take-off of formwork by preventing the confusion of the work which is caused by the quantity deduction process between the contiguous object and the connected object.

  • PDF