본 논문은 유비쿼터스도시 건설사업의 사업추진 시 발생될 수 있는 논란의 여지를 최소화하기 위하여 각 유관기간별 역할과 책임한계를 제시한 것이다. 본 논문에서는 현재 추진 중인 각 지자체별 유비쿼터스도시건설사업 추진현황을 분석하고 사업 추진 시 발생되는 문제점을 도출하였다. 이와 같이 도출된 문제점을 해소하기 위하여 유비쿼터스도시 건설사업의 추진 절차를 사업계획에서부터 준공 후 관리 운영 단계에 이르기까지 세분화 하여 각 단계별로 관련 기관의 책임 한계를 설정하였다.
To succeed in ERP construction, the purpose of ERP setup must be completed. To accomplish this end, it is required to analysis business process completely and make a plan in detail. For ERP providers', they must support a characterized ERP construction methodology and lower the construction cost by improving an ERP package by making it easy to customize. But, because imported EHP products that are supplied currently are designed for the standard and the rationality, they have a limit to support custom processes of domestic companies. On the contrary, ERP products by domestic companies are unable to support a consistent methodology of constructing ERP system. This is a main reason why much time and costs are consumed than that of an original plan. For solving the problems, ERP packages should provide a consistent process modeling methodology and a modeling tool which can support this methodology. Furthermore, customizing cost must be lowered by implementing reusable components from the process models. This Paper describes a component-based ERP Package system which has peculiar modeling tools and development tools. We describe the modeling methodology and the business component definition of the ERP system. Finally, we describe its customizing process based on these process designs and business components.
국내 건설기업들의 해외 건설시장 진출이 중요한 쟁점이 되고 있는 현 시점에서, 타산업에 비해 경쟁강도가 낮으며, 높은 파급효과를 지닌 플랜트건설 수주확대를 위한 전략모색이 무엇보다 필요하다. 이에 본 연구에서는, 종합적인 측면에서의 표준화된 플랜트건설 사업관리 14가지 업무기능과 4가지 관리기법의 단계적 정의를 바탕으로 플랜트건설 전문가를 대상으로 선진국 대비 현재(2013년)와 미래(2018년)의 사업관리 업무기능별 역량수준을 조사 및 GAP분석을 실시하였다. 그 결과, 과거 실적을 바탕으로 노하우가 축적된 시공관리와 같은 하드웨어적인 역량은 선진국에 비하여 크게 뒤처지지 않으나, 경쟁강도가 상대적으로 낮고 부가가치가 높은 기획, 설계관리, 계약관리, 리스크관리와 같은 소프트웨어적인 측면의 역량은 뒤처진 것으로 나타났다. 또한 국가 산업적 차원에서 전문인력 및 원천기술 확보, 체계적인 관리 지원시스템 구축을 위한 연구개발의 확대가 필요한 것으로 분석되었다.
최근의 건설사업에서는 전체 건설공사 수행과정 중 특히 Pre-con 단계의 중요성이 점차 커지고 있으며 Project 성패에도 큰 영향을 미치고 있다. 그러나 현재 우리나라 건설사업은 Pre-con 단계에 대한 정확한 개념 및 체계화가 이루어지지 않고 있으며 대부분 현장소장의 경험에 의존하고 있기 때문에 체계적인 공사수행에 차질을 빚는 등 많은 문제점이 나타나고 있다. 이에 본 연구를 통해 전체 Pre-con 단계 중 종합건설회사내에서 시공계획서작성이전 Pre-con 단계의 업무흐름을 분석하고 업무부서간의 도식화된 업무체계를 제시하고자 한다. 이를 통해 불필요한 업무론 배제하고 더 나아가 향상된 업무 흐름을 통해 체계적인 공사계획을 수립하여 본 공사에서의 효율성 향상을 기대할 수 있을 것이다.
Journal of the Korean Data and Information Science Society
/
제21권4호
/
pp.747-756
/
2010
최근의 전 세계적인 경기 침체에 따라 산업계 전반에 관한 연구가 활발히 진행되고 있다. 본 연구에서는 신용보증기금에 등록된 중소기업들의 자료에 대하여 생존 분석을 이용하여 생존율을 추정하였다. 또한 중소기업의 자산규모와 업종에 따라 건설업과 타 업종으로 구분하여 생존율에 관한 동향을 비교분석하였다. 이때 생존율은 생명표에 의해 구하였으며, 업종별 생존율의 차이는 로그순위 검정과 윌콕슨의 검정통계량을 사용하여 분석하였다. 실험 결과 중소기업의 자산규모가 10억 이상이 가장 높았으며, 1억 미만, 1억에서 10억 미만은 비슷한 생존율을 보였다. 업종별로는 도소매업과 서비스업이 경공업과 중공업, 건설업에 비하여 생존율이 높았으며 건설업의 경우 생존율이 가장 낮음을 알 수 있었다. 또한 대부분의 중소기업들은 시간이 지날수록 위험률이 상승하는 추세를 보였다.
정부는 SW 중심사회 실현을 위해 SW 산업에 대한 정책역량을 집중해 왔으며, 이를 통해 SW 산업은 지속적인 발전을 거듭하고 다양한 산업들과의 융합을 통해 고부가가치 산업으로서 그 중요성과 시장이 폭발적으로 확대되고 있다. 그러나 소프트웨어 산업에 치중된 급격한 지원 정책들로 인해 사업자 선정 혼란에 따른 시공품질 저하, 업역(시장)분쟁 등 다양한 문제와 부작용이 발생하고 있다. 따라서 본 논문에서는 급속한 시장 변화에 따른 소프트웨어 지원 정책 및 관련 법령들에 대한 문제점과 관련 원인을 파악하고 그에 따른 개선안을 제안함으로써, 복합적 ICT 산업의업역 명확화(소프트웨어 및 정보통신공사업)를 통해 사업자 선정 혼란에 따른 문제점들을 최소화하고자 한다.
According to the recent trends which are the diversity of customer requests and the multi-function of buildings, A construction company's business has converted from the producer-oriented approach to the consumer-oriented approach. Therefore, each construction company is continuously trying to improve the quality level as a way of corresponding to customer needs in these changing situations. The quality is one of the main management targets which judge the success of a project along with the schedule, the cost and the safety. As construction companies execute the quality management which they aimed at, it should be completed within the optimum schedule and the limit of the budget. Accordingly, the importance of the construction site management to complete a project is continuously increasing. The construction site management is the systematic method to perform the project goals such as the quality improvement, the cost saving and the safety management, which organically operate one another, by procuring the manpower, the material and the machine in the right time. Specially, as the construction industry has based on the construction site, the establish of systematic construction site management, which can effectively correspond sudden changes of the construction business environment, is essential to maximize the construction productivity. On top of that, the necessity of the quality management method is increasing to accommodate customer needs more spontaneously in the construction site. These endeavors could guarantee their competitive power.
The management for materials and inventory is one of the factors which are considered the most for profits of a business in almost all industrial fields. Resource procurement which occupies more than 40% of an overall construction cost has a strong relationship with profits of a business but it is regarded as a work for a manager rather than for a technician. It makes the importance of resource procurement relatively low and slows down the development of workings. As the construction project becomes more larger and complicated, effective management for materials are directly affecting the profits of a business. Therefore, this research works on finding an economical managing method for materials according to a characteristic of construction project based on accurately forecasted BIM data. Finding a reorder point by using BIM data which contains an accurate data for schedule and material enables a better management for materials and provides more accurate data on matters which were used to be determined by an intuition of a manager.
Recently, the importance of project management has increased due to the scale and complexity of the construction projects. Therefore, this study conducted a survey on construction companies and related public institutions to verify the relationship between the role of the Project Management Office(PMO) and PM leadership for project performance. Based on this, the effect of the PMO role on the project performance was identified and the moderating effect of PM leadership was analyzed. As a result, first, the role of the PMO was found to have an influential on the project performance. Second, the PM leadership was verified to has a moderating effect in the relationship between the PMO role and the project performance. The purpose of this study is to analyze the influential of the role of PMO on project performance in the construction industry to suggest the necessity of PMO in the construction industry and the need to adopt PMO in large-scale construction projects and analyze the moderating effect of PM leadership on project performance.
In this study, we have developed a calculation system for BIM-based quantities, 4D process, and 5D construction costs, by integrating object shape attributes and the standard classification system which consist of Cost Breakdown System(CBS), Object Breakdown System(OBS) and Work Breakdown System(WBS) in order to use for the 4 dimensional process control of roads and rivers. First, a new BIM library database connected with the BIM library shape objects was built according to the CBS/OBS/WBS standard classification system of the civil engineering field, and a integrated database system of BIM-based quantities, process(4D), and construction costs(5D) for roads and rivers was constructed. Nextly, the process classification system and the cost classification system were automatically disassembled to the BIM objects consisting of the Revit-family style elements. Finally, we added functions for automatically generating four dimensional activities and generating a automatic cost statement according to the combination of WBS and CBS classification system The ultimate goal of this study was to extend the integrated quantities, process(4D), and construction costs(5D) system for new roads and rivers, enabling the integrated use of process(4D) and construction costs(5D) in the design and construction stage, based on the tasks described above.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.