• Title/Summary/Keyword: Construction adequacy

Search Result 118, Processing Time 0.034 seconds

A Study on the Appropriateness of Wind Pressure Resistance Test in KS F 2622 (KS F 2622에서 복합계열에 대한 성능 추가시 풍압 저항성 시험 평가방법의 적정성 검토)

  • Kang, Hyo-Jin;Kim, Soo-Yeon;Oh, Sang-Keun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.11a
    • /
    • pp.187-188
    • /
    • 2018
  • In this study, wind pressure resistance test was carried out among the nine test items of KS F 2622 using five types of water-tight material. After comparing the results with the performance range of the current KS F 2622 wind pressure resistance test, it is recommended to check the adequacy of the addition of the combined series.

  • PDF

A Study on application of High Strength Concrete by Non-Destructive Test (반발 경도법의 고강도 콘크리트 적용성 검토)

  • Kim, Hee-Doo;Lim, Sung-Joo;Park, Yong-Kyu;Kim, Hyun-Woo;Yoon, Gi-Won;Yang, Seong-Hwan
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.69-70
    • /
    • 2013
  • This is an foundational study to adequacy the non-destruction testing for the estimation of compressive strength of high strength concrete The results are as follows, In high strength concrete, H type is NR type rebound number rather than higher. The relation between rebound number and compressive strength of high strength concrete have lower coefficient. when compressive strength estimation of high strength concrete, it consider that rebound hardness test is not applied and should be consider to combined method or addition method.

  • PDF

A STUDY ON DEVELOPING THE CALCULATION SYSTEM OF DISBURSEMENT FOR GOVERNMENT ON THE BTL PROJRCTS

  • Chun-Kyong Lee;Tae-Keun Park
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.649-657
    • /
    • 2009
  • BTL projects, which has been 3 years since it was carried out in 2008, trigged the controversy on the adequacy in the calculation of disbursement for Government due to such problems as low earning rate and the burden of service level compared with the project suggestion. Thus, the purpose of this study is to offer a suggestion on the calculation system for the purpose of the standardized - expense appropriation by item and database including the antecedent study on the finance model and the feasibility in BTL projects. The system is composed of 4 steps - project management, basic database, an analysis on expense by item and the result, and an analysis on sensitivity, and it is possible to carry out a comparative analysis on single and multi alternatives by variable change along with the ground on expense calculation.

  • PDF

NPV-BASED 3D ARRAY DESIGN SYSTEM OF ROOF-TOP PHOTOVOLTAICS

  • Kim Se-Jong;Cho Dong-Hyun;Park Hyung-Jin;Yoon Hee-Ro;Koo Kyo-Jin
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.300-303
    • /
    • 2013
  • On BIPV systems, especially roof-top PV systems, the power generation is easier to be reduced due to the shades of facilities nearby, or roof itself. To secure profitability of roof-top PV systems, the optimal design of solar arrays through the precise shading analysis is an important item of design considerations. In this paper, an optimization system for array design of roof-top PVs is to be developed using three-dimensional Geospatial Information System(GIS). The profitability of income and expense is considered through the shading analysis of entire roofs. By applying the system to project for validation, the adequacy and the improvement of NPV of the system were verified compared to expert's design. The system has significance by reason that PV modules are placed through rules established with expert knowledge and geometric rules were applied to reflect the constructability and maintainability.

  • PDF

Improvement of Construction Manager Selection Method (건설사업관리자 선정방식 개선 방안)

  • Park, Yong-Woo;Lim, Nam-Gi
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.2
    • /
    • pp.108-115
    • /
    • 2011
  • This study investigates the construction management selection methods for fair competition within the construction management market by analyzing the current status of domestic construction management, the 2010 publication on the status of construction management, and the construction management evaluation criteria. Also, the 2009 publication of top CM service establishments, the average proportion of tender for 120 CM services from 2002 to 2010, and six assessment results which are open to the parties directly involved were statistically analyzed to review the adequacy of the evaluation criteria. This analysis shows that the evaluation criteria for the CM service impedes the development of the construction management industry and companies, since the criteria are decided by the service payment, and the technical skills assessed by technical proposals have no ties with contract prices. Therefore, this study proposes an improvement of the selection methods in accordance with the project characteristics and the technical requirements. However, more research is still needed to derive a detailed classification method of the technical requirement, the owner's evaluation criteria selection, and the preparation of an institutional foundation for the construction manager's post-evaluation.

Discrete Event Simulation based Equipment Combination Optimization Method - based on construction equipment performance estimation of the Construction Standard Production Rate - (이산형 이벤트 시뮬레이션 기반 최적의 건설장비 조합 도출 방법 제시 - 표준품셈 건설기계 시공능력 산식을 기반으로 -)

  • Ko, Yongho;Ngov, Kheang;Noh, Jaeyun;Kim, Yujin;Han, Seungwoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.6
    • /
    • pp.21-29
    • /
    • 2022
  • Productivity estimation of construction operations is crucial to successful project delivery. Especially in the preconstruction phase, the adequacy and effectiveness of plans directly affect the actual performance of operations. Currently, productivity estimation is conducted by referring to existing references such as the Construction Standard Production Rate. However, it is difficult to promptly apply changing conditions of operations when using such references. Moreover, it is difficult to deduce the optimal combination of construction machinery for the given condition. This paper presents a simple simulation model that can be used to generate productivity data that considers site conditions and construction equipment combination. The suggested method is expected to be used as a decision making assisting tool for practitioners who rely on estimations using the Construction Standard Production Rate when establishing construction plans using heavy machinery such as backhoes, loaders and dumptrucks.

A Study on the Development of Evaluation System on the Construction Project Manager's Safety Capability (건설사업관리자의 안전역량 평가체계 개발에 대한 연구)

  • Shin, Dong Hyuk;Seong, Joo Hyun;Yook, In Soo;Lee, Myeong-Gu;Oh, Tae Keun
    • Journal of the Korean Society of Safety
    • /
    • v.32 no.4
    • /
    • pp.40-45
    • /
    • 2017
  • Among various methods to build the construction safety, the consecutive improvement by the measuring and evaluating safety management capabilities for the construction participants such as an owner, a contractor, and a supervisor (construction project manager) can be the effective one. Thus, an effective evaluation and grading criteria to provide performance index for the implementation of safety management activities should be necessary. In this regards, the purpose of this study is to verify the adequacy by offering a competency evaluation system for the supervisor's safety capability and by applying the system to some construction sites. The proposed evaluation system was developed on the basis of the principles of safety management & accident prevention, basic elements of safety and health management system, and safety evaluation cases at home and abroad. The trial evaluation showed that the safety management of the construction site is mainly carried out by the contractor and the supervisor's awareness for the safety management is low on the whole. Especially, it is urgent to improve the support system from the supervisor headquarter and to place the dedicated safety management person in the field.

A Study on the Planning and Operation Status of Cruise Terminal in Jeju (제주지역 크루즈터미널 계획 및 운영 실태에 관한 연구)

  • Park, Chung-Keun
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.20 no.1
    • /
    • pp.85-92
    • /
    • 2018
  • Although Jeju is the best cruise Secondary port in Northeast Asia, currently there are no dedicated cruise terminals. The port international passenger terminal opened in 2015 has a ferry terminal for offshore passengers and a cruise passenger function. Jeju Island is therefore constructing a cruise only terminal with the aim of opening in 2018 to meet the growing passenger demand at the Seoguipo civilian and public ports along with construction of a naval base at Gangjeong Port in Seogwipo City. It also plans to build cruise docks and cruise terminals in the Jeju New Port according to the Jeju port construction basic plan. However, during the construction and planning process of cruise terminals in Jeju, the adequacy of the terminal size is being debated and the immigration facilities are being operated. Therefore, the study analyzed the size of terminals and operation of immigration facilities appropriate for cruise passenger demand by investigating the status of cruise related facilities and operation in Jeju area. Based on this, the Commission hopes to explore the rational direction of the cruise terminal plan to revive the cruise industry in Jeju and provide high quality service to cruise passengers.

A Study on the adequacy of Hospital Architecture Deign-Build and Improvement of Assessment Criteria - Focus on the case of Architectural Planning Design Change - (병원건축 일괄입찰방식의 적합성과 평가기준 개선방안에 관한 연구 - 건축계획의 설계변경사례를 중심으로 -)

  • Hong, Seung-Min;Yang, Nae-Won
    • Korean Institute of Interior Design Journal
    • /
    • v.21 no.2
    • /
    • pp.215-222
    • /
    • 2012
  • Design-build is expanding gradually in large construction projects over 10billion won, and continue to work in health care facilities is increasing in this way. This constructional method in health care facilities, despite the many advantages, many problems caused by design changes are being raised. Raises the question of design changes on the side of construction contract, such as approval systems have been studied in the field of construction. The purpose of this study design in aspects of architectural planning on changing the grasp of the issues outlined in the ITB and bid evaluation criteria through consideration of the basic plan for improvement guidelines and evaluation criteria is presented. In conclusion, Design build, according to the presence of existing users are more likely to lead to design changes. Thus, hospital architecture, depending on how it is considered that constructional methods. And evaluation items of ITB(Invitation To Bidder) for a large part of the change in the variables evaluated in the hospital building is not suitable for the design build. Instead, the overall shape of the building and department, unit type and size, vertical and horizontal parts of the circulation system in the shape of the building that does not change in structure and etc should be considered for evaluation.

  • PDF

Consideration for AFRAMAX TANKER Applied Common Structural Rules (AFRAMAX TANKER의 CSR 적용에 대한 고찰)

  • Kim, Sung-In;Kim, Young-Nam;Kim, Gyeong-Rae
    • Special Issue of the Society of Naval Architects of Korea
    • /
    • 2007.09a
    • /
    • pp.99-106
    • /
    • 2007
  • The IACS Common Structural Rules are to be applied for double hull tanker of more than 150m length with contracted after 1 April 2006. The objectives of the rules are to make more robust, safer ship and to ensure transparency of the technical background. In compliance of CSR, we had carried out prescriptive rules scantling determination and 3-D hold FE analysis of AFRAMAX TANKER. Prescriptive rules scantling determines the minimum required scantling, hull-girder longitudinal bending and shear strength, hull girder ultimate strength, local strength of plate and stiffener, strength of primary supporting member and fatigue assessment of the longitudinal stiffener end connections to the transverse bulkhead. 3-D hold FE analysis assesses the structural adequacy of the vessel's primary hull structure and major supporting members using yielding and buckling failure modes. So we could verify the strength assessment of AFRAMAX TANKER applied CSR.

  • PDF