International conference on construction engineering and project management
/
2020.12a
/
pp.129-136
/
2020
Augmented reality (AR) technology assists construction workers by superimposing additional virtual information onto their real worksite environments. Ideally, this provides them with a better understanding of their tasks and hence boosts task performance. However, the additional information that AR places in users' field of view could limit their ability to understand what is going on in their surroundings and to predict how conditions may change in the near future. AR-assisted systems on construction sites could therefore expose their users to safety risks due to disturbance from the system. Hence, it is important to understand how AR-assisted systems can block users' understanding of their immediate environments, and in turn, how worksite safety in the construction industry could be improved through better design of such systems. This preliminary research conducted a laboratory experiment that simulated rebar inspection tasks and compared the situational awareness of AR users against that of subjects using traditional paper-based inspection methods, as measured by the Situation Awareness Rating Technique. Based on the results, we discuss the safety impact of head-mounted AR-assisted displays on situational awareness during construction tasks.
Korean Journal of Construction Engineering and Management
/
v.7
no.3
s.31
/
pp.102-111
/
2006
In the analysis of function, which is the core and early phase among the procedure of construction VE Job Plan, the accuracy of function definition directly connects to VE result. However, the method of defining function, which is currently used is not accurate and comprehended or is difficult to utilize it systematically. Also, there is not a clear definition about the function for selecting VE so that many difficulties occur in the organic connection between each of functions in the summarization of function after defining function. Therefore, this study cleared the definition of function and made up any counter measured problem occurred in FAST Diagram later on and suggested CAFAT(Combined Antithetic Function Analysis Technique) in order to induce better phase in functional analysis.
Some reverse fault lines pass through the alluvial fans and west hill slope of Bulguksa mountains including Mt. Toham in the directions of N-S and NW-SE. The study area is known as relatively unstable, because of active faults. Assuming the record of earthquake in the Samguksagi, the architects in the construction of the Bulguksa temple should have recognized the possibility of breakdown from the earthquakes and the need for an unique structure against at that time. Against earthquakes, Greavee technique, a stonework construction technique following woothe one and use of Chushouok (Dongtleouok or Chumchaouok) were applied for the construction of Bulguksa temple. By designing the foundation stone with hole, a structure is prevented from motiff Ction that pillarsakdcede from a foundation stone in spite of horizontal load of earthquake while woot construction isaktrong frame at earthquake. The Bulguksa-temple isausually evaluated to be a beautiful architecture from the appeaultces like the weight balltced structure with unique decoration. ampressive architectures are beautiful in balance and harmony coming from the important and specific rolls in its own way by each part of whole structure. This beauty comes from the science.
Journal of the Korea Institute of Building Construction
/
v.10
no.4
/
pp.95-103
/
2010
The purpose of this study is to propose a decision-making technique for selecting waterproofing methods using the Analytic Hierarchy Process (AHP) technique. In this study, a questionnaire survey was given to a group of specialists, which included design specialists, construction specialists, and maintenance specialists, regarding their experience with roof waterproofing methods. The 1st level hierarchy of the questionnaire survey addressed the function, economics, and maintenance of each of the roof waterproofing methods. The rank of 13 items of questionnaire, which is the 2nd level hierarchy of the questionnaire survey, is calculated using Expert Choice Solution. The analysis of questionnaire survey shows that each specialist selects different roof waterproofing methods, and all specialists make much of waterproof performance.
Proceedings of the Korean Institute of Building Construction Conference
/
2022.04a
/
pp.71-72
/
2022
In the case of free-form buildings, it is difficult to reuse the form for panel production because the shape and size of the interior and exterior panels of the building are different. In general, it is a free-form concrete panel (FCP) production technology using the existing plywood formwork, and the form is produced in a different shape each time and is discarded after only one use. The production of these disposable forms requires enormous resources, including materials, labor and time. Hence, it is necessary to develop innovative forms that can be reused for sustainable FCP construction. In this study, a technology has been developed that combines 3D Plastering Technique (3DPT) to produce FCP. By applying this technology to free-form building projects, the time and cost required for FCP production can be reduced. However, specific studies on the production process for this technology have not been done yet. Therefore, the objective of this study is a basic study of free-form concrete panel production process using 3D plastering technique.
Groundwater Dam is one of the reliable techniques to get huge amount of groundwater abstraction for municipal, agricultural, drinking, industrial water supply system. It can be a major technique to solve water shortage problems when it based on the sufficient watershed, proper topology, and adequate aquifer distribution and pollution control, Groundwater Dam had initiated its construction by RDC(former KARICO) in early eighties in Korea and 4 of it in total were added more until late eighty. However, this technique has shrunken its application due to gradually decreased yield rate after sever years of construction. After we studied several existing sites precisely, we concluded that the main reason of decreasing yield rate was come form engineering roughness on construction in early nineties. Theoretically, the technique itself seemed to be little detectives however, there were a little application in the fields in Korea. With the recent advance in engineering fields, those defects in construction would be no longer obstacle to construct underground wall and the technique could be a one of major ground water production technique in the future. It is essential to study following items thoroughly before select the appropriate site. The topography and the site of the underground wall, aquifer distribution, the specific technique for wall construction to block groundwater flow effectively and strict quality control during construction are critical. The surface and ground water monitoring data should be collected. Sustainability of the Groundwater Dam with huge groundwater abstraction in long term should be based on the long-term water balance analysis for each site. The water quality, environmental effect analysis and maintenance achedule should be also analyzed and planned in prior. It is suggested that the two consecutive underground wall in the coastal area to prevent seawater intrusion beneath a single wall.
International conference on construction engineering and project management
/
2015.10a
/
pp.518-522
/
2015
Green Construction is the construction activities that conserved energy, land, water and material to reduce the negative effect to the environment while assuring essential demand on quality and safety during project construction. This paper critically examine the contribution of awareness and understanding, green construction practices and green construction innovation with the green construction benefits. A measurement model based on the theoretical framework and exploratory factor analysis was developed and tested using structural equation modelling technique. This study employs a survey research methodology involving a total of 346 respondents among construction contractors, developers, clients and consultants in the construction industry. The findings indicate that the awareness and understanding, green construction practices and green construction innovation are significant predictors of the green construction benefits. From the practical perspective, the findings should alert the construction participants on the need of awareness and understanding, green construction practices and green construction innovation towards the green construction benefits. In addition, the findings can be used as diagnostic tool for continuous improvements in the Malaysian construction industry.
This paper presents illustrative examples of the application of advanced digital image correlation (DIC) technology in the geotechnical laboratory tests, such as shallow footing test, trapdoor test, retaining wall test, and wide width tensile test on geogrid. The theoretical background of the DIC technique is first introduced together with fundamental equations. Relevant reduced-scale model tests were then performed using standard sand while applying the DIC technique to capture the movement of target materials during tests. A number of different approaches were tried to obtain optimized images that allow efficient tracking of material speckles based on the DIC technique. In order to increase the trackability of soil particles, a mix of dyed and regular sand was used during the model tests while specially devised painted speckles were applied to the geogrid. A series of images taken during tests were automatically processed and analyzed using software named VIC-2D that automatically generates displacements and strains. The soil deformation field and associated failure patterns obtained from the DIC technique for each test were found to compare fairly well with the theoretical ones. Also shown is that the DIC technique can also general strains appropriate to the wide width tensile test on geogrid, It is demonstrated in this study that the advanced DIC technique can be effectively used in monitoring the deformation and strain field during a reduced-scale geotechnical model laboratory test.
Proceedings of the Korean Institute of Building Construction Conference
/
2008.11a
/
pp.205-211
/
2008
Recently, selects method of waterproofing where is suitable with method and material physical properties, construction technique, Productive technique and specifications and maintenance techniques evaluation for the same evaluation method is coming to be presented. Respects the application which select system is substantial objectively reflects a weight to evaluation item the research for is necessary. This research the evaluation which in order is effective and the decision-making to be possible about technically countermeasures for a quality security from waterproofing materials, method selection processes, clearly responsible dividing of construction and maintenance techniques. A sets weight of evaluation item for right select system, it stratify the causes which affect in priority based on AHP.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2006.11a
/
pp.659-662
/
2006
Plant industry is very important industry that dominate 70% of standard foreign countries construction acceptance an order woe 2004 years. Technique of plant industry is state that secure part equipment connection detailed design and construction class' competitive power. But, high added value creation among plant industry need technique elevation because available plan, basic design technology is insufficient. Therefore, high added value creation wishes to present problem of standard code and improvement direction for plant design to improve available plan, basic design technology competitive power.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.