Browse > Article
http://dx.doi.org/10.5345/JKIC.2010.10.4.095

The Selection of Roof Waterproofing Methods using the Analytic Hierarchy Process (AHP) Technique  

Choi, Oh-Young (Department of Architectural Engineering, Kyonggi University)
Cho, Hong-Gyu (Chin Hung International Inc.)
Kim, Gwang-Hee (Department of Architectural Engineering, Kyonggi University)
Publication Information
Journal of the Korea Institute of Building Construction / v.10, no.4, 2010 , pp. 95-103 More about this Journal
Abstract
The purpose of this study is to propose a decision-making technique for selecting waterproofing methods using the Analytic Hierarchy Process (AHP) technique. In this study, a questionnaire survey was given to a group of specialists, which included design specialists, construction specialists, and maintenance specialists, regarding their experience with roof waterproofing methods. The 1st level hierarchy of the questionnaire survey addressed the function, economics, and maintenance of each of the roof waterproofing methods. The rank of 13 items of questionnaire, which is the 2nd level hierarchy of the questionnaire survey, is calculated using Expert Choice Solution. The analysis of questionnaire survey shows that each specialist selects different roof waterproofing methods, and all specialists make much of waterproof performance.
Keywords
Roof waterproofing methods; AHP technique; Methods selection;
Citations & Related Records
Times Cited By KSCI : 9  (Citation Analysis)
연도 인용수 순위
1 Igal M, Shohet M. Puterman Flat roofing systems: Towards integrated techno-economic analysis. Building Research & Information. 2004;32[2]:165-173.   DOI   ScienceOn
2 Choi SM, Lim JK, Oh SK, Seo hH. A research for weight decision of waterproofing methods selection evaluation item using the AHP. Journal of the Korea Institute of Building Construction. 2008;8(2):205-211.
3 Choi SM, Oh SK, Seo CH. A study on the weight decision and risk abstraction for Life Cycle Cost analysis of the waterproofing methods in structure roof which considers a risk probability. Journal of Architectural Institute of Korea. 2009;5(4):177-184.
4 Cho GT, Cho YG, Kang HS. AHP decision making. Dong Hyun Publishing Co. Ltd. 2003.
5 Harker PT, Vargas LG, The theory of ratio scale estimation: Saaty's Analytic Hierarchy Process. Management Science. 1987;33[11]:1383-1403.   DOI   ScienceOn
6 Satty TL, The analytic hierarchy process. The McGraw-Hill Companies. 1980.
7 Satty TL, Vargas LG, method, concepts and applications of the analytic hierarchy process. Boston ;Kluwer Academic Publisher. 2001.
8 Lee CH, Jeong KC. Selecting a foundation practice using analytic hierarchy process and utility theory. Journal of Korea Institute of Construction Engineering and Management. 2009:189-194.
9 Lee SB, Pyo YM. A study on the analysis of factors decreasing construction labor-productivity using AHP method. Journal of Architectural Institute of Korea. 2007;9(1):179-187.
10 Chung JY, Yoon TK. A study on the equilibrium-pricing mechanism of apartment. Journal of the Korea Institute of Building Construction. 2008;8(6):65-74.   과학기술학회마을   DOI   ScienceOn
11 Yang KY, Yoon YW. A study on the selection of construction method by decision making method. Journal of the Korea Institute of Building Construction. 2002;2(1):147-154.   과학기술학회마을   DOI
12 Kim MJ, Lee JS. Methods for decision making model in apartment development projects using on analytic hierarchy process. Journal of Korea Institute of Construction Engineering and Management. 2008;9(5):95-103.   과학기술학회마을
13 Jung IS, Lee CS. Alternative evaluation model in the development of environment-friendly residential land. Journal of Korea Institute of Construction Engineering and Management. 2009;10(1):156-166.   과학기술학회마을
14 Jang RW, Yoo BG, Lee YS, Kim JJ. A study on the analyzing risk factors in chinese construction projects using AHP. Journal of Architectural Institute of Korea. 2009;25(7):287-294.
15 Yoon HB, Kim SJ, Lee CS. Maintenance performance improvement method of the buildings in design phase. Journal of Korea Institute of Construction Engineering and Management. 2006:692-697.
16 Korea institute of construction technology, Selection of waterproofing and construction management skills.
17 Kim BS, Lee YS, Hong JS, Kim JJ. Development of the strategy for construction production improvement by system thinking. Journal of Korea Institute of Construction Engineering and Management. 2008;9(6):156-163.   과학기술학회마을
18 Choi OY, Kim TH, Kim GH. A study on selection of roof waterproofing method by analyzing Life Cycle Costing. Journal of the Korea Institute of Building Construction. 2008;8(5):127-134.   과학기술학회마을   DOI   ScienceOn
19 Kim JY, Kim GH, Ahn SH, Lee JY. Benefit/cost analysis of Form work methods for composite basement wall in Building constructions. Journal of the Korea Institute of Building Construction. 2008;8(1):99-104.
20 Kim JI, Koo KJ, Park SC, Park HJ. Building finishing materials selecting supporting model using CBR and AHP. Journal of Architectural Institute of Korea. 2008;28(1):589-592.
21 Choi SM, Oh SK, Seo CH. A study on the weight decision and decision-making process for selection system of waterproofing methods of structure roof. Journal of Architectural Institute of Korea. 2009;25(1):157-166.