• Title/Summary/Keyword: Construction Standard Production Rate

Search Result 30, Processing Time 0.021 seconds

Study on Improvement of Cost Calculation Method in Construction less than One Day Workload (1일 작업량 미만 공사의 공사비 산정 방식의 개선방안에 관한 연구)

  • Shin, Dae-Woong;Lee, Young-Do;Shin, Yoonseok;Kim, Gwang-Hee;Yoo, Sangrok;Park, Wonjun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.5
    • /
    • pp.477-485
    • /
    • 2014
  • Standard production unit system and historical cost data are the most typical data base for calculating budget price in construction. However, these construction cost estimation methods are difficult to calculate proper construction cost because definition, additional allowance or modification criteria is not clear in construction within one day. Therefore, this study identifies problems for standard production unit system and historical cost data and suggests the improvements for them. For the objectives, this study analyzes frequency after implementing survey for 44 specialty contractors in placing at kyeonggi-province. As the results of the study, labor costs in standard production unit system and equipment costs in historical cost data and in construction of pavement and maintenance by project type was exceeded at most high rate against construction cost estimation methods. Based on this result, standard production unit system and historical cost data need to be modified by three improvements such as classification by project scale. These will be baseline data for improvement of construction cost estimation methods for less than one day workload.

The effect of sound stress on laying hen performance (소음스트레스에 의한 산난계의 피해상황 연구)

  • 신창호;한귀섭;박현기;이용범
    • Korean Journal of Veterinary Service
    • /
    • v.23 no.3
    • /
    • pp.263-269
    • /
    • 2000
  • This study was carried out to set a standard of damage compensation by researching state of damage due to noises in laying and prelaying hens. Recently, there are many damage cases in chicken farms near construction site that were caused by noises of construction. Therefore disputes and complaints about economical loss have increased ceaselessly. But we have few research and report such a thing. The result have shown that the weight loss rate was ranged from 9.48% to 23.2% and mortality of laying period of hens was higher than prelaying period. Pathological findings were fatty liver, congestion and hemorrhage of intestine, erosion of proventriculus and gizzard in order of case frequency. And these signs in hens of laying period was more serious than prelaying period. Half-life rate of antibody titers against Newcastle disease and infectious bronchitis in sound stressed hens was no different compared with non-stressed hens. Egg production rate dropped from 38% to 45% according to strength of noises. Before being stressed, hens produced special, large, middle, small-size eggs in the order. But after being stressed, their egg Production rate of middle, small-size Increased while egg production rate of special, large-size decreased. Production rate of soft and broken shell eggs was 0.015% in the stressed flocks higher than 0.005% in the non-stressed flocks.

  • PDF

Anaerobic digestion technology for biogas production using organic waste (유기성폐기물의 혐기성 소화에 의한 바이오가스 생산 기술)

  • Kim, Hyoung-Gun;Lee, Dae-Sung;Jang, Hae-Nam;Chung, Tai-Hak
    • Journal of the Korea Organic Resources Recycling Association
    • /
    • v.18 no.3
    • /
    • pp.50-59
    • /
    • 2010
  • A pilot-scale test for production of biogas was conducted in an specially designed anaerobic digester (KH-ABC) in which the highly concentrated organic waste (food-waste and piggery-manure) was treated. The effect of inhibitive material to the reaction on anaerobic digestion and the feasibility of digested fluid for the liquefied fertilizer were investigated. The production rate of biogas, the concentration of methane($CH_4$) in biogas, and the digesting rate of volatile solid(VS) were analyzed in the variance of the operating conditions ; the influent rate, the mixture ratio of food waste and piggery manure, and the hydraulic retention time(HRT), etc. The production rate of biogas increased from 1.2 to $2.0kg-VS/m^3{\cdot}d$ with the organic loading rate(OLR). The most suitable operating conditions were recorded at $6m^3/day$ of an influent rate, 2:3 of the raw material mixture ratio(food waste : piggery manure) and 25 days of HRT, respectively. Under those conditions, the production rate of biogas, the concentration of methane($CH_4$) in biogas and the digesting rate of volatile solid(VS) were $220m^3/day$, 64%, and 70%, respectively. The concentration of inhibitive materials was below toxic standard and the anaerobic digested fluid(raw material mixture ratio of 3:7) could meet the condition of the liquefied fertilizer.

A Study on the Improvement of Recycled Aggregate Quality by Multi-Stage Wind Pressure Treatment (다단형 풍압처리에 의한 순환골재 품질개선에 관한 연구)

  • Jeon, Chan-Soo;Song, Tae-Hyeob;Kim, Ji-Hoon;Choi, Won-Young
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.271-272
    • /
    • 2018
  • As the supply and demand of natural aggregate becomes more difficult in the domestic construction site continuously, many studies related to the recycled aggregate produced in the construction waste are going on. However, because of the safety and performance of the recycled aggregate, it is not used as aggregate for the structure, and it is mainly used as a nonstructural material. In addition, as the "recycled aggregate quality standard" has been revised in 2017, quality standards for various properties of recycled aggregate have been adjusted, and production technology suitable for recycled aggregate quality standards for concrete is needed. In this study, to improve the quality of recycled aggregate, we applied multistage wind pressure treatment method to the existing recycled aggregate production facility and compared the density, absorption rate, particle size before and after recycled aggregate treatment. As a result, quality criteria in various properties were analyzed satisfactorily.

  • PDF

A Study on the Method of Estimating Indirect Labor Cost Rate Using the Analysis of Cost Items in Complete Works (완성공사 원가구성 분석에 의한 간접노무비율 산정방법에 관한 연구)

  • Jung Soon-Kil;Lee Hak-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.2 s.6
    • /
    • pp.81-89
    • /
    • 2001
  • Construction industry has particular properties of non-continuity of production, and non-stability of market comparing to other industries. Because of them, the practical construction cost is more difficultly recognized than in manufacturing industry, so, that is various according to many projects. Therefore, it is very hard work to standardize construction cost, and it is worthy of analyzing and measuring exactly construction cost. On this study, the trouble in producing expected construction cost with original cost calculation method is progressed by the data of cost items in complete works. On the basis of analyzing data, as expected cost of practical construction is measured, it can be referred to the method and the standard of indirect labor cost rate in construction.

  • PDF

Estimation of Construction Equipment Production Rates: Focus on Efficiency Rate (건설기계 시공능력 산정에 관한 연구 : 작업효율 중심으로)

  • Park, Hee-Sung;Han, Ye Lyeong;Huh, Youngki;Ahn, Bang Ryul
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.1D
    • /
    • pp.67-72
    • /
    • 2008
  • Heavy equipment is a very important factor for successful construction implementation. Also, the cost for heavy equipment is a major part of construction cost. Therefore, the estimation of equipment cost is a critical job in the construction planning phase. A formula for production rates shown in 'Standard Unit Labor' has been used to estimate construction equipment capability per hour and cost. Although the performance of equipment has been improved, the efficiency rates in the formula are not updated lately. Therefore, this research performed several site visits to measure construction equipment working time and then calculates the efficiency rates for hydraulic backhoe, loader, and dump truck. The results show that the measured efficiencies of backhoe and loader are higher than current ones and vice versa for dump truck. This research proposes the needs for a standardized calculation formula and systematic and long-term data collection and measurement for updating efficiency rates for heavy equipment.

A Study on Improving the Occupational Safety and Health Management Cost Calculation Standards (산업안전보건관리비 계상기준 개선방안 연구)

  • An, Bang-Yul;Song, Tae-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.06a
    • /
    • pp.169-170
    • /
    • 2020
  • Occupational Safety and Health Management Cost, used to protect workers in Korean construction worksites and to create safe working environments, is a legally managed expense item. As this cost item is grounded on the Occupational Safety and Health Act, it is always implemented. However, because there is a ceiling on its rates, insufficient amounts of Safety Management Costs are often allocated to worksites, with the money not being used to areas essential to worker safety. As such, the current study raises the need to develop a set of standards to enable some items under the Occupational Safety and Health Management Costs-appropriated under the rate of indirect costs-to be appropriated as direct construction costs. As a preliminary step in this effort, the current study will provide basic data that can be used to create construction cost calculation standards for items that can be calculated as direct construction costs.

  • PDF

Proper Mixing Ratio for Securing Quality of Free-form Panel (비정형 패널의 형상 품질확보를 위한 적정 배합비 도출)

  • Kim, Min-Sik;Park, Chae-Wool;Kim, Ki-Hyuk;Do, Sung-Lok;Lee, Dong-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.19 no.5
    • /
    • pp.449-456
    • /
    • 2019
  • Recent developments in architectural technologies and programs have enabled architects to think creatively and design free-form architecture. however, there are many problems in the production technology of FCP(Free-Form Concrete Panel). In particular, reduced accuracy due to lack of free-form panel production technology can lead to redesign of buildings as a result, problems such as an increase in construction cost and period. Therefore, this experiment aimed to compensate the decrease of the accuracy according to the displacement difference and to derive the proper mixing ratio for maintaining the shape during the free-form panel curing. In this study, molds were made using paraffin that is a recyclable phase change material. Concrete Panel is usually produced from Portland cement, dead burn magnesia, phosphate, borax and fine aggregate. In this study, four mixing ratios of FCP were selected after each material was blended to determine the proper blending ratio of the fluidity phase, the water absorption rate and the water content of the test piece. FCP was fabricated on the basis of the selected four compounding ratios and thickness and error rate were measured. Based on the error rate of the measured FCP, the quality standard was satisfied among the four compounding ratios.

Analysis of the Economic Effect of the Construction Industry and the Cost-benefit Analysis of the Recycled Aggregate Production Industry According to the Use of High-quality Recycled Aggregate (고품질 순환골재 활용에 따른 건설 산업의 경제적 효과 및 순환골재 생산 산업의 비용 편익 분석)

  • Choi, Won-Young;Jeon, Chan-Soo;Kim, Sang-Heon;Kim, Tae-Hyoung;Jeon, Duk-Woo
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.9 no.4
    • /
    • pp.483-491
    • /
    • 2021
  • The purpose of this study is to analyze the economic effect of the use of recycled aggregate on the construction industry and the effect of increasing the value of the recycled aggregate production industry on the premise of supporting quality assurance technology to promote the high-quality use of recycled aggregate. Accordingly, the production cost of ready-mixed concrete that can be obtained through the use of high-quality recycled aggregate is analyzed according to the recycled aggregate application rate recommended in the recycled aggregate quality standard, The economic effect of general ready-mixed concrete and recycled aggregate-applied rea dy-mixed concrete industry wa s a na lyzed by identifying the domestic rea dy-mixed concrete industry sca le a nd the ra te of satisfaction of recycled aggregate volume, and a cost-benefit analysis method was used to examine the benefits of high-quality recycled aggregate production and sales. As a result, the production cost of ready-mixed concrete is reduced by 2.3~16.2% depending on the application rate, the economic effect of the use of recycled aggregate on the construction industry is about 106.8~142.6 billion KRW, and the effect of increasing the value of the recycled aggregate production industry generated about 1.22 times the benefit.

A Study on Improvement of Modular Specifications - Focused on technical specifying method in waterproof and mechanical works - (모듈러 공사시방서 개선방안에 관한 연구 - 방수 및 기계설비공사의 기술방안 개선을 중심으로 -)

  • Yoon, Jongsik;Shin, Dongwoo;Cha, Heesung;Kim, Kyungrai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.3
    • /
    • pp.33-41
    • /
    • 2017
  • A modular specification is a contract document that specifies the requirements of production, transformation and installation in a modular construction. A problem of the currently used specification is that it does not guarantee the level of performance required by the modular construction and fails to accommodate unique characteristics of each construction because it widely uses the standard specification as it is. This study proposes a specification that reflects the unique feature of modular construction in order to improve the quality of modular construction. Research focuses on the leakage in waterproof and mechanical equipment because it is the area with the highest rate of defects. This study suggests ways to improve the modular specification as follows: 1)Descriptive specifying (following MasterFormat) 2)Propose leakage verification method and test clause 3) Reflect characteristic of modular construction. Proposed modifications to modular specification are reviewed by experts for validation and their opinion verifies suggested improvements as a way to secure the quality of modular construction and to promise characteristics of the modular specification. This improvement will be used for reference when writing construction project specification, which can be an important contract document, so that it could lower occurrence rate of the modular defects.