• 제목/요약/키워드: Construction Standard Cost

검색결과 521건 처리시간 0.034초

콘크리트포장 시공실태 조사에 따른 표준시장단가 개정 연구 (A Study on the Revision of Construction Standard Unit Price for Concrete Pavement Works)

  • 이주현;백승호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2022년도 봄 학술논문 발표대회
    • /
    • pp.196-197
    • /
    • 2022
  • This study aims to come up with the revision of construction standard unit price for concrete pavement works to improve its applicability and availability by a construction site survey. Construction site survey was conducted from March to November 2021 with 36 construction sites. This results of the revision are expected to support to public construction project owner or estimator in construction cost estimation works.

  • PDF

건설공사 공사비 예측 및 관리기술 발전방향 : 호주 사례를 중심으로 (Direction for Improving Cost Estimation and Management of Construction Projects : Comparing to Australian System)

  • 지세현;박문서;이현수;윤유상
    • 한국건설관리학회논문집
    • /
    • 제9권2호
    • /
    • pp.170-181
    • /
    • 2008
  • 건설 프로젝트는 생산과정 이전에 설계도면을 바탕으로 예상되는 비용이 산정되며, 기획단계는 소요예산을 책정하고 설계단계는 예산에 합당한 효율적 대안을 찾으며, 정확한 입찰금액을 예측하기 위해 수차례 이루어진다. 특히, 물량산출 이전까지 예측되는 공사비의 정확도와 신뢰도는 매우 중요하다. 그러나, 국내의 경우 면적당 단가 방식 공사비 예측을 벗어나지 못할 뿐 아니라, 단계별 예측방법, 프로세스, 데이터 분석 및 관리기술 등이 표준화되어 체계적이고 종합적으로 관리되지 못하고 있다. 이에 국내 공사비 예측기술 및 관리기술 발전을 위하여 첫째, 표준화된 공사비 데이터베이스 구축과 국가차원의 종합적 관리가 필요하며, 구축 방법으로 다차원 공사비 데이터베이스 개념모델 CUBE를 제시하였다. 둘째 단계별 공사비 예측의 목적에 맞는 코스트 모델 적용이 필요하며, 코스트 모델의 방법론을 기획단계와 설계단계로 구분하여 제시하였다. 셋째, 이러한 두 가지 코스트 모델을 적용한 코스트 플래닝 프로세스를 제시하였고, 넷째, 공사비 예측 및 관리 전문인력 양성의 필요성을 제시하였다.

1일 작업량 미만 공사의 공사비 산정 방식의 개선방안에 관한 연구 (Study on Improvement of Cost Calculation Method in Construction less than One Day Workload)

  • 신대웅;이영도;신윤석;김광희;유상록;박원준
    • 한국건축시공학회지
    • /
    • 제14권5호
    • /
    • pp.477-485
    • /
    • 2014
  • 표준품셈과 실적공사비 적산방식은 건설공사의 예정가격을 산정하는 가장 대표적인 기준자료이다. 하지만 이러한 공사비 산정방식은 1일 작업량 미만의 작업에서 정의, 할증 또는 보정기준 등이 명확하지 않아 적정 공사비의 산정이 어려운 실정이다. 따라서 본 연구는 1일 작업량 미만의 작업에서 표준품셈과 실적공사비의 문제점을 파악하고 이에 대한 개선방안을 제시하고자 한다. 이를 위해 본 연구에서는 경기도내 44개의 전문건설업체에 대하여 설문조사를 실시하여 빈도분석을 하였다. 본 연구를 통하여 표준품셈에서는 인건비, 실적공사비에서는 장비비, 공종별로는 도로포장 및 유지공사의 장비비가 각각 가장 높은 비율로 초과되었다는 결과를 도출하였다. 결과를 바탕으로 표준품셈과 실적공사비는 공사의 규모에 따른 구분 등 각각 3가지의 개선이 필요하다. 본 연구의 결과는 1일 작업량 미만의 작업에서 공사비 산정 제도의 개선을 위한 기초자료로 활용될 수 있을 것이다.

도로공사 환경보전비의 적정 산출 방안 (Proper Estimating Method for Environmental Preservation Cost in Road Projects)

  • 박지선;이세현
    • 한국건설관리학회논문집
    • /
    • 제13권2호
    • /
    • pp.3-10
    • /
    • 2012
  • 현행 "건설기술관리법" 시행규칙의 환경보전비 세부산출기준에 따르면 환경보전비는 표준품셈 등을 이용하여 원가계산에 따라 산출하거나 원가계산이 곤란한 경우에는 공종별로 직접비에 요율을 적용하여 산정하도록 규정하고 있다. 그러나 원가 계산으로 산정할 경우, 현행 표준품셈에 환경보전비에 해당하는 항목이 일부 제한된 항목만 명시되어 있어 다양한 환경오염 방지시설의 설치 및 운영에 사용되는 제반비용을 반영하는 데 현실적인 제약이 있다. 아울러 요율을 적용하여 산정하는 경우에도 공종별로 획일적인 요율을 적용하도록 규정되어 공사현장의 입지여건 등에 따른 특성을 제대로 반영하지 못하고 있어 공사현장의 효율적인 환경관리가 어려운 실정이다. 따라서 본 연구에서는 도로공사 건설현장을 대상으로 공사규모, 현장 입지조건, 환경보전비 계상방식 등에 대하여 실태 조사 및 분석을 실시하여 이를 토대로 환경보전비의 적정 계상 방안을 제시하고자 한다.

A Development of Unified and Consistent BIM Database for Integrated Use of BIM-based Quantities, Process, and Construction Costs in Civil Engineering

  • Lee, Jae-Hong;Lee, Sung-Woo;Kim, Tae-Young
    • 한국컴퓨터정보학회논문지
    • /
    • 제24권2호
    • /
    • pp.127-137
    • /
    • 2019
  • In this study, we have developed a calculation system for BIM-based quantities, 4D process, and 5D construction costs, by integrating object shape attributes and the standard classification system which consist of Cost Breakdown System(CBS), Object Breakdown System(OBS) and Work Breakdown System(WBS) in order to use for the 4 dimensional process control of roads and rivers. First, a new BIM library database connected with the BIM library shape objects was built according to the CBS/OBS/WBS standard classification system of the civil engineering field, and a integrated database system of BIM-based quantities, process(4D), and construction costs(5D) for roads and rivers was constructed. Nextly, the process classification system and the cost classification system were automatically disassembled to the BIM objects consisting of the Revit-family style elements. Finally, we added functions for automatically generating four dimensional activities and generating a automatic cost statement according to the combination of WBS and CBS classification system The ultimate goal of this study was to extend the integrated quantities, process(4D), and construction costs(5D) system for new roads and rivers, enabling the integrated use of process(4D) and construction costs(5D) in the design and construction stage, based on the tasks described above.

공동주택 건설공사비지수의 변동추세 분석 (Analysing Construction Cost Index Fluctuation on Apartment Housing)

  • 박원영;박태일
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 춘계 학술논문 발표대회
    • /
    • pp.226-227
    • /
    • 2019
  • The basic type construction cost which is the base of the building cost estimation is being adjusted according to the price changes by utilizing the apartment construction cost index in order to flexibly operate it. In this study, we analyzed the change trends and characteristics of the housing cost index for the basic type building cost model project operated from September, 2012 to March, 2018. As a result, the increase in material costs is slight while the share of the labor cost increased in the construction cost due to the rise of labor unit price, leading to a perceived increase in sensitivity of labor costs. We should be careful to keep the sensitivity of the material cost and the labor cost to an appropriate level so that the index may not be distorted.

  • PDF

서울시 철도터널 건설공사의 공사계측비 분석 및 개선방안 연구 (A Study on Analysis of Construction Monitoring Cost and Improvement Measures of Railway Tunnel Construction in Seoul)

  • 우종태
    • 한국재난정보학회 논문집
    • /
    • 제19권1호
    • /
    • pp.18-30
    • /
    • 2023
  • 연구목적: 본 연구는 서울시 철도터널 건설공사의 공사계측비 분석 및 개선방안을 도출하여 건설계측의 신뢰향상으로 계측기술 발전에 기여한다. 연구방법:공사계측비의 설계 및 계약 현황, 공사계측비의 적용 현황 및 분석, 안전관리비와 품질관리비 분석, 이를 개선하기 위해 계측관리용역에 대한 대가 산정기준 적용 확대와 발주처에서 직접 발주하는 방안을 제시한다. 연구결과: 그동안 건설공사에 포함하여 발주하던 계측관리용역을 입찰참가자격 사전심사를 통하여 발주처에서 계측업체를 직접 선정하여 계측을 수행하면 계측 품질을 높이고 정확한 계측데이터 확보가 가능하다. 결론:계측관리용역에 대한 대가 산정기준은 시공사에서 하도급으로 수행하게 되는 순공사비 내에 포함하는 방식이 아닌 발주처 직접 발주로 엔지니어링진흥법에 따른 실비정액가산방식과 지반조사 표준품셈의 계측관리비 산출기준의 적용을 확대해야 한다.

도로포장 및 유지공사 표준품셈 개정 방법에 대한 연구 (A Study on the Standard of Cost Estimation in the Construction of Pavement and Maintenance)

  • 정대권;태용호;안방률;조윤호
    • 한국도로학회논문집
    • /
    • 제11권1호
    • /
    • pp.85-94
    • /
    • 2009
  • 실적공사비 적산방식은 품셈견적, 실측견적, 단가견적, 및 총액견적 등 매우 다양하다. 표준품셈은 공공기관 및 민간기관의 공사비 책정기준이 되는 자료이다. 본 논문에서는 도로공사에 이용되는 기존 품셈견적의 문제점을 개선하기 위해 현장조사를 실시하고 분석하였으며 그 결과로 각 공종에 대한 실측견적 방법을 통계적 방법을 통해 제시하였다. 또한, 기존 품셈과 실측품셈을 공사단위의 비교를 통해 제안된 품셈이 보다 간단한 견적 작성을 가능하게 하고 보다 현실적인 공사금액을 산출함을 알 수 있었다. 본 연구에서는 보조기층의 Case-Study를 통하여 각 방식별 장단점을 가시적으로 비교해 보았다. 실측품셈으로 적용하였을 경우, 계산과정은 기존품셈의 50%로 축소되었으며 1일 1장비 사용으로 기존의 1일미만 장비 사용에 대한 편차가 보완되었다. 또한 품셈만을 이용하여 공정의 시공내용을 짐작하고 이를 바탕으로 공정계획이나 인력투입계획 등을 수립할 수 있었다.

  • PDF

건설공사 유지보수품셈 사례조사 연구 (Case Study on the Construction Standard Production Rate for Operation and Maintenance Technology)

  • 안방율;박태일
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 춘계 학술논문 발표대회
    • /
    • pp.250-251
    • /
    • 2019
  • Lots of infrastructures have been newly constructed through the rapid economic growth of 1970's. Since the infrastructures has mostly deteriorated and this circumstance makes the need for maintenance and rehabilitation(M&R) of infrastructures to obtain the convenience and safety of users even more essential. Although markets for M&R project become larger, the construction standards for cost estimation of M&R work are insufficient. Thus, the purpose of this study is to examine the present state of standards for cost estimation of M&R works using case studies. Finally, this work could be utilized as the basis for the development of national standard for estimation of M&R work.

  • PDF

건설현장 시장가격 모니터링을 위한 온라인 상시조사에 관한 기초연구 (Study of a Online Survey System for Monitering of Construction Cost on Construction Site)

  • 이주현;백승호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2020년도 봄 학술논문 발표대회
    • /
    • pp.202-203
    • /
    • 2020
  • Unlike price calculation by cost accounting, which categorizes costs into material costs, labor costs, and miscellaneous expenses to determine the construction budget price, construction cost calculation based on Construction Standard Unit Prices utilizes unit prices extracted from market prices of items from projects already completed to estimate costs of similar construction projects. Although unit price information is collected through construction site surveys to revise these construction standard unit prices every year, but due to the limitations of the site survey method, it is difficult to quickly implement the rapid changes in the construction methods and market prices. As such, an important issue that arose was the identification of work items whose prices need urgent revision. This study conducted research on factors that need to be considered when developing online survey system for monitoring construction site market prices. This study is expected to enhance convenience for users, and provide an efficient data collection and management system for administrators.

  • PDF