• Title/Summary/Keyword: Construction Stage Analysis

Search Result 923, Processing Time 0.026 seconds

A Study on the Current Status and Improvement of BIM in the Government Owner Perspective - Focus on the KEPCO Na-Ju Head Office Project - (공공시설 발주자 관점에서의 BIM 적용 현황 및 개선방안 연구 - 한국전력공사 나주 신사옥 건립공사 사례를 중심으로 -)

  • Sim, Gu-Sik;Kim, Sung-Man;Ahn, Jae-Hong
    • Journal of KIBIM
    • /
    • v.3 no.2
    • /
    • pp.19-27
    • /
    • 2013
  • The application of the BIM for the KEPCO' new headquarters in Naju involved alternative approaches and accompanied many trials-and-errors as the project adopted new targets and purposes that were not used in Korea before. In particular, for a large BIM-based project, clearly defining the BIM-including the objective, scope and the outcome-is critical for a project owner. For a successful implementation, project owners should improve the utilization of the BIM. Against this background, this research examines the case of the BIM application for the KEPCO' new headquarters in Naju, identifies its effects and problems, and proposes how to improve application of the BIM for public projects. The improvement in the BIM application can be divided into several stages: project order, design development, construction, and post-construction maintenance. In the initial stage, it is important to fully discuss the project planning among participants, and clarify the goal, scope, expected outcomes and role of the BIM. In the design stage, the level of detail (LOD) for the 3D model should be defined in consideration of information use in the stages of estimation and construction. In the construction stage, the scope of project that is managed based on the processing and use of the BIM data should be clearly given and understood. After construction is complete, measures should be sought to use the BIM for maintenance, and corresponding requirements and outcomes should be provided. The analysis is expected to provide basic data for successful implementation of BIM-based public projects, by assisting project owners and involved parties in enhancing work in different stages of a project.

Structural Performance of a New Truss Deckplate System with UHPC Infilled Top Chords in Construction Stage (UHPC 충전형 상현재를 활용한 트러스 데크플레이트 시스템 시공단계 구조성능 평가)

  • Son, Hong-Jun;Kim, Young-Ho;Kim, Dae-Jin
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.33 no.2
    • /
    • pp.137-144
    • /
    • 2020
  • In this study, we propose a new truss deckplate system, which does not require temporary floor supports during construction, with ultra-high-performance concrete (UHPC) infilled top bars. The increased stiffness and strength of the proposed system were well retained as compared to those of the existing truss deckplate systems, thereby resulting in the reduction of maximum deflection at the span center. Four-point bending tests were performed on five specimens with a net span of 4.6 m to evaluate the structural performance of proposed system in the construction stage. In addition, the load-deflection curve was plotted for each specimen, and the effects of test parameters were analyzed. Further, a rigorous nonlinear three-dimensional finite element analysis was performed, and its results were compared with the test results. From the results, it was observed that the test specimens of the proposed system exhibited superior performance as compared to those of the existing one and also satisfied the serviceability requirement during construction provided by the Korea Building Code 2016.

Analysis of structure stability of Golf structure of truss (골프장 트러스구조 구조안전성 검토사례)

  • Kang, Dong-Gyun;Yoon, Sung-Won;Hong, Hyun-Pyo
    • 한국공간정보시스템학회:학술대회논문집
    • /
    • 2004.05a
    • /
    • pp.275-278
    • /
    • 2004
  • This paper focused on problems of design, construction, and maintenance caused by construction implementation processes. They were analyzed through case study of structure safety diagnosis projects. From the case study, it is expected that the introduction of Construction Management from the first stage of procurement will improve construction cost increase or burden on small design company. It strengthens coherent management from design and source contractor selection to build review of responsibility. The coherency will prevent changes in designing or infirm unreliable construction. It is desirable that expert opinions are considered when structure changes and establishment occur and that, if necessary, actions such as source selection, periodic audits, and diagnosis arc checked and fed back to maintenance.

  • PDF

Analysis of Construction RCB Exterior Wall Formwork Placing High on Nuclear Power Plant (원자력 발전소 RCB 외벽 거푸집 1단 타설 높이별 시공성 분석)

  • Song, Hyo-Min;Shin, Yoon-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.205-206
    • /
    • 2014
  • It is very important to reduce the construction duration of the Reactor Containment Building (RCB) when considering the more than 50 months on average from concrete placement to completion. The purpose of this study attempts to evaluate the single-stage workability of the system given a change in the height of the setting of RCB exterior wall formwork to be used in nuclear power plant construction. As a result of this study, it is possible height of 3.5m~4m uses formwork when analyzing the construction period and material costs an increase in formwork by concrete lateral pressure, to ensure the workability of the RCB exterior wall formwork. Through this study, I want to provide as basic data for the improvement of workability and RCB shortening the construction period.

  • PDF

Development of Productivity Analysis Simulation Model for Formwork Based on 3D Printing Technology Using ARENA (ARENA를 활용한 3D 프린팅 기술 기반 거푸집 공사의 생산성 분석 시뮬레이션 모델 개발)

  • Ahn, Heejae;Lee, Changsu;Kim, Harim;Kim, Taehoon;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.188-189
    • /
    • 2021
  • The technology of manufacturing freeform molds with S-LOM based 3D printer has advantages in the production period and the curvature range. However, there is no any support tool about productivity analysis of S-LOM technology because S-LOM technology is early-stage technology. There can be problems about increase of construction time and cost without any decision support tool like productivity analysis models etc. Therefore, in this study, the productivity analysis simulation model for freeform formwork based on S-LOM technology was developed using ARENA software. The process and logic of manufacturing freeform molds can be easily visualized in this model. Futhermore, the resource like labor, equipment and material can be easily optimized with this model. As a result, it can contribute to preventing the increase of construction time and cost in formwork with further productivity analysis.

  • PDF

A Study on the Simulation Evaluation of IAQ at the Process of Building Construction (건물 시공단계의 실내공기질 시뮬레이션 평가 연구)

  • Choi, Jeong-Min;Cho, Sung-Woo;Park, Chang-Seob;Park, Min-Yong;Lee, Kyung-Hee
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.19 no.1
    • /
    • pp.60-67
    • /
    • 2007
  • The purpose of this study is to evaluate indoor air quality at the stage of building construction. To check the IAQ at the stage of construction IAQX simulation program developed by EPA was used and the values of TVOC were analyzed with time-series. The Simulation conditions are as follows. 1) Ventilation rate, 2) Time schedule of works, 3) Material change. Through this simulation, the major factors which affect the IAQ were analyzed and the importance of empirical data about the time-series emission rate of concerned material could be confirmed.

Development of Automation Technology for Structural Members Quantity Calculation through 2D Drawing Recognition (2D 도면 인식을 통한 부재 물량 산출 자동화 기술 개발)

  • Sunwoo, Hyo-Bin;Choi, Go-Hoon;Heo, Seok-Jae
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.227-228
    • /
    • 2022
  • In order to achieve the goal of cost management, which is one of the three major management goals of building production, this paper introduces an approximate cost estimating automation technology in the design stage as the importance of predicting construction costs increases. BIM is used for accurate estimating, and the quantity of structural members and finishing materials is calculated by creating a 3D model of the actual building. However, only 2D basic design drawings are provided when making an estimating. Therefore, for accurate quantity calculation, digitization of 2D drawings is required. Therefore, this research calculates the quantity of concrete structural members by calculating the area for the recognition area through 2D drawing recognition technology incorporating computer vision. It is judged that the development technology of this research can be used as an important decision-making tool when predicting the construction cost in the design stage. In addition, it is expected that 3D modeling automation and 3D structural analysis will be possible through the digitization of 2D drawings.

  • PDF

A Study on Axial Stress Measurement and analysis of High-rise Building Structure Health Monitoring (초고층 구조물 건전성 모니터링을 위한 축응력 계측 및 해석에 관한 연구)

  • Lee, Jong-Ho;Kim, Seon-Gyu;Chun, Young-Jun;Lee, Seung-Min;Im, Jong-Soon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.91-92
    • /
    • 2015
  • This study was performed for application of Structural Health Monitoring system of Jamsil Lotte World Tower. Axial stresses of mega column and core wall are measured in the past 29 months for axial stress monitoring and evaluating predicted self weight. We use the midas gen program(FEM analysis program) with construction stage analysis mode to predict axial stress. 8 mega column axial stressmeters are installed at 21st floor and 4 core wall stressmeters are installed at 38th floor. Measurement data was obtained without creep and shrinkage effect.

  • PDF

A STUDY ON THE TECHNOLOGY LEVEL AND ITS DEVELOPMENT STAGE OF KOREAN CONSTRCUTION INDUSTRY (우리 나라 건설산업의 기술수준 및 기술개발 단계와 건설기술발전 방향)

  • 박병무;이태식
    • Journal of Technology Innovation
    • /
    • v.2 no.1
    • /
    • pp.170-190
    • /
    • 1994
  • The importantce of a development of competitiveness in domestic construction industry is growing as some of domestic construction markets is scheduled to open to foreign competing firms with higher level of construction technology and management. A national level of competitiveness in domestic construction industry and firms are partially, but significantly, affected by a technology level and a characteristics of production pattern. The purpose of the study is mainly to analyze and identify a technology level, production pattern and a development stage of R&D activities of domestic construction industry and firms. Based on these findings the study draws on a concluding remarks and derives technology policy implications. Results of analysis in the study impliy that (1) competitiveness of domestic construction firms(industry) in terms of technology level is relatively weak as compare to that of advanced foreign competing firms, (2) degrees of substitution of capital for labor are seemed to be relatively high, (3) R&D (investment) activities of domestic construction firms are generally spread out in forms of import, adjustment and betterment, and (4) only a small number of big domestic construction firms are seemed to afford to R&D investment for research facilities and equipments, but not enough for higher level of R&D man-power. The study suggests that technology policy for construction industry should be based on a fundamental policy directions. For example the increase in size and heightened quality level of R&D man-power should be placed in a top priority in policy agenda. Sound and specific policy items should be developed for planning and design, and maintenace and inspection technology in order to lead domestic industry to compete with foreign firms with full strength.

  • PDF

Washland Constructions and Effectiveness Analysis of Flood Control using MD-FDA (다차원법을 이용한 천변저류지의 홍수조절 효과분석)

  • Kwak, Jae Won;Kim, Duck Gil;Yin, Shan Hua;Kim, Hung Soo
    • Journal of Wetlands Research
    • /
    • v.10 no.3
    • /
    • pp.69-78
    • /
    • 2008
  • In recent, we have a growing interest in the washland construction for the satisfaction of flood mitigation and ecological function in the river. This study performed the flood mitigation analysis for washland construction plan in Topyoung-cheon basin in Changyeong-gun, Gyeongnam. Several cases were considered for the washland construction on Topyoung-cheon basin, and we analyzed flood stage, inundation and flood damage mitigation for each case. From the result of flood mitigation analysis, we found some significant results according to the combination of each washland case and form. Therefore, to maximize flood mitigation effect by flood mitigation analysis is more desirable than guarantee the maximum storage area in washland construction.

  • PDF