• 제목/요약/키워드: Construction Stage Analysis

검색결과 923건 처리시간 0.028초

BIM-DRIVEN ENERGY ANALYSIS FOR ZERO NET ENERGY TEST HOME (ZNETH)

  • Yong K. Cho;Thaddaeus A. Bode;Sultan Alaskar
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.276-284
    • /
    • 2009
  • As an on-going research project, Zero Net Energy Test Home (ZNETH) project investigates effective approaches to achieve whole-house environmental and energy goals. The main research objectives are (1) to identify energy saving solutions for designs, materials, and construction methods for the ZNETH house and (2) to verify whether ZNETH house can produce more energy than the house uses by utilizing Building Information Modeling (BIM) and energy analysis tools. The initial project analysis is conducted using building information modeling (BIM) and energy analysis tools. The BIM-driven research approach incorporates architectural and construction engineering methods for improving whole-building performance while minimizing increases in overall building cost. This paper discusses about advantages/disadvantages of using BIM integrated energy analysis, related interoperability issues between BIM software and energy analysis software, and results of energy analysis for ZNETH. Although this investigation is in its early stage, several dramatic outcomes have already been observed. Utilizing BIM for energy analysis is an obvious benefit because of the ease by which the 3D model is transferred, and the speed that an energy model can be analyzed and interpreted to improve design. The research will continue to use the ZNETH project as a testing bed for the integration of sustainable design into the BIM process.

  • PDF

A SYSTMATIC APPROACH FOR APPORTIONING CONCURRENT DELAY

  • Nie-Jia Yau;Chia-Chi Chang
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.520-529
    • /
    • 2007
  • Apportioning responsibilities of concurrent delay to the owner and the contractor is a difficult task, due to the sophisticate nature both in the schedule and in the factors that cause the delay. This research attempts to develop a simplified yet systematic approach that can be used for a fair apportionment of concurrent delay. A concurrent delay is defined herein as when the contractor and the owner have both caused independent critical path delays during the same approximate time period. Incorporating the concepts of windows analysis and critical path method (CPM), the developed approach has three "windowing of delay" steps to quickly apportion the delay in each of these windows, and a fourth step to sum up those apportioned delays to obtain each party's final responsibilities. This developed approach is found to be simple and effective at this stage; it will be tested against real cases in the near future.

  • PDF

SELECTING OPTIMUM MANAGEMENT PRACTICES IN PRE-CONSTRUCTION PHASE CONSIDERING PROJECT CHARACTERISTICS

  • Hee-Sung Cha;Ki-Hyun Kim;Young-Jin Ko
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.609-613
    • /
    • 2011
  • The importance of project performance management as an alternative for solving problems is rising, which are followed by the difficulties of managing construction project in the construction industry. This research classifies and applies the potential improvement made by the construction practitioners. In order to apply influential factors for success on the construction project, the research identifies the relationship between the factors and performance management practices. In addition, in order to predict the results reflecting the project characteristics which are un-improvable by the construction managers in the initial stage of construction, the effect of project characteristics to the identified management practices have been drawn by performance area. Finally, in order to improve the predicted performance, this research provides a framework in setting valid best practices according to the performance areas through a statistical analysis between the best practices and project characteristics through the industry survey.

  • PDF

수화열을 고려한 침매 터널의 효율적 시공 (Efficient Construction of the Immersed Tunnel Considering Hydration Heat)

  • 전세진;최명성;김영진;장영;안제상
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2005년도 추계 학술발표회 제17권2호
    • /
    • pp.587-590
    • /
    • 2005
  • This study investigates the efficient construction scheme of the immersed tunnel focusing on the hydration heat. In this respect, some alternatives in curing, temperature condition and removing of the forms are compared together to meet the required criteria. It is addressed that the strict construction stage analysis considering the placing scheme of concrete is one of the key factors to trace the realistic structural behavior for the hydration heat.

  • PDF

A Comparison of Construction Cost Estimation Using Multiple Regression Analysis and Neural Network in Elementary School Project

  • Cho, Hong-Gyu;Kim, Kyong-Gon;Kim, Jang-Young;Kim, Gwang-Hee
    • 한국건축시공학회지
    • /
    • 제13권1호
    • /
    • pp.66-74
    • /
    • 2013
  • In the early stages of a construction project, the most important thing is to predict construction costs in a rational way. For this reason, many studies have been performed on the estimation of construction costs for apartment housing and office buildings at early stage using artificial intelligence, statistics, and the like. In this study, cost data held by a provincial Office of Education on elementary schools constructed from 2004 to 2007 were used to compare the multiple regression model with an artificial neural network model. A total of 96 historical data were classified into 76 historical data for constructing models and 20 historical data for comparing the constructed regression model with the artificial neural network model. The results of an analysis of predicted construction costs were that the error rate of the artificial neural network model is lower than that of the multiple regression model.

지하철 인접 지상구조물 설치시 기존 지하철 안정성 확보 위한 종합관리대책 수립 연구 (Study on Establishing Comprehensive Management Measures to Ensure Stability of Existing Metro when Constructing Ground Structures Adjacent to Subway)

  • 임재홍;조국환
    • 터널과지하공간
    • /
    • 제34권3호
    • /
    • pp.196-207
    • /
    • 2024
  • 근래 들어 도심지 구간에서 공동주택 건설과 같은 개발행위가 빈번히 이루어짐에 따라 운영 중인 기존 지하철과 인접하여 지상구조물이 시공되는 경우 지하철 구조물 및 궤도에 영향을 끼쳐 안정성 및 사용성에 문제를 발생시킬 수 있다. 본 연구에서는 지하철 인접 지상구조물 시공시 기존 지하철의 안정성 확보를 위한 종합관리대책을 제안하였다. 기존 지하철에 대한 근접도 평가, 기존 구조물 안정성 검토, 궤도 안정성 검토, 집중관리구간 선정 및 계측계획 수립 등의 4단계 종합관리대책을 수립하여 인접시공 영향을 최소화하였다. 1단계 근접도 평가를 통해 계측 점검주기를 선정하고, 2단계 시공단계 및 지하수 영향을 고려한 3차원 수치해석을 통해 기존 지하철 및 정거장 구조물의 변위, 응력 등 안정성을 검토하고, 3단계 궤도틀림 등 궤도 안정성을 검토하여 열차운행의 안전성을 검토하며, 4단계 수치해석 결과를 바탕으로 변위 집중구간을 집중관리구간으로 선정하여 중점적인 계측관리가 수행하도록 제안하였다.

건설사업관리자(CMr) 측면에서 건설기술용역 평가의 CSFs 추출 및 AHP 중요도 분석 (CSFs Extraction and AHP Importance Analysis for Construction Technology Services Evaluation in terms of Construction Manager)

  • 양진국;홍성욱
    • 대한건축학회논문집:구조계
    • /
    • 제36권3호
    • /
    • pp.129-134
    • /
    • 2020
  • The current evaluation time period for the construction management service is the project completion or after project completion. Therefore, the construction manager has the following problems. First, it is difficult to prepare the evaluation due to the new field movement of the existing participating engineer. Next, the CM work is complex as well as extensive. Therefore, the critical success factors of the construction technology services evaluation are required as a systematic performance standard of CM work. In this study, we extracted the critical success factors that can systematically prepare the evaluation from the early stage of the project through in - depth interviews with experts. And, this study was analyze the priority of each factor by using AHP technique. As a result, the most important factors were related to the systemization of the preparation process, the construction manager work capabilities and practical construction management. And the priorities of all factors were analyzed high in the factors suggested by the owner groups. The results of this analysis are expected to provide the standards that construction management service performer carry out structured management of construction management throughout the project.

합성형 사장교의 시공단계해석 및 시공관리 시스템 개발 (Development of Structural Analysis and Construction Management System for Composite Cable Stayed Bridges)

  • 서주원;박정일;김남식;심옥진
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 1994년도 가을 학술발표회 논문집
    • /
    • pp.95-102
    • /
    • 1994
  • This paper presents a Cable Stayed Bridge Construction Management System, which consists of Structural System Identification Method (SSIM), Error Sensitivity Analysis and Optimum Error Adjustment & Prediction System. The 1st System Identification Method builds an error influence matrix using the linear superposition of each error modes. The 2nd SSIM also considers the second error mode term, which shows good error factor estimation. The optimal cable adjustment can be accomplished within the allowable range of both cable tension and camber. The Post processor, constituted with Motif and GL library on SGI platform, is useful for monitoring construction stage management by displaying construction data, adjustment and prediction results at each construction step.

  • PDF