DOI QR코드

DOI QR Code

A Comparison of Construction Cost Estimation Using Multiple Regression Analysis and Neural Network in Elementary School Project

  • Received : 2012.10.15
  • Accepted : 2012.10.30
  • Published : 2013.02.20

Abstract

In the early stages of a construction project, the most important thing is to predict construction costs in a rational way. For this reason, many studies have been performed on the estimation of construction costs for apartment housing and office buildings at early stage using artificial intelligence, statistics, and the like. In this study, cost data held by a provincial Office of Education on elementary schools constructed from 2004 to 2007 were used to compare the multiple regression model with an artificial neural network model. A total of 96 historical data were classified into 76 historical data for constructing models and 20 historical data for comparing the constructed regression model with the artificial neural network model. The results of an analysis of predicted construction costs were that the error rate of the artificial neural network model is lower than that of the multiple regression model.

Keywords

References

  1. Park MS, Seong KH, Lee HS, Ji SH Kim SY. Schematic Cost Estimation Method using Case-Based Reasoning / Focusing on Determining Attribute Weight. Korean Journal of Construction Engineering and Management. 2010 Jul;11(4):22-31. https://doi.org/10.6106/KJCEM.2010.11.4.22
  2. An SH, Yoon JE, Kang KI. A Study on the Assessment Model of Preliminary Cost Estimates Using Discriminant Analysis. Journal of the Architectural Institute of Korea (Structure and Construction). 2005 Sep;21(9):169-77.
  3. Kim JW, Lee BR, Kim JH, Kim JJ. A Study on Construction Cost Estimation Model According to the Spatial Planning of Educational Facilities using Regression Analysis / For the BTL Project in the Gyeonggi-do Region. Journal of the Architectural Institute of Korea (Planning and design). 2011 Oct;27(10):103-10.
  4. Kim SK. A study on the hybrid cost model of apartment housing projects in the early design stage [Dissertation]. [Seoul (Korea)]: Seoul National University; 1992. 214 p.
  5. Singh S. Cost estimation of structures in commercial buildings. New York (NY): Macmillan; 1994. 185 p.
  6. Singh S. Cost model for reinforced concrete beam and slab structures in building. Journal of Construction Engineering and Management. 1990 Mar;116(1):54-67. https://doi.org/10.1061/(ASCE)0733-9364(1990)116:1(54)
  7. Kim KD. A Study on the Development of the Cost Model for the Domestic Apartment House [Dissertation]. [Seoul (Korea)]: Seoul National University; 1991. 194 p.
  8. Choi IS, Hong SH, Son CB, Ko SC. A Study on the Prediction Model of Construction Cost in High-Rise Office Building of SRC Type. Journal of the Architectural Institute of Korea (Structure and Construction). 1999 Jul;15(7):143-51.
  9. Moselhi O. Hegazy T. Fazio P. Neural networks as tools in construction. Journal of Construction Engineering and Management. 1991 Dec;117(4):606-25. https://doi.org/10.1061/(ASCE)0733-9364(1991)117:4(606)
  10. Boussabaine AH. The use of artificial neural networks in construction management: a review. Construction Management and Economics. 1996 Oct;14(1):427-36. https://doi.org/10.1080/014461996373296
  11. Mckim R. Neural network application to cost engineering. Cost Engineering. 1993 Jul;35(7):31-5.
  12. Yeh IC. Quantity estimating of building with logarithm-neuron networks. Journal of Construction Engineering and Management. 1998 Oct;124(5):374-80. https://doi.org/10.1061/(ASCE)0733-9364(1998)124:5(374)
  13. Bode J. Neural networks for cost estimating: simulation and pilot application. International Journal of Production Research. 2000 Nov;38(6):123-54.
  14. Kim SK, Koo IW. A Neural Network Cost Model for Office Buildings. Journal of the Architectural Institute of Korea. 2000 Sep;16(9):59-67.
  15. Garza J, Rouhana K. Neural network versus parameter-based application. Cost Engineering. 1995 Feb;37(2):14-8.
  16. Park WY, Cha JH, Kang KI, A Neural Network Cost Model for Apartment Housing Projects in the Initial Stage, Journal of the Architectural Institute of Korea, 2002 July;18(7):155-62.
  17. Kim GH, An SH, Cho HK. Comparison of the Accuracy between Cost Prediction Models based on Neural Network and Genetic Algorithm / Focused on Apartment Housing Project Cost. Journal of the Architectural Institute of Korea. 2006 Mar;23(3):111-8.
  18. Kim CY, Son JH. A Study on the Model of Artificial Neural Network forConstruction Cost Estimation of Educational Facilities at Conceptual Stage. Korean Journal of Construction Engineering and Management. 2006 Aug;7(4):91-9.
  19. Son JH, Kim SK, Kim JO. A Study on the Analysis and Estimation of the Construction Cost by Using Artificial Neural Network in the BTL Projects for Educational Facilities. Journal of Architectural Institute of Korea. 2008 Jul;24(6):135-42.
  20. Kim GH. Construction Cost Prediction System Based on Artificial Intelligence at the Project Planning Stage [Dissertation]. Seoul (Korea): Korea University; 2004. 230 p.
  21. Lim YD, Lee SB. Fuzzy.Sin'gyeongmang.Yugeonjinhwa [Fuzzy.Neural network.Genetic evolution]. Seoul (Korea): Insol Media; 1999. 272 p. Korean.
  22. An SH, Kang KI. A Study on the Cost Model of Underground Parking Lot of Apartment Housing Projects in the Early Stage. Journal of the Architectural Institute of Korea (Structure and Construction). 2005 May;21(5):135-42.
  23. Lee YM, Lee MH, Lee HK. The Study on the System to Estimate the Cost by Using Regression in the Early Stage of the Project. Proceeding of Korea Institute of Construction Engineering and Management; 2006 Nov 11; Suwon, Korea. Seoul (Korea): Korea Institute of Construction Engineering and Management; 2006. p. 274-7.
  24. Jung MJ, Lee HS, Park MS. Cost Estimating for Military Facilities at Early Construction Stage Focusing on Military Barracks. Proceeding of Korea Institute of Construction Engineering and Management; 2009 Nov 19-20; Daejon, Korea. Seoul (Korea): Korean Institute of Construction Engineering and Management; 2009. p. 195-8.
  25. Hyun CT, Moon HS. Model for Predicting Cost and Cost Range of the Public Office Building at the Planning Phase. Journal of the Architectural Institute of Korea (Structure and Construction). 2010 Jun;26(6):139-48.
  26. Lee HS, Jung M, Park M, Son BS. Cost Estimating for Public Facilities at Early Stage Using Functional Area Cost - Focusing on Army Barracks. Korean Journal of Construction Engineering and Management. 2010 Nov;11(6):3-13. https://doi.org/10.6106/KJCEM.2010.11.6.3
  27. Hegazy T, Moselhi O, Fazio P. Developing practical neural network applications using back-propagation. Computer-Aided Civil and Infrastructure Engineering. 1994 Mar;9(2):145-59. https://doi.org/10.1111/j.1467-8667.1994.tb00369.x
  28. Kim GH, Kang KI. A Study on Model of Neural Networks Training by Genetic Algorithms for Predicting Cost Estimates of Apartment Projects at the Early Project Stage. Journal of the Architectural Institute of Korea. 2003 Oct;19(10):133-42.
  29. Kim GH, Kang KI. A Study on Predicting Cost Estimation of Apartment Building Using Neural Network's Architecture Optimized by Genetic Algorithms. Journal of the Architectural Institute of Korea. 2004 Feb;20(2):81-8.
  30. Kim GH, Kim SY, Kang KI. Comparing Accuracy of Prediction Cost Estimation Using Case-Based Reasoning and Neural Networks. Journal of the Architectural Institute of Korea. 2004 May;20(5):93-102.
  31. Kim GH, An SH. A Study on the Correlation between Selection Methods of Input Variables and Number of Data in Estimation Accuracy / Cost Estimation using Neural Networks in Apartment Housing Projects. Journal of the Architectural Institute of Korea. 2007 Feb;23(4):129-37.

Cited by

  1. A hybrid methodology to estimate construction material quantities at an early project phase vol.17, pp.3, 2017, https://doi.org/10.1080/15623599.2016.1176727
  2. A Process for the Development and Evaluation of Preliminary Construction Material Quantity Estimation Models Using Backward Elimination Regression and Neural Networks vol.7, pp.3, 2014, https://doi.org/10.1080/1941658X.2014.984880
  3. Comparison of School Building Construction Costs Estimation Methods Using Regression Analysis, Neural Network, and Support Vector Machine vol.01, pp.01, 2013, https://doi.org/10.4236/jbcpr.2013.11001
  4. A Study on Estimating Construction Cost of Apartment Housing Projects Using Genetic Algorithm-Support Vector Regression vol.15, pp.4, 2014, https://doi.org/10.6106/KJCEM.2014.15.4.068
  5. Application of Boosting Regression Trees to Preliminary Cost Estimation in Building Construction Projects vol.2015, 2015, https://doi.org/10.1155/2015/149702