During the construction project period, a lot of change orders happen in the design and construction stage Especially, The change order during construction stage causes the huge construction cost increase and duration delay. Accordingly, research on the change order of the construction stage is being progressed relatively active in the design stage, but the design changes are rarely made. In the design stage, the owner has to pay a design addition cost when change order due to the demands of owner happens. However Korea has not the specific standard about design additional cost in design stage. Therefore, this study analyzes problems of design additional cost estimation methods through the case study, and then indicates the method that the ratio distributes to details dividing design tasks and the method of the PM(Project Management). Eventually, this study expects to minimize claim related the design additional cost in design stage.
건설사업관리 업무를 수행하는데 있어 설계이전단계인 사업기획단계, 기본설계 및 실시설계단계가 시공단계보다 중요한 비중을 차지하고 있다. 그러나 건설기술관리법상 건설사업관리 대가 기준으로 본 인력투입기준은 설계이전단계의 중요성을 고려하지 않고 있는 실정이다. 이러한 현실적 상황에 따라 본 연구에서는 건설사업관리 업무의 설계이전단계 인력투입 적정성을 분석하여 개선방안을 제시하는 것을 목적으로 건기법의 용역대가기준과 건설사업관리 용역 4곳의 현장을 비교 분석 하였다. 연구결과 사업수행에 있어 개선된 인력투입의 적정성 분석은 다음과 같이 나타났다. 1)실제 건설사업관리 용역의 단계별 대가평균기준의 인력투입현황을 사업기획단계 신설(6.6%), 기본설계단계(3.9%$\rightarrow$5.6%), 실시설계단계(7.6%$\rightarrow$13.5%), 시공단계(88.5%$\rightarrow$64.0%), 유지관리단계 신설(10.3%)로 제안하였다. 제안된 대가평균기준을 총공사비 기준으로 분류하여 개선후의 요율과 단계별로 산정하여 제시하였다. 2) 건설기술관리법 기준인 3단계기준을 사업기획단계, 유지관리단계를 포함하여 단계별 업무를 구분하여 5단계로 제시하였다. 이와 같은 결과는 건설사업관리 용역현장의 대가 표준 산정이 현실적이고 탄력적으로 운용되고 단계별 인력투입에 대한 제도개선이 현실적으로 이루어져야하는 것으로 볼 수 있다.
The duty of construction clients in WSH (Workplace Safety and Health) system was included in the amendment of Occupational Safety and Health Act (enforced on 16 January 2020), which was estimated the shift of paradigm in the prevention of construction accidents. The purpose of this paper is to introduce the analysis results of construction clients' role in the construction project, which were performed by authors over the recent years in order to impose the duty on construction clients, and to suggest their role according the plan, design, and construction stage. Utilizing the systematic literature review process based on Meta analysis, the related papers were selected. For the selected papers, related domestic and foreign regulations, and other prominent report, the construction clients' role was analyzed by reflecting the experts' advice. Results show that the construction clients should control the designer and contractor for implementing the WHS system during the whole process of the construction project. They should supply sufficient source and time to ensure the workers' safety. In the plan stage, the key role of construction clients is to identify intensively controlled hazard and risk reduction plan and to transfer the results. In the design stage, their key role is to select the designer with the capacity in WSH and to assist the designer for the safety design. The main key role of construction clients in the costruction stage is to select the contractor with specialty in WSH including a contract reflecting the WSH requirement and to check implementation of WSH plan, WSH cost, WSH education, and accident report. In addition, it is thought that the construction clients' participations in the site WSH activity and adjustment of safety and health problem among contractors can be effect in the prevention of construction accidents.
The purpose of this study is to apply the process model of the pre-design stage to CPLM(Construction Project Life-cycle Management). Life-cycle consists of 4 stage; Pre-design, Design, Construction, Maintenance. Each stage has organic relations between front and rear stage. Therefore it is important to manage and use the information data of each stage. But these data are not carried to the next stage smoothly, especially at the pre-design stage. It is even vague to define the process of the pre-design stage. To carry and share the information well, this study defines Pre-design stage process and CPLM at first, VA-Cityplanner which is the development system of the pre-design process model is applied to CPLM for the smooth current of the data between participants.
The aim of this paper is to determine the effect of soil-structure interaction and time dependent material properties on behavior of concrete box-girder highway bridges. Two different finite element analyses, one stage and construction stage, have been carried out on Komurhan Bridge between Elazi$\breve{g}$ and Malatya province of Turkey, over Fırat River. The one stage analysis assume that structure was built in a second and material properties of structure not change under different loads and site conditions during time. However, construction stage analysis considers that construction time and time dependent material properties. The main and side spans of bridge are 135 m and 76 m, respectively. The bridge had been constructed in 3 years between 1983 and 1986 by balanced cantilever construction method. The parameters of soil-structure interaction (SSI), time dependent material properties and construction method are taken into consideration in the construction stage analysis while SSI is single parameter taking into consideration in the one stage analysis. The 3D finite element model of bridge is created the commercial program of SAP2000. Time dependent material properties are elasticity modulus, creep and shrinkage for concrete and relaxation for steel. Soft, medium, and firm soils are selected for evaluating SSI in both analyses. The results of two different finite element analyses are compared with each other. It is seen that both construction stage and SSI have a remarkable effect on the structural behavior of the bridge.
The 2th International Conference on Construction Engineering and Project Management
/
pp.749-758
/
2007
Learning has become an important aspect for any organization to stay relevant and competitive in the corporate world of survival. In construction industry, the international construction joint ventures (ICJVs) provide an excellent platform with opportunity of learning among partners seeking to develop new area of competency and improve their overall competitiveness for their next project endeavor. This paper discusses the development of a conceptual model of effective learning in ICJVs using four major stages of development in a typical joint venture (JV) 's process. The study identified that there are three key constructs that contribute to effective learning comprising learning conditions in the JV's pre-inception stage, success factors of JV for learning in the forming & organizing stage, and learning actions in the implementation & adjustment stage. The effective learning outcomes are measured by the characteristics of learning organization during the JV's completion & evaluation stage. Details and issues of each stage and the methodology of research will be presented and discussed.
When a shaft is excavated in Korea, the mechanized method such as RBM(Raise Boring Machine) or RC(Raise Climber) is used independently of depth. But usually, the mechanized method is useful for the deep depth. On the contrary, when the depth of shaft is short, the cost of excavation increase. So in the case of shaft constructon less than 100m, we need to consider more suitable method of shaft construction such as Stage-cut which is one of blasting methods. Stage-Cut is widely used in the field of shaft construction in Japan as a tool of rock excavation. The main purpose of this study is to provide technical guidance for design and construction of shafts in rock, using Stage-cut method which is suitable for 20m~80m depth shaft. In this study, Blasting tests was performed in field, according to rock classification. Finally, the stage-cut method which is suitable for the geology of Korea was developed.
In construction work, there is often a difference between the estimated construction period and the actual construction period. Accordingly, the project may be delayed from the scheduled date, leading to huge losses due to problems such as increased costs during construction. In this way, it is important to calculate the appropriate construction period at the project planning stage in construction work. To solve this problem, we would like to study a model that will increase the accuracy of the scheduled construction period at the project planning stage. This study compared and analyzed linear regression, Lasso regression, Ridge regression among the types of regression analysis to select an appropriate construction period prediction model to secure an appropriate construction period at the project planning stage to reduce problems during construction.
Climate change caused by greenhouse gas emissions has become a climate crisis that actually threatens us and is making global efforts to solve it. In response, Korea is carrying out a "Green remodeling" project to reduce carbon emissions generated in the building maintenance stage, which has the highest percentage of all carbon emissions. However, Green remodeling is carried out under emergency supervision at the construction stage, but construction supervisors are often non-professionals, and even experienced site directors have difficulty in implementing actual designs if they do not have experience in Green remodeling construction. Therefore, this study aims to derive priorities between construction and construction focus points for each construction in order to standardize the construction of Green remodeling construction works and derive objective guidelines.
This paper shows construction management focused on waste management in construction project in planning stage Construction waste is given a great deal of weight on total waste. And it is issued in government policy. But it show the limit of problem.As a result of having referenced idea as describe above, this paper will be studied by this process. First, present condition of development waste, cases is researched in construction projects. Second, problems of development pattern and management system are investigated and checked in project cases. Third, maintenance and management method project are proposed by application of planning Stage.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.