• Title/Summary/Keyword: Construction Schedule Simulation System

Search Result 41, Processing Time 0.023 seconds

Development of Energy Regeneration Algorithm using Electro-Hydraulic Braking Module for Hybrid Electric Vehicles (회생제동 전자제어 유압모듈을 이용한 하이브리드 차량의 에너지 회수 알고리즘 개발)

  • Yeo, H.;Kim, H.S.;Hwang, S.H.
    • Transactions of The Korea Fluid Power Systems Society
    • /
    • v.5 no.4
    • /
    • pp.1-9
    • /
    • 2008
  • In this paper, an energy regeneration algorithm is proposed to make the maximum use of the regenerative braking energy for a parallel hybrid electric vehicle(HEV) equipped with a continuous variable transmission(CVT). The regenerative algorithm is developed by considering the battery state of charge(SOC), vehicle velocity and motor capacity. The hydraulic module consists of a reducing valve and a power unit to supply the front wheel brake pressure according to the control algorithm. In order to evaluate the performance of the regenerative braking algorithm and the hydraulic module, a hardware-in-the-loop simulation (HILS) is performed. In the HILS system, the brake system consists of four wheel brakes and the hydraulic module. Dynamic characteristics of the HEV are simulated using an HEV simulator. In the HEV simulator, each element of the HEV powertrain such as internal combustion engine, motor, battery and CVT is modelled using MATLAB/$Simulink^{(R)}$. In the HILS, a driver operates the brake pedal with his or her foot while the vehicle speed is displayed on the monitor in real time. It is found from the HILS that the regenerative braking algorithm and the hydraulic module suggested in this paper provide a satisfactory braking performance in tracking the driving schedule and maintaining the battery state of charge.

  • PDF

Development of 4D System based on New Methodology for Visualizing Construction Schedule Data for Civil Engineering Projects (토목시설물 공사관리 시각화를 취한 4D시스템 적용방안)

  • Kang, Leen Seok;Jee, Sang Bok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.1D
    • /
    • pp.95-103
    • /
    • 2006
  • One of the main functions of the 4D system includes visualizing numerical schedule data in construction. The existing 4D tools have an excellent function for simulating building projects that all activities are progressed according to vertical work zone. However, it is not easy to implement all of it in the civil engineering project because the construction activities of highway and railway projects are progressed on the horizontal work zone and the 4D simulation for those projects should include earthwork objects that depend on the natural ground condition. This study suggests a new methodology for improving those limitations of 4D system for the civil engineering project and develops a new system by the suggested methodology. To verify the developed system, this study attempts to simulate 4D object for horizontal elements such as earthwork, paving work and tunneling work. The morphing and multi-texturing techniques developed in the study can be new approaches to simulate 4D object for the earthwork such as cutting and banking whose activities are progressed on the natural ground condition. The research results can be expected as a draft function for improving the application of 4D system in civil engineering projects.

A Simplified MES Implementation for Small-sized Manufacturing Industries with EXCEL VBA (EXCEL VBA를 이용한 중소제조업체용 간이형 MES 구축)

  • Park, Jeong-Hyeon;Yoshida, Atsunori
    • IE interfaces
    • /
    • v.22 no.4
    • /
    • pp.302-311
    • /
    • 2009
  • It's very important to make an effective and optimized production schedule for the small-to-medium-sized factory which have high-variety low-volume manufacturing properties. And now people say that MES is very useful to make scheduling more effectively. But for small-to-medium-sized factory, it is very difficult to build MES system because of fewer infrastructures in the factory, and more to keep it's continuous maintenance and improvement. Therefore it is more important to systematize the production scheduling generation using simpler and easier tools like EXCEL sheet. And it will be needed a new method to make simple MES construction for more efficient production scheduling. This paper proposes the method which can build simple MES easily using a tool of EXCEL VBA for a small-to-medium-sized factory, and introduces an applied case by the proposed method and EXCEL VBA.

Implementation of welding material quantity evaluation system combined with ship design CAD system

  • Ruy, Won Sun;Kim, Ho Kyeong;Cho, Yong Jin;Ko, Dae Eun
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • v.9 no.2
    • /
    • pp.219-226
    • /
    • 2017
  • These days, the great part of design processes in the field of ship or offshore manufacturing are planned and implemented using the CAD system customized for shipbuilding companies. It means that all information for design and production could be extracted and reused at the other useful fields which need cost considerable time and efforts. The typical example is the field of welding material quantity evaluation which is demanded during the construction of ship or offshore structures. The proper evaluation of welding material to be used and the usage of them at the stage of schedule planning are mostly important to achieve the seamless process of production and costing in advance. This study is related to the calculation of welding length and needed welding material quantity at the stage of design completion utilizing the customized CAD system. The calculated welding material quantity would be classified according to welding posture, assembly stage, block, bevel and welding type so as to improve the accuracy of total cost evaluation. Moreover it is possible to predict the working time for welding operation and could be used efficiently for the cost management using the results of this research.

Study on the Characteristics of Thermal Output and Thermal Storage in a Thermally Activated Building System with Phase Change Material (PCM을 활용한 구체축열시스템의 축열 및 방열 특성 연구)

  • Lee, Hyunhwa;Lee, Soojin;Song, Jinhee;Kim, Sumin;Lim, Jaehan;Song, Seung-Yeong
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.25 no.12
    • /
    • pp.647-653
    • /
    • 2013
  • TABS (Thermally Activated Building System) has recently applied by huge commercial buildings, airports, and convention centers in Europe. TABS provides night-time thermal storage by heating or cooling. The embedded water-based heating and cooling system uses the high thermal inertia of concrete in the building construction, in which a heating or cooling pipe is embedded. The aim of this study is to analyze the thermal storage and thermal output of TABS applied with PCM (Phase Change Material). To achieve this, prototypes of TABS and the thermal properties of various PCMs were investigated. By using the simulation program Physibel Voltra 6.0 W, the thermal storage and thermal output were evaluated according to a heating and cooling operation schedule.

Logistical Simulation for On-site Concrete Waste Management in Decommissioning

  • Lee, Eui-Taek;Kessel, David S.;Kim, Chang-Lak
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.17 no.4
    • /
    • pp.389-403
    • /
    • 2019
  • Large amounts of concrete waste are likely to arise from the decommissioning of a Kori-1 nuclear power plant. Several studies have been conducted on decommissioning concrete waste in recent decades, however, they have been limited to contaminated concrete issues or were small pilot-scale experiments. This study constructed two industrial-scale models of on-site concrete waste management for clean as well as contaminated concrete. To evaluate the performance of both the models, simulations were conducted using the Flexsim software. The concrete particle size distribution of Kori-1 and concrete processor properties based on widely used construction equipment were used as sources of input data for the simulations. It was observed that it may take over two years to complete the on-site concrete management processes owing to the performance of existing processors. In addition, it was demonstrated that it is essential to identify bottlenecks in the system and enhance the performance of the relevant processors to avoid delays of the decommissioning schedule. Our results suggest that this novel approach can contribute to developing schedules or expediting delayed activities in the Kori-1 decommissioning project.

A Study on the Development and Application of a Small Shipyard Customized Production Process Planning and Management System (소형조선소 맞춤형 생산공정 계획관리 시스템 개발 및 적용에 관한 연구)

  • Kim, Young-Hun;Hong, Min-Jong;Baek, Seung-Ju;Lee, Won-Seok;Jo, Yong-Hwa;Lee, Dae-Hyung;Lee, Hoon-Sick;Na, Sung-Tae
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.25 no.1
    • /
    • pp.79-86
    • /
    • 2022
  • In general, since the types and types of ships, so complex and various variables are included to measure the amount of construction work. In addition, it is mot easy to predict the schedule or the number of working hours before ship construction, and it is also mostly inaccurate. As a result, the master plan is manually drawn up by the expert's experience, but there are limitations due to various factors. Medium and large shipyards are operating APS(Advanced Planning and Scheduling) system that reflects industrial characteristics to improve productivity in the planning stage, and utilize information from systems such as ERP(Enterprise Resource Planning) system and MES (Manufacturing Execution System). On the other hand, small shipyards rely mostly on manual work such as Excel work based on the experience of the workers. Therefore, this study intends to develop a master plan management system that can efficiently manage the production process from the business planning stage in consideration of the characteristics of small shipyards.

Probabilistic Earlier GMP Calculation Method for Apartment Using CM at Risk (CM at Risk를 적용한 공동주택의 확률론적 초기 GMP 산정방안)

  • Hyun, Chang-Taek;Go, Gun-Ho;Jin, Zhengxun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.3
    • /
    • pp.295-303
    • /
    • 2018
  • In the DBB delivery system, the design stage and the construction stage are separated. Because of this, design changes frequently occur, and problems such as construction cost overrun, schedule delay, and quality deterioration happen as well. Recently, in the construction industry CM at Risk(CM@R) delivery system, which can systematically solve the above-mentioned problems of DBB delivery system, meet various demands of clients, and overcome the limited cost and period. In the CM@R delivery system, the contractor negotiates for a maximum guaranteed price(GMP) with the client at the design stage, and the CM performer carries out the construction within the GMP. However, uncertainties are inherent in the GMP calculation because the calculation is based on unfinished drawings and documents. In this study, a Probabilistic Earlier GMP Calculation Method by combining a probabilistic tool of Monte Carlo simulation with a case based reasoning is proposed so that the uncertainty in GMP calculation is reflected. After the earlier GMP is calculated, a process to calculate the $2^{nd}$ GMP at the time of around 80 % of detailed deign and to negotiate with the client to fix the final GMP is proposed. The Probabilistic Earlier GMP Calculation Method is verified through the case study. In this study, researchers set the range of GMP through the proposed probabilistic GMP calculation and tried to reduce the risk through negotiation between the client and the CM performer. The proposed method and process would contribute to the successful introduction of CM@R in Korea.

A Study on Traffic Supporting System Enhancing the Safe Passage under Sea Bridge for Towing Vessels (예부선의 해상교량 안전통항을 위한 안전운항지원시스템 구축에 관한 연구)

  • Lee, Yun-Sok;Yun, Gwi-Ho;Park, Young-Soo;Kim, Jong-Sung;Cho, Ik-Soon
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.13 no.4
    • /
    • pp.71-78
    • /
    • 2007
  • Towing vessels have carried out the important role and service in the maritime industry construction, such as port and sea bridge construction, fairway dredging and sea reclamation etc. Furthermore, tugboat takes the largest portion in number of vessel at the domestic registry and barges as big as the general merchant vessel, which are getting specialized and larger, are in operation. In spite of the increase of marine accidents under this situation, there has been no proper measure for the safe navigation of tugboat in the aspect of a nation. This paper aims to propose the measure for the safe navigation of tugboat according to the frequent marine accident of tugboat with sea bridge. Therefore, we show an example of the sailing schedule and operation checklist based on the analysis of statistics and precedent of marine accident and the investigation of the actual operation state of tugboat in the aspect of a contract of carriage and a personnel setup, which should be checked by the operator of tugboat, to pass through sea bridge safely and propose the safe traffic supporting system based on electronic chart system to improve the safe navigation of tugboat.

  • PDF

A Study on the Suggestion of Traffic Supporting System Enhancing the Safe Passage under Sea Bridge for Tugboat (예부선의 해상교량 안전 통항을 위한 안전운항지원시스템 제안)

  • Lee, Yun-Sok;Yun, Gwi-Ho;Park, Young-Soo;Kim, Jong-Sung;Cho, Ik-Soon
    • Proceedings of KOSOMES biannual meeting
    • /
    • 2007.05a
    • /
    • pp.101-108
    • /
    • 2007
  • Tugboat has carried out the important role and service in the maritime industry construction, such as port and sea bridge construction, fairway dredging and sea reclamation etc. Furthermore, tugboat takes the largest portion in number of vessel at the domestic registry and barges as big as the general merchant vessel, which are getting specialized and larger, are in operation. In spite of the increase of marine accident under this situation, there has been no proper measure for the safe navigation of tugboat in the aspect of a nation. This paper aims to propose the measure for the safe navigation of tugboat according to the frequent marine accident of tugboat with sea bridge. Therefore, we show a example of the sailing schedule and operation checklist based on the analysis of statistics and precedent of marine accident and the investigation of the actual operation state of tugboat in the aspect of a contract of carriage and a personnel setup, which should be checked by the operator of tugboat, pass through sea bridge safely and propose the safe traffic supporting system based on electronic chart system to improve the safe navigation of tugboat.

  • PDF