• Title/Summary/Keyword: Construction Quality

Search Result 4,696, Processing Time 0.034 seconds

Framework of Non-Nuclear Methods Evaluation for Soil QC and QA in Highway Pavement Construction

  • Cho, Yong-K.;Kabassi, Koudous;Wang, Chao
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.2
    • /
    • pp.45-52
    • /
    • 2012
  • This study introduces a methodology to evaluate different types of non-nuclear technologies to see how they are competitive to the nuclear technology for quality control (QC) and quality assurance (QA) in soil condition measurement for highway pavement construction. The non-nuclear methods including the Electrical Density Gauge (EDG) and the Light Weight Deflectometer (LWD) were tested for their performance against a nuclear gauge, and traditional methods were used as baselines. An innovative way of comparing a deflection gauge to a density gauge was introduced. Results showed that the nuclear gauge generally outperformed the non-nuclear gauge in accuracies of soil density and moisture content measurements. Finally, a framework was developed as a guideline for evaluating various types of non-nuclear soil gauges. From other perspectives rather than accuracy, it was concluded that the non-nuclear gauges would be better alternative to the nuclear gauge when the followings are considered: (1) greater life-cycle cost savings; (2) elimination of intense federal regulations and safety/security concerns; and (3) elimination of licensing and intense training.

The Effect of Conflict on Collaboration and Performance in Nuclear Power Plant Construction Projects (원자력 발전소 건설 프로젝트에서 갈등이 협력과 성과에 미치는 영향에 관한 연구)

  • Yu, Yeong Seok;Jo, Dong Hyuk;Choi, Hye Soo
    • Journal of Korean Society for Quality Management
    • /
    • v.47 no.3
    • /
    • pp.553-569
    • /
    • 2019
  • Purpose: The purpose of this study is to identify the impact of conflicts and cooperation on project performance in the nuclear power plant construction project, thus contributing to the successful performance of project participants and the achievement of project objectives. Methods: This study used a method of conducting a survey of participants in the nuclear power plant construction project and verifying the hypothesis statistically. Results: The results of this study are as follows; First, role conflicts and relationship conflicts have negative effects on collaboration. Second, role conflicts have a negative effects on project performance, but conflict in relation has no significant effects on project performance. Third, collaboration has a positive effects on project performance. Finally, the communication quality in the relationship between conflict and collaboration has been shown to have a Moderated effect. Conclusion: In order to achieve the goal in the nuclear power plant construction project, the level of collaboration should be improved based on conflict management among project participants.

Development of Cement Liquid Waterproofing Spouting Equipment (시멘트 액체방수 뿜칠장비의 개발)

  • Kim, Han-Sic;Ha, Jung-Soo;Lee, Young-Do
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.11a
    • /
    • pp.145-146
    • /
    • 2022
  • The demand for a construction method capable of securing a safety environment and improving quality is increasing. There is a high risk of falling when working at a high place in an environment where it is difficult to secure visibility, such as an underground space, and there is a risk of falling if cement liquid waterproof materials are transferred to the top of the scaffold by manpower. In addition, when working on a high place in a poor environment, the quality uniformity of the upper part of the wall is deteriorated. In addition, as waterproof technicians gradually age and decrease, it is difficult to secure them, so it is urgent to prepare countermeasures against the shortage of waterproof technicians. Therefore, the purpose of this study is to develop cement liquid waterproof spouting construction equipment that can secure uniform quality of construction areas to prevent accidents and ensure safety of workers, improve work efficiency and quality due to improvement of work environment. The adhesion performance of the cement liquid waterproof material could be improved by about 20% in accordance with the use of the equipment.

  • PDF

Applying Lean, Green, and Six-Sigma Framework to Improve Exterior Construction Process in Saudi Arabia

  • Banawi, Abdul-Aziz;Bilec, Melissa
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.2
    • /
    • pp.12-22
    • /
    • 2014
  • Over the last decade, Saudi Arabia has experienced significant economic increases as evidenced by the 30% growth in its gross domestic product; furthermore, the construction industry has increased 10% in the same time period. Due to this significant growth, the construction industry is encountering issues related to construction quality resulting in significant waste and associated environmental impacts. In this research, we applied our previously developed framework that integrates three different methods-Lean, Green, and Six-sigma - to a residential construction complex in Saudi Arabia. Our aim of this case study was to explore the application of the framework in practice to glean quantitative results and further validate the framework. In the case study, we used the developed framework to identify a significant issue related to quality and delays - final completion of 53 residential units was delayed because of failed exterior buildings surfaces. We then used the framework to define the causes behind the defects via a field investigation of the 53 units. Of the defect, construction execution was responsible for 43% of the defect, 31% untrained workers, 19% unfavorable construction weather condition, with 7% accounting for other issues. A procedure was developed in concert with the construction manager and overall developer reducing the amount of rework and waste causes revealed by the field examination and the framework. Although two steps were added to the original construction process to overcome waste causes, still save a lot of resources and reduces environmental impact. In summary, we found that the Lean, Green, Six-sigma framework increased productivity, quality, and reduced waste.

A Study on the Revision of the Cost accountingfor Sidewalk Block Pavement Maintenance and Repair Work (보도용 블록포장 유지보수 공사 원가산정기준 개정 연구)

  • Oh, Jae-Hoon;An, Bang-Yul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.271-272
    • /
    • 2021
  • The maintenance and repair work of sidewalk block pavement is a construction that requires a large amount of budget to be invested every year. It is important to establish an appropriate standards for estimating construction cost to ensure proper budgeting and quality. In this study, the standards for estimating the cost of maintenance and construction work for sidewalk blocks that can be applied to the construction volume classified according to the site conditions, construction type, and equipment use differentiated from new construction was established. As a result, the daily construction volume was presented by reflecting excavator and truck as equipment in the combination of paver and common worker. The re-installation was applied by separating the construction volume of sections with general blocks and induction/raised blocks based on the installation of sidewalk blocks after demolition. Generally if block cutting is necessary, the precision construction conditions using a cutting machine were taken into consideration to secure the construction quality. In addition, it has been revised to apply classified construction volume into A and B-Type depending on the park and site conditions.

  • PDF

An Experimental Study on the Quality Estimation of the Mortar using High-Quality Recycled Sand Producted from the Manufacturing System by Wet Gravity Separation (습식비중분리시스템에서 생산된 고품질 순환모래를 사용한 모르타르의 품질평가에 관한 실험적 연구)

  • Lee, Ji-Hwan;Rho, Hyoung-Nam;Lee, Jong-suk;Lee, Sang-Soo;Song, Ha-Young
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.05a
    • /
    • pp.103-107
    • /
    • 2008
  • This study was to execute the experiment for analyzing the quality characteristics of mortar by type of recycled sand by using the recycled sand produced by the manufacturing system by wet gravity separation in order to develop the removal device of impurities for the production of high-quality recycled sand. As a result, this study has sown that the mortar using the high-quality recycled sand through the manufacturing system by wet gravity separation in the fluidity property, strength property, and shrinkage property largely, compared with the mortar using low-quality recycled sand that not passed the device of sand flux. There was a tendency similar to the plane mortar. In conclusion, it was considered as various quality performances of the recycled sand were improved through the production stage of prototype.

  • PDF

Improvement and Systematization of Pre-Study Work for Design Value Engineering in Construction Projects by Quality Function Deployment (품질기능전개(QFD) 기법을 적용한 건설프로젝트 설계VE 준비단계 업무 개선 및 체계화)

  • Yang Jin Kook;Kim Soo-Yong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.4 s.26
    • /
    • pp.122-132
    • /
    • 2005
  • The importance of design value engineering in construction projects recently is rising, which deal about in reduction of cost and improvement of quality. Especially, From half of this year 2005, It is predicted that the value engineering is necessary to be carried out in the projects having project cost more than 10 billion won. In increasing importance of value engineering, we require a way by which we accomplish value engineering systemically and effectively though it is not common in domestic situation. So, this case study shows a way in carrying out value engineering effectively. As the way is to apply QFD(Quality Function Deployment) in pre-study work of design value engineering, this is expected to contribute as function analysis and reflect the requirement of users or owners.

The Priority Analysis of the Risk and Countermeasures for Quality Control in the Steel Structure (강구조물 공사의 품질관리를 위한 리스크 중요도 분석 및 대응방안)

  • Cho, Hang-Min;Song, Young-Woong;Ahn, Jae-Bong;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.3
    • /
    • pp.87-96
    • /
    • 2007
  • Recently construction environment is being professionalized. oversized and diversified. Due to fluctuation of construction environment, the demand for the project of steel structure is ieased gradually and steel construction is needed the efficient quality management. The construction of steel structure which required a variety of sub-contractors, the progress of works and technologies are comprehensive of various risks and uncertain factors. But currently the construction of steel structure is conducted the risk management by perception and experience of constructors. Therefore, the analyzing factors of the risk and establishing the device are able to manage the quality management efficiently. In this study, we have conducted the interview of experts, polls and through the Analysis Hierarchy Process (AHP) for the scientific and systematic risk management. This paper will propose a plan for systematization of the construction of the steel structure.

An In-depth Analysis of Enhancing the Core Blueprint of Architectural Constructs Leveraging Value Engineering(VE) Techniques (VE 기법을 활용한 건축 구조물 코어 형식 개선 방안에 관한 연구)

  • Lee, Jae-Taek;Kim, Gyu-Yong;Lee, Jae-Hyun;Nam, Jeong-Soo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.5
    • /
    • pp.571-581
    • /
    • 2023
  • The contemporary domestic construction landscape has witnessed a contraction, primarily attributed to the operational challenges faced by construction entities and a downtrend in the initiation of new projects. In light of this, domestic construction enterprises are ardently seeking avenues to economize whilst simultaneously amplifying the quality across diverse construction genres. Value engineering (VE), heralded for its prowess in not only cost mitigation but also in accelerating project timelines and bolstering construction quality, has been extensively adopted in refining finishing tasks. However, its application to framework enhancements remains conspicuously limited. Particularly in factory edification, framing emerges as a pivotal process exerting significant influence over the entire construction continuum. Thus, it becomes imperative to integrate VE techniques at the inception phase of framing. This would facilitate a meticulous examination of design schematics and on-site conditions, paving the way for alternative strategies that condense construction durations, economize on costs, and augment work efficiency, all the while upholding paramount standards of quality and safety. Such a venture stands to be foundational in expediting construction timelines, fostering economic efficiency, and buttressing construction safety protocols.

OPTIMIZING QUALITY AND COST OF METAL CURTAIN WALL USING MULTI-OBJECTIVE GENETIC ALGORITHM AND QUALITY FUNCTION DEPLOYMENT

  • Tae-Kyung Lim;Chang-Baek Son;Jae-Jin Son;Dong-Eun Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.409-416
    • /
    • 2009
  • This paper presents a tool called Quality-Cost optimization system (QCOS), which integrates Multi-Objective Genetic Algorithm (MOGA) and Quality Function Deployment (QFD), for tradeoff between quality and cost of the unitized metal curtain-wall unit. A construction owner as the external customer pursues to maximize the quality of the curtain-wall unit. However, the contractor as the internal customer pursues to minimize the cost involved in designing, manufacturing and installing the curtain-wall unit. It is crucial for project manager to find the tradeoff point which satisfies the conflicting interests pursued by the both parties. The system would be beneficial to establish a quality plan satisfying the both parties. Survey questionnaires were administered to the construction owner who has an experience of curtain-wall project, the architects who are the independent assessor, and the contractors who were involved in curtain-wall design and installation. The Customer Requirements (CRs) and their importance weights, the relationship between CRs and Technical Attributes (TAs) consisting of a curtain-wall unit, and the cost ratios of each components consisting curtain-wall unit are obtained from the three groups mentioned previously. The data obtained from the surveys were used as the QFD input to compute the Owner Satisfaction (OS) and Contractor Satisfaction (CS). MOGA is applied to optimize resource allocation under limited budget when multi-objectives, OS and CS, are pursued at the same time. The deterministic multi-objective optimization method using MOGA and QFD is extended to stochastic model to better deal with the uncertainties of QFD input and the variability of QFD output. A case study demonstrates the system and verifies the system conformance.

  • PDF