International journal of advanced smart convergence
/
제10권3호
/
pp.257-278
/
2021
As the definition of the vendor-oriented implementation method, which was utilized in adopting an ERP system, has been centered around the project construction business, it was difficult for the EPR adopting organization to systematically prepare ERP projects and have enough deliberative opportunities to change-related policies. Furthermore, this method does not have a fully standardized construction process. Accordingly, by defining an organization that wants to adopt an ERP system as a customer, this paper develops the customer-based ERP construction process framework that assists both customers and developers who construct the system. For this purpose, this paper reviews the previous research and collects the construction processes of the commercial ERP SW vendor and ERP construction cases while proposing the three-layer process framework to construct ERP through the KJ method. The ERP process framework consists of 7 processes, 32 activities, 141 tasks while providing definitions for concepts of each component. Furthermore, the proposed processes and phases were set in order of the recommended execution, while the activities were suggested as an open-ended type so that the application and usability can be increased and polished by reflecting experts' opinions. The contribution of this study is to standardize the ERP project process by transforming the previous supplier-based ERP construction method into the customer-based one while providing important procedure and activity frameworks that apply to diverse ERP solutions per vendor. At the same time, this study provides an theoretical foundation to develop the construction process for the customer -based Cloud ERP. In practice, At the beginning of the ERP system construction project, it provides communication or process tailoring tools for the stakeholder.
건설공사는 매우 다양한 요인들에 의해 영향을 받으며 생산 주체도 공정별로 다양해서 생산과정상에 많은 변이를 내재하고 있다. 그러나 현재의 공정관리는 결과위주의 관리 방식으로 작업의 상호연관성과 변이 발생을 충분히 고려하지 못하고 있어 많은 문제가 발생하고 있다. 린 건설은 현재의 공정관리방식의 한계를 인식하고 있으며 공정계획의 신뢰성 향상, 공정의 안정성 확보 건축 생산의 효용성 증진을 위한 새로운 관리기술로써 평가 되고 있다. 본 연구에서는 린 건설 이론을 기반으로 한 기법들을 실무적용가능성 측면에서 분석하여 VSM 및 TACT를 이용한 공정관리 기법의 현장적용성을 검토하였다.
The 5th International Conference on Construction Engineering and Project Management
/
pp.66-73
/
2013
Analytical Hierarchy Process (AHP) is a famous method amongst Multi Criteria Decision Making (MCDM), set up by Saaty in 1980. AHP can be determined as a methodology of hierarchical analysis following reasonable decision making with make simpler a difficult crisis. Decision making in systems of Safety management concerned multipart challenges. AHP is process for get better the composite decisions understanding with analyzes of the problem in a structure of hierarchy. The integration all of applicable decision criteria, their pair wise judgment permits the decision maker to establish the trade-offs amongst objectives. In recent years, Malaysian's economy and infrastructure development have significantly and rapidly risen. The construction industry continues to play a major role in this development as many construction activities have been carried out to meet the high demands of the expansive market. However, the construction industry has faced a wide range of challenges, one of which is the frequent occurrences of accidents at the workplace. An effective safety program can substantially reduce accidents because it can help management to build up safer means of operations and create safe working environments for the workers. Furthermore, by having an effective safety programs, good safety culture can be embedded in organization because it can encourage mutual cooperation between management and workers in the operations of the programs and decisions that affect their safety and health. The focus of this research is development methodology of Analytics Hierarchy Process (AHP) in construction safety factors and investigates the levels of some effective elements in SMS in Malaysian construction industries.
도로공사는 선형적이고 반복적인 공사로 공사의 특성상 건설장비에 대한 의존도가 높기 때문에, 건설장비의 효율적 운용에 의한 생산성 향상 및 공사비 절감 효과가 크다. 또한, 도로공사는 시공순서, 현장상황, 적용 공법에 따라 다양한 건설 장비의 선택이 가능하기 때문에 공정계획 시, 공종 간 연계에 따른 세부 작업 및 공법을 고려하여야 한다. 시공자는 현장조건에 맞는 작업을 선택하고 투입될 장비의 종류 및 성능, 수량 등을 사전에 파악하여, 적절한 건설장비 운용계획의 수립을 통한 경제성 향상 방안을 마련해야 한다. 하지만 한정된 유사 공사의 실적정보 및 체계적인 공사계획 방법의 부재로, 적정한 공정계획 수립이 용이하지 않으며, 공법 및 건설장비의 선정에 있어 대부분 경험과 직관에 의존한 공사를 수행하고 있다. 그 결과 시공 이전 공정계획단계에서 수립된 계획은 실행단계에서의 충분한 타당성을 확보하지 못하여 그 활용도가 제한적이다. 본 연구는 일반적인 도로공사의 초기 공정계획 수립단계에서 적용가능한 주요 공종별 공정로직을 개발하고, 공종 별 세부 시공절차 분석을 통하여 현장상황 및 공종에 적용 가능한 건설장비 운용 방안을 제시하였다. 또한 공정로직에 따른 다양한 건설장비 대안들을 대상으로 프로세스 시뮬레이션을 활용하여 경제성 기반의 최적화 장비조합 방안을 개발하였다. 개발된 방법을 이용하여, 계획단계에서의 수립된 다양한 공정계획에 대해 효율성을 평가하고 최적의 자원 선정을 위한 의사결정에 도움을 줄 것으로 판단된다.
Sang-Hoon Lee;Carolina Fuzetti;Lingguang Song;Kyungrai Kim
국제학술발표논문집
/
The 3th International Conference on Construction Engineering and Project Management
/
pp.616-621
/
2009
Change orders represent one of the largest sources of cost growth on construction projects, but an efficient change management control system can help the projects steer clear of the constant construction changes. This study was performed to achieve a better understanding of all changes and to develop a new set of Best Practices using process mapping techniques. The project data for this research were collected from case studies of aviation projects implemented in Houston, Texas at Bush Intercontinental Airport. The findings and contributions of this research should help owners and project managers determine and identify major causes that impact project budget and schedule and implement solutions prior to them surfacing.
The 3th International Conference on Construction Engineering and Project Management
/
pp.153-160
/
2009
The demand for super tall building construction is increasing worldwide. There has been a constant request for achieving early payback on investment by shortening the construction time. This pertains especially for the case of huge investment projects such as super tall building construction. It is very important to shorten the construction time for the building framework, which requires substantial construction time and cost, and this is directly related to the establishment of an optimum lift plan for construction. When there is a problem in the selection of the lift equipment, it is almost impossible to revise the selection, resulting in a possible failure of the project. Thus, the purpose of this study is to analyze the function and logic for the development of the process for the selection of lift equipment for super tall building projects and further development of making the analyzed process into a system. In line with this research objective, the process of selecting the optimum lift equipment by domestic construction company was investigated and analyzed as well as collecting the actual field data. The actual data were obtained by sensors installed on tower cranes at three construction sites with the help from the construction company.
The top-down construction method is an excavation and substructure construction method by excavating earth and building slabs from the ground level to the bottom of a building. The top-down method can be categorized into several types by its process and other technical details. Some of commonly used top-down methods in Korea today are S.O.G., N.S.T.D., and S.P.S. Among these, one method is chosen depending on construction field conditions, cost, construction time and so on. This study explores several factors that may affect the selection of a top-down method. This paper reports preliminary survey results with 54 top-down construction experts and comparison results of 5 top-down construction sites.
In order to reduce the construction cost and period without degrading the quality, construction companies are making a lot of efforts to prefabricate and mechanize the construction process, and introducing and utilizing various techniques of construction time management in the process of construction. However, due to the various factors (such as weather conditions, labor factors, supply of equipment and materials, safety accident, etc) in the process of construction, construction projects are not frequently completed within the scheduled Period. This research is to examine the current status of construction time management and factors causing delay in construction with regard to the concrete work (such as form work, steel reinforcement, and concrete work) in building apartments.
The current architectural design of unit modular has been based on 2D of CAD program, so unit modular character which needs unit information management, as a dried-member system, has no effect on design process. The purpose of this study is We have developed a suitable BIM design process, according to various works of construction, then tried to contribute to supply and activation of the urban-life-housing based on unit modular. The BIM modeling process based on unit modular has been in order of unit combination with preparing manual classification, and, it has been constructed, at construction site, from housing foundation to roof finish by Bottom-up method. At a manufacturing factory, it has been produced in order of 1) grouping materials and parts, 2) fabricating unit boxes, and 3) interference examination of unit boxes, and each order has been classified as housing structure, architecture, plumbing process separately. At a construction site, the fabrication has been done in order of, like as a real housing construction scenario, 1) RC foundation work 2) unit module job-site-fabrication work, 3) roof truss work, 4) plumbing and HVAC work, and 5) housing interior finish work. After modeling process, the interference examination on each work of construction has finally completed modeling. The Unit modular utilizing BIM modeling can make easy housing maintenance through systematic control with preparing manual of unit module information, and securing accurate and speedy construction information. And it will promote design credibility and create maximum effect of unit modular construction method, such as construction period reduction and upgrade of construction quality, etc., through the computer simulation as real as construction environment in cyber space, and with the interfering examination.
Recently, construction industry has been magnified while various cooperative relationship makes steady process. So importance of management during construction is gathering strength. Therefore, we need systematic management gradually. But almost management of construction industry that performs these day is focused on construction phase not design phase. The purpose of the present study is to find the effective way of design management with enhancing the process of design phase.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.