A Development of the Customer based On-premise ERP Implementation Process Framework

  • Oh, Deok-Soo;Kim, Hyeong-Soo;Kim, Seung-Hee
    • International journal of advanced smart convergence
    • /
    • 제10권3호
    • /
    • pp.257-278
    • /
    • 2021
  • As the definition of the vendor-oriented implementation method, which was utilized in adopting an ERP system, has been centered around the project construction business, it was difficult for the EPR adopting organization to systematically prepare ERP projects and have enough deliberative opportunities to change-related policies. Furthermore, this method does not have a fully standardized construction process. Accordingly, by defining an organization that wants to adopt an ERP system as a customer, this paper develops the customer-based ERP construction process framework that assists both customers and developers who construct the system. For this purpose, this paper reviews the previous research and collects the construction processes of the commercial ERP SW vendor and ERP construction cases while proposing the three-layer process framework to construct ERP through the KJ method. The ERP process framework consists of 7 processes, 32 activities, 141 tasks while providing definitions for concepts of each component. Furthermore, the proposed processes and phases were set in order of the recommended execution, while the activities were suggested as an open-ended type so that the application and usability can be increased and polished by reflecting experts' opinions. The contribution of this study is to standardize the ERP project process by transforming the previous supplier-based ERP construction method into the customer-based one while providing important procedure and activity frameworks that apply to diverse ERP solutions per vendor. At the same time, this study provides an theoretical foundation to develop the construction process for the customer -based Cloud ERP. In practice, At the beginning of the ERP system construction project, it provides communication or process tailoring tools for the stakeholder.

린 건설 공정관리이론의 현장적용에 관한 연구 (A Study on Application of Lean Construction Theory in Schedule Management)

  • 정주영;권원;박상준;전재열
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.515-518
    • /
    • 2006
  • 건설공사는 매우 다양한 요인들에 의해 영향을 받으며 생산 주체도 공정별로 다양해서 생산과정상에 많은 변이를 내재하고 있다. 그러나 현재의 공정관리는 결과위주의 관리 방식으로 작업의 상호연관성과 변이 발생을 충분히 고려하지 못하고 있어 많은 문제가 발생하고 있다. 린 건설은 현재의 공정관리방식의 한계를 인식하고 있으며 공정계획의 신뢰성 향상, 공정의 안정성 확보 건축 생산의 효용성 증진을 위한 새로운 관리기술로써 평가 되고 있다. 본 연구에서는 린 건설 이론을 기반으로 한 기법들을 실무적용가능성 측면에서 분석하여 VSM 및 TACT를 이용한 공정관리 기법의 현장적용성을 검토하였다.

  • PDF

An Application of the Analytical Hierarchy Process (AHP) for Safety measurement in Malaysian Construction Industry

  • Samad Doostdar;Zubaidah Ismail
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.66-73
    • /
    • 2013
  • Analytical Hierarchy Process (AHP) is a famous method amongst Multi Criteria Decision Making (MCDM), set up by Saaty in 1980. AHP can be determined as a methodology of hierarchical analysis following reasonable decision making with make simpler a difficult crisis. Decision making in systems of Safety management concerned multipart challenges. AHP is process for get better the composite decisions understanding with analyzes of the problem in a structure of hierarchy. The integration all of applicable decision criteria, their pair wise judgment permits the decision maker to establish the trade-offs amongst objectives. In recent years, Malaysian's economy and infrastructure development have significantly and rapidly risen. The construction industry continues to play a major role in this development as many construction activities have been carried out to meet the high demands of the expansive market. However, the construction industry has faced a wide range of challenges, one of which is the frequent occurrences of accidents at the workplace. An effective safety program can substantially reduce accidents because it can help management to build up safer means of operations and create safe working environments for the workers. Furthermore, by having an effective safety programs, good safety culture can be embedded in organization because it can encourage mutual cooperation between management and workers in the operations of the programs and decisions that affect their safety and health. The focus of this research is development methodology of Analytics Hierarchy Process (AHP) in construction safety factors and investigates the levels of some effective elements in SMS in Malaysian construction industries.

  • PDF

도로공사 공정계획을 위한 공정 로직 및 건설장비 효율화 방안 (A methodology for an effective utilization of construction equipment for highway construction projects)

  • 송호정;최재현
    • 한국건설관리학회논문집
    • /
    • 제15권6호
    • /
    • pp.26-34
    • /
    • 2014
  • 도로공사는 선형적이고 반복적인 공사로 공사의 특성상 건설장비에 대한 의존도가 높기 때문에, 건설장비의 효율적 운용에 의한 생산성 향상 및 공사비 절감 효과가 크다. 또한, 도로공사는 시공순서, 현장상황, 적용 공법에 따라 다양한 건설 장비의 선택이 가능하기 때문에 공정계획 시, 공종 간 연계에 따른 세부 작업 및 공법을 고려하여야 한다. 시공자는 현장조건에 맞는 작업을 선택하고 투입될 장비의 종류 및 성능, 수량 등을 사전에 파악하여, 적절한 건설장비 운용계획의 수립을 통한 경제성 향상 방안을 마련해야 한다. 하지만 한정된 유사 공사의 실적정보 및 체계적인 공사계획 방법의 부재로, 적정한 공정계획 수립이 용이하지 않으며, 공법 및 건설장비의 선정에 있어 대부분 경험과 직관에 의존한 공사를 수행하고 있다. 그 결과 시공 이전 공정계획단계에서 수립된 계획은 실행단계에서의 충분한 타당성을 확보하지 못하여 그 활용도가 제한적이다. 본 연구는 일반적인 도로공사의 초기 공정계획 수립단계에서 적용가능한 주요 공종별 공정로직을 개발하고, 공종 별 세부 시공절차 분석을 통하여 현장상황 및 공종에 적용 가능한 건설장비 운용 방안을 제시하였다. 또한 공정로직에 따른 다양한 건설장비 대안들을 대상으로 프로세스 시뮬레이션을 활용하여 경제성 기반의 최적화 장비조합 방안을 개발하였다. 개발된 방법을 이용하여, 계획단계에서의 수립된 다양한 공정계획에 대해 효율성을 평가하고 최적의 자원 선정을 위한 의사결정에 도움을 줄 것으로 판단된다.

USING PROCESS MAPPING IN CONSTRUCTION PROCESS TO REDUCE CHANGE ORDERS

  • Sang-Hoon Lee;Carolina Fuzetti;Lingguang Song;Kyungrai Kim
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.616-621
    • /
    • 2009
  • Change orders represent one of the largest sources of cost growth on construction projects, but an efficient change management control system can help the projects steer clear of the constant construction changes. This study was performed to achieve a better understanding of all changes and to develop a new set of Best Practices using process mapping techniques. The project data for this research were collected from case studies of aviation projects implemented in Houston, Texas at Bush Intercontinental Airport. The findings and contributions of this research should help owners and project managers determine and identify major causes that impact project budget and schedule and implement solutions prior to them surfacing.

  • PDF

LIFT CYCLE PREDICTION METHOD FOR THE SELECTION OF LIFT EQUIPMENT IN SUPER TALL BUILDING CONSTRUCTION

  • Seo-kyung Won;Choong-hee Han;Junbok Lee
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.153-160
    • /
    • 2009
  • The demand for super tall building construction is increasing worldwide. There has been a constant request for achieving early payback on investment by shortening the construction time. This pertains especially for the case of huge investment projects such as super tall building construction. It is very important to shorten the construction time for the building framework, which requires substantial construction time and cost, and this is directly related to the establishment of an optimum lift plan for construction. When there is a problem in the selection of the lift equipment, it is almost impossible to revise the selection, resulting in a possible failure of the project. Thus, the purpose of this study is to analyze the function and logic for the development of the process for the selection of lift equipment for super tall building projects and further development of making the analyzed process into a system. In line with this research objective, the process of selecting the optimum lift equipment by domestic construction company was investigated and analyzed as well as collecting the actual field data. The actual data were obtained by sensors installed on tower cranes at three construction sites with the help from the construction company.

  • PDF

Top-Down 공사의 공정관리 방법 연구 (A Study on the Construction Process Management of the Top-Down Construction Method)

  • 강현정;임홍철;이강;윤대중;김상일
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2006년도 춘계학술논문 발표대회 제6권1호
    • /
    • pp.133-136
    • /
    • 2006
  • The top-down construction method is an excavation and substructure construction method by excavating earth and building slabs from the ground level to the bottom of a building. The top-down method can be categorized into several types by its process and other technical details. Some of commonly used top-down methods in Korea today are S.O.G., N.S.T.D., and S.P.S. Among these, one method is chosen depending on construction field conditions, cost, construction time and so on. This study explores several factors that may affect the selection of a top-down method. This paper reports preliminary survey results with 54 top-down construction experts and comparison results of 5 top-down construction sites.

  • PDF

아파트 구체공사의 공정관리 및 공기지연요소 분석에 관한 연구 (Analysis of Progress Schedule and Delay Element of Frame Works in Apartments)

  • 최은준;최민권;조형근
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2003년도 학술.기술논문발표회
    • /
    • pp.157-160
    • /
    • 2003
  • In order to reduce the construction cost and period without degrading the quality, construction companies are making a lot of efforts to prefabricate and mechanize the construction process, and introducing and utilizing various techniques of construction time management in the process of construction. However, due to the various factors (such as weather conditions, labor factors, supply of equipment and materials, safety accident, etc) in the process of construction, construction projects are not frequently completed within the scheduled Period. This research is to examine the current status of construction time management and factors causing delay in construction with regard to the concrete work (such as form work, steel reinforcement, and concrete work) in building apartments.

  • PDF

유닛모듈러 기반 도시형 생활주택의 BIM 모델링 프로세스 개발 연구 (The Study on the Developing Process of BIM Modeling for Urban-life-housing Based on Unit Modular)

  • 이창재;임석호
    • KIEAE Journal
    • /
    • 제12권6호
    • /
    • pp.77-84
    • /
    • 2012
  • The current architectural design of unit modular has been based on 2D of CAD program, so unit modular character which needs unit information management, as a dried-member system, has no effect on design process. The purpose of this study is We have developed a suitable BIM design process, according to various works of construction, then tried to contribute to supply and activation of the urban-life-housing based on unit modular. The BIM modeling process based on unit modular has been in order of unit combination with preparing manual classification, and, it has been constructed, at construction site, from housing foundation to roof finish by Bottom-up method. At a manufacturing factory, it has been produced in order of 1) grouping materials and parts, 2) fabricating unit boxes, and 3) interference examination of unit boxes, and each order has been classified as housing structure, architecture, plumbing process separately. At a construction site, the fabrication has been done in order of, like as a real housing construction scenario, 1) RC foundation work 2) unit module job-site-fabrication work, 3) roof truss work, 4) plumbing and HVAC work, and 5) housing interior finish work. After modeling process, the interference examination on each work of construction has finally completed modeling. The Unit modular utilizing BIM modeling can make easy housing maintenance through systematic control with preparing manual of unit module information, and securing accurate and speedy construction information. And it will promote design credibility and create maximum effect of unit modular construction method, such as construction period reduction and upgrade of construction quality, etc., through the computer simulation as real as construction environment in cyber space, and with the interfering examination.

설계업무 프로세스 개선을 통한 설계관리의 발전 방향 (Design management's development direction through design process improvement)

  • 김한;김선규;이낙운
    • 산업기술연구
    • /
    • 제27권B호
    • /
    • pp.169-176
    • /
    • 2007
  • Recently, construction industry has been magnified while various cooperative relationship makes steady process. So importance of management during construction is gathering strength. Therefore, we need systematic management gradually. But almost management of construction industry that performs these day is focused on construction phase not design phase. The purpose of the present study is to find the effective way of design management with enhancing the process of design phase.

  • PDF