• Title/Summary/Keyword: Construction Process

Search Result 7,147, Processing Time 0.034 seconds

The Actual State of Demolition and Pilot Dismantling in Apartment Building (해체공사의 수행실태 및 공동주택 분별해체 시험시공)

  • Kim, Hyo-Jin;Sohn, Jeong-Rak;Park, Seong-Sik;Yoon, Yung-Sang
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2007.04a
    • /
    • pp.113-118
    • /
    • 2007
  • Now a performance process of Demolition works is 'Before-Removal & After-Classification' method in Korea. This method is short of demolition time, but construction wastes contained substances lower recycling rate of construction, raise expenses of reclamation & treatment. Then the government has decided upon a positive 'Before-Classification & After-Removal' method, and substantially raise a recycling rate of construction wastes. Therefore, this study makes an investigation into state of internal and external demolition field through evaluating technological level, we make a proposal of dismantling method from there. Also, we put dismantling to the test in an apartment by proposed work process. As the result, it made a term of works increased for removing interior material. To solve this problem, we need to develop tools and methods of construction that can remove efficiently. From now on, we continuously need to study a breakdown system of dismantling, analysis of dismantling process and general system by inspecting entire demolition process. And we have to study details for making a specific thesis of method of removing interior material which was based on developing a suitable partial demolition machine and dismantling works.

  • PDF

A Study on the Production of Wood Members and the Estimation of Raw Woods at the Government Managed Building Construction in the Late Chosun Dynasty (조선후기(朝鮮後期) 관영건축공사(官營建築工事)의 목부재(木部材) 생산(生産)과 물양산정(物量算定)에 관한 연구)

  • Lee, Kweon-Yeong
    • Journal of architectural history
    • /
    • v.10 no.1 s.25
    • /
    • pp.25-40
    • /
    • 2001
  • Since the 17th century, the society of Chosun Dynasty belonged to a period of rapid transition in many fields. As the building is a result produced on the basis of a society and economy, the general transition in a society is to be reflected into a process of building construction. Therefore an understanding or estimate of a building can be guaranteed by research of a process of building construction. Economic base factors in its process consist of material, cost, manpower, and operation system, etc. to be committed to the construction. On the premise, this paper is to examine the production of wood members and the calculation of the amount of raw woods in a process of woodwork in the construction of the government managed buildings in the late of Chosun dynasty. Construction reports, job slips, written estimates, and other documents in those days are examined for the study. To classify raw woods according to a standard size was aimed to a material management appropriately to apply each them to building size or its member size. The way to select a list of raw woods applicable to each member size, and to calculate the amount of the demanded wood was much more improved with 'Injungjeon-yeongkweon' in the year 1805 at the turning point than 'Hwaseong-seongyuk' in the year 1796. The improvement of material management brought to overcome a shortage of the amount supplied from forest preserve, and to a rationalization of building construction.

  • PDF

Noise Management Process for Big Scale Concrete Pouring in Urban Area (도심지 대규모 콘크리트 타설시 소음관리 사례)

  • An, Jang-Ho;Lee, Joo-Ho;Lee, Jun-Seo;Kim, Il-Min
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2012.04a
    • /
    • pp.787-790
    • /
    • 2012
  • In downtown, construction noise related claims are the most important issues. Sometimes noise related claims halt the construction process. Therefore, Introduction of noise reduction measures is common to construction process with a loud noise. This case is about concrete pouring for mat foundation of super tall building. Concrete pouring process using High Pressure Pumping machine causes high noise level in the vicinity of area. And large number of transit-mixer truck cause traffic congestion. This paper introduces effort and process to prevention of construction noise claims on massive scale concrete pouring.

  • PDF

A Study on Application of CPLM using Process Model of the Pre-design stage (건축 기획단계 프로세스 모델의 CPLM 적용에 관한 연구)

  • Park, Do-Young;Jun, Yeong-Jin;Moon, Sung-Kon;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.205-208
    • /
    • 2009
  • The purpose of this study is to apply the process model of the pre-design stage to CPLM(Construction Project Life-cycle Management). Life-cycle consists of 4 stage; Pre-design, Design, Construction, Maintenance. Each stage has organic relations between front and rear stage. Therefore it is important to manage and use the information data of each stage. But these data are not carried to the next stage smoothly, especially at the pre-design stage. It is even vague to define the process of the pre-design stage. To carry and share the information well, this study defines Pre-design stage process and CPLM at first, VA-Cityplanner which is the development system of the pre-design process model is applied to CPLM for the smooth current of the data between participants.

  • PDF

Environmental Friendly Construction Process of Composite Beam and its Application (친환경 층고 절감형 합성보의 시공 Process 및 시공사례)

  • Hong, Won-Kee;Park, Seon-Chee;Lee, Kyoung-Hun;Kim, Jeom-Han;Lee, Ho-Chan;Hwang, Yun-Ha
    • KIEAE Journal
    • /
    • v.7 no.6
    • /
    • pp.107-112
    • /
    • 2007
  • Recently hybrid beam system is widely used because it has many structural advantages such as short construction period and low story height etc. Generally steel wide flange beam exposure type and embedded type hybrid beams are constructed. Even though exposure hybrid beam is easily constructed, the fire proofing protection process is necessary because steel wide flange beam cannot resist to fire itself. Story height reduction type hybrid beam, which is introduced hybrid beam in this paper, does not need fire proofing protection process because it is constructed as a fully embedded type hybrid beam. Developed construction process and actual construction cases of story height reduction type hybrid beam were introduced in this study.

Development of a Pretreatment Process for Coal Gasification Slag to Convert High-quality Aggregates. (고품질 골재 전환을 위한 석탄 가스화 용융슬래그의 전처리 공정 개발)

  • Hu, Yun-Yao;Han, Soo-Hwan;Lim, Gun-Su;Han, Jun-Hui;Kim, Jong;Han, Min-Cheol
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.122-123
    • /
    • 2021
  • This study examines the performance of pretreatment process system as the initial construction stage of the pretreatment process system to use CGS, a by-product generated in IGCC, as a concrete fine aggregate of construction materials. The process undergoes a grinding process capable of grinding to a predetermined particle size during primary grinding and a sorting plant through sieve grading of 2.5 mm or less for particle size correction. Afterwards, it is hoped that the use of coal gasification slag of Korean IGCC as a fine aggregate for concrete will be distributed and expanded by producing quality-improved CGS fine aggregate using water as a medium for removing impurities and particulates.

  • PDF

A Study on the development of Construction Field Management Model based on BIM (BIM기반 건설현장 관리모델 개발에 관한 연구)

  • Jun, Young-Woong;Lee, Myoung-Sik
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.9 no.3
    • /
    • pp.69-76
    • /
    • 2009
  • The importance of efficient construction site management has been growing as the amount of construction information increases which is used in the growing construction site. Accordingly in this study, we are trying to find out the application situation and possibility of BIM through theoretical examination and domestic & overseas case study of BIM and we are trying to suggest the way of efficient construction site management formulation through implementation phase-oriented and cooperation entity-oriented analysis in the construction site. We found out that it was possible to minimize time loss and financial loss by visualizing 2D drawings through 3D modeling of target building by applying BIM and that it was possible to improve accuracy of budget planning with quantitative information of 3D model, to plan construction process with more confidence due to accurate architectural information of drawings and quantitative information, and to manage cost and quality through process management based on construction information acquired by BIM including object information by part. It is concluded that we can improve efficiency of construction management between field and each cooperating entity by integrating and linking BIM information through this process.

  • PDF

Practical Issues in Application of RFID to Pipeline Construction and its Benefit Analysis

  • Yun, Ki Cheol;Oh, Chi Don;Cho, Nam Ho;Kim, Kyong Ju;Park, Chan Sik
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.2
    • /
    • pp.1-7
    • /
    • 2014
  • Radio Frequency Identification (RFID) has been applied to the construction industry for improving the efficiency of material and process management. Most RFID-related studies have focused on building or plant construction. The application of RFID has been limited in pipeline construction projects where materials are stored and stacked across a large construction site. This paper investigates practical issues in pipeline construction, improves the read rates of RFID tags, and tests their utility by putting them into practice. This paper demonstrates the benefits that may be expected with the use of improved RFID tags and the development of an automated pipeline construction management system. As a result, pipeline construction management time decreased by 28 hours per month compared to the conventional method. Cost decreased by about 26%.

A Study on Obstacle Reasons of BIM in Construction Phase (시공단계에서의 BIM 도입 저해요인에 관한 기초연구)

  • Kim, Ji-Sun;Yoo, Seung-Kyu;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.61-62
    • /
    • 2011
  • Construction plans for large construction projects are problems such as Incompatibility of information, omissions due to technical limitations of 2D CAD. In addition to, Plan established for the validation such as process, cost and construction technology plan is difficult. By occurring Frequent changes in the course of business, Inefficiency of management has occurred. In the construction process, there is occurred costs and construction delays due to reconstruction or communication error. In this study, It was deemed BIM will complement Existing 2D CAD problem. And, BIM case studies in the construction phase of domestic construction were analyzed, How to apply BIM in the construction phase investigated.

  • PDF

A Development direction of the building structural system based on the 3D virtual construction (3차원 가상건설기반 건축구조시스템의 개발방향)

  • Shin, Tae-Song;Cho, Young-Sang;Cheon, Jin-Ho
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2007.04a
    • /
    • pp.346-351
    • /
    • 2007
  • As the construction technology is rapidly advancing internationally, the necessity of virtual construction technology development is drastically demanded in the construction industry together with a fusion technology with information technology(IT). The construction technology will be changed as the paradigm of construction technology in the future. The establishment of building structural system in the virtual construction basis is necessary for the integration of construction process, and it will be expected to produce the effect of reduction of construction period and quality improvement through the environment of integration. This study is to present the analysis of the existing process of structural design, the content of research & development as per the building structural system on virtual construction basis and the direction of research.

  • PDF