• Title/Summary/Keyword: Construction Material Management

Search Result 644, Processing Time 0.024 seconds

CONSTRUCTION MATERIAL MANAGEMENT USING SMART MOBILE COMPUTING

  • Kwang-Pyo Lee;Hyun-Soo Lee;Moonseo Park
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.221-228
    • /
    • 2011
  • As construction works have become larger and more complex, improving productivity by introducing Information Technology (IT) is pursued and more effective construction management is needed in construction industry. In this circumstance, many different kinds of project management system is being introduced, and various IT technologies are applied such as Personal Digital Assistant (PDA), Bar Code, Radio Frequency Identification (RFID), Web Camera, and so on. However, these kinds of technologies might cause re-processing of information and ineffectiveness of project because of lack of real time information processing technology or separation between construction sites and management offices. Meanwhile, these technologies rather decrease the construction productivity except for the data saving and database function. Therefore, this research aims to develop Application that can be applied efficiently for construction material management, by understanding problems of former management system with questionnaires and extracting functions with analysis of requirements. In virtue of the construction material management Application which will be developed in this study, it will be possible to input information automatically, to process and check material information in real time, and to identify the location of necessary material. Then, the problem of separation between construction sites and management offices are solved, and as a result, more efficient management of materials in construction sites will become possible. At the same time, this study will investigate the possibility and applicability of new IT device, Smart Phone to construction sites.

  • PDF

Material Management Using Radio-Frequency Identification (RFID) in the Construction Industry

  • Kim Changwan;Huh Youngki;Kwon Soonwook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.1 s.17
    • /
    • pp.107-113
    • /
    • 2004
  • The advent of Radio Frequency Identification (RFID) technology has created new opportunities for improving the material management function in the construction industry and is starting to provide major improvements in the efficiency of the material management process. The objective of the research reported herein was to introduce the benefits of RFID technology on material management in the construction industry. RFID technology is discussed and various aspects of this technology are investigated. Potential RFID applications on material management proposed by Construction Industry Institute (CII) Breakthrough Strategy Committee (BTSC) and Fully Integrated and Automated Technology (FIATECH) are spelled out Finally, business analysis of RFID to estimate its impact is provided. It is concluded that there is a significant potential for improvement of material management function in the construction industry through the use of RFID.

Materials management using RFID in the apartment construction (RFID를 활용한 공동주택 건설공사 자재관리 방안 연구)

  • Park, So-Hyun;Song, Jeong-Hwa;Oh, Kun-Soo
    • Proceeding of Spring/Autumn Annual Conference of KHA
    • /
    • 2008.04a
    • /
    • pp.251-255
    • /
    • 2008
  • Nowadays the scale of domestic construction becomes large, sophisticated and specialized. It has led to a growing need for the high quality, cost reduction, safety and reduction of work duration. Therefore the importance of construction materials management is emphasized to perform the project successfully. It becomes an current issue about method of construction material management according to the flow of construction progress in the construction field. Therefore, various researches using RFID for efficiency of construction material are being studied. We analyzed the case study using RFID, drew the problems through the investigation of status about the management of material in the field, and then suggested the method of material management using in the apartment building construction field.

  • PDF

Economic Order Quantity(EOQ) Determination Process for Construction Material considering Demand Variation and Stockyard Availability (일일 수요량 변동성과 가용야적면적을 고려한 건설 자재의 경제적주문량(EOQ) 산정 프로세스)

  • Yun, Jung-Sook;Yu, Jung-Ho;Kim, Chang-Duck
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.1
    • /
    • pp.33-42
    • /
    • 2011
  • Part of material and inventory management is one of important factor for business interests. But importance of material and inventory management in domestic construction project has been relatively devalued. The existing study of inventory has been studied with limited individual factor about inventory management. Therefore construction material management needs improvement via an accurate prediction with whole and systematic process viewpoint. and existing theory of material and inventory introduction to construction from manufacturing needs reflecting characteristics about construction project. This paper suggests material management process for economic material management. This paper to make a unit curtain wall of case construction project comparison between total cost of existing material management process and total cost of economic order quantity of proposal material management process To verify usefulness of order point and order quantity determination process.

Development of Data Warehouse for Construction Material Management (건설공사 자재 관리를 위한 데이터 웨어하우스 개발)

  • Ryu, Han-Guk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.3
    • /
    • pp.319-325
    • /
    • 2011
  • During a construction project, construction managers must be provided with material information to help them to make decisions more efficiently without delaying the delivery of material. Construction work can be smoothly performed with the proper material supply. Construction duration depends on several material-related decisions, including the order, delivery, and allocation of material to the correct work location. Hence, it is worthwhile to introduce data warehouse techniques that generate subject-oriented and integrated data to construction material management. The data warehouse for construction material management can perform multidimensional analysis and then define KPIs (Key Performance Index) in order to provide construction managers with construction material information such as lead time, material delivery rate, material installation rate and so on. This research proposes a method of effectively facilitating large amounts of data in the operating systems during the construction management process. In other words, the proposed method can supply structured and multi-perspective material-related information using data warehouse techniques.

Optimization for RFID Based on Construction Material Management System Using Genetic Algorithm (Genetic Algorithm을 이용한 RFID 건설 자재 관리 시스템 최적화)

  • Kim, Chang-Yoon;Kim, Hyoung-Kwn;Han, Seung-Heon;Park, Sang-Hyuk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.511-514
    • /
    • 2006
  • Material Management is one of the most important task in construction projects. More than 50% of the cost in a construction project is related to material management process. Material management method using RFID(Radio Frequency Identification) is now trying to the construction field. However, there are no enough researches on effective material management in terms of how and where RFID transponder should be installed and there are no other research that which optimization method can be used for effective installation. Therefore, this paper suggest that where and how RFID transponder can be installed on the appropriate position in construction fields using Genetic Algorithm optimization method.

  • PDF

A Study on Concrete Material Quality Management Based on Various Test of Construction Condition under Hot Weather Circumstance (서중(暑中) 환경에서 현장 콘크리트 시험을 통한 재료 품질관리 방안)

  • Park, Shin
    • Journal of the Korea Institute of Building Construction
    • /
    • v.5 no.3 s.17
    • /
    • pp.91-99
    • /
    • 2005
  • It is required to study systematical on the concrete quality management to extend structure life because rebuilding effect is reducing under present condition of large sized and high stories structure. Concrete, which shows its intensity by hydrating action and a big change in quality according to hot weather and temperature, produces a lot of qualify problem under hot and cold weather Because of each specification and construction plan which does not have basic standard on site, concrete's quality is irregular and makes some defect. As a result, Daegu is turned out to be the longest area after investigating application period and days focused on 8 cities weather information about relationship between hot weather circumstance and construction environment. Therefore, we first surveyed the concrete material in the region and found out the problem of quality nanagement. Then figure out the way of solution. Moreover, we integrated concrete material quality management, which is applied differently to each site, to have equal quality and to reduce defect from construction site. And then, based on various test of construction condition and analysis of quality management item, we suggest effective concrete quality management to make concrete material construction standard guide and plan under hot weather.

A Research on how to turn informationization Database of construction materials to practical use (건설 자재정보 DataBase의 실용화 방안 연구)

  • Kwon, Oh-Yong;Han, Chung-Han;Lee, Hwa-Young
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.747-750
    • /
    • 2007
  • Information of construction material is served through internet to user but it is poor to use information of construction material because of lack of information which is accumulated and insufficience of standardization. So informationization of civil materials are closely connected with works and then it is promoted to be used through works like design, construction etc. Informationization for management of information of construction material which reflects questionnaires about opinion of workers presents promotion by stage considering first, continuous renewal of information of construction material and increase in quantity, second classification system and standardization of terms in order to share and connect information of construction material third, developing inquiry method of material information needed in construction stage fourth, connecting material information DB and application through design and construction.

  • PDF

Selection of management factors for material distribution management according to materail management indexes (자재물류관리를 위한 자재 속성별 자재관리 지표)

  • Ha, Young-Seo;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.553-557
    • /
    • 2007
  • In general, material cost of a construction project is more than 30$^{\sim}$40% of total construction cost, thus on site material control is very important. The factthat buildings have recently become higher and bigger also increases the importance of on site material control. However, on site material control has not been considered as an important management issue. This study classifies building construction materials considering the material delivery characteristics such as ETO, ATO, MTO and MTS and the unique characteristics of each materials. Using the classification, this study examine the requirements for on site material control of each materials. Finally, this study suggests on site material control systems for each construction material.

  • PDF

DEVELOPMENT OF MATERIAL TRACKING SYSTEM USING WIRELESS TECHNOLOGY IN HIGH-RISE BUILDING

  • Jae-Goo Han;Min-Woo Lee;Soon-Wook Kwon;Moon-Young Cho
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1017-1021
    • /
    • 2005
  • There is a need for effective tracking and control of material loading and delivery time especially during the finishing-work phases to eliminate the need for lay-down space on the site. Hence, it is essential to monitor the relevant information regarding material procurement in construction sites, and it is also the key factor for successful site control and the adoption of the Just-in-Time concept for high-rise building construction. The purpose of this study is to test RFID's readability in order to develop a finishing material monitoring system through the application of RFID technology.

  • PDF