• 제목/요약/키워드: Construction Labor

검색결과 728건 처리시간 0.027초

초고층 골조공사의 바닥 거푸집별 생산성 분석;기준층 3일 공정을 중심으로 (The Productivity Analysis by Slab Formwork of Structural Frame Work in Tall Building Construction)

  • 김태훈;신윤석;조성수;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2007년도 추계 학술논문 발표대회
    • /
    • pp.115-118
    • /
    • 2007
  • A tall building construction is needed to reduce the construction duration for project profitability. Reducing the cycle time of typical floor in the structural frame work which have the largest duration in the whole construction, greatly affects construction duration. Nowadays, some projects are accomplished in the 3 day cycle. In order to accomplish efficiently 3 day cycle, productivity information of similar projects is supported. Therefore, this study proposed labor productivity and application by slab formwork to construct by the 3 day cycle. In order to perform an analysis, we selected 3 cases and analyzed the labor productivity on the basis of the amount of slab forms, labors, and durations. Then, we performed the questionnaire to analyze the application by formwork of tall building construction engineers. This study will contribute to establish a reasonable scheduling in structural frame work of a new similar project.

  • PDF

Development of Automated Welding System for Construction: Focused on Robotic Arm Operation for Varying Weave Patterns

  • Doyun Lee;Guang-Yu Nie;Aman Ahmed;Kevin Han
    • 국제초고층학회논문집
    • /
    • 제11권2호
    • /
    • pp.115-124
    • /
    • 2022
  • Welding is a significant part of the construction industry. Since most high-rise building construction structures rely on a robust metal frame welded together, welding defect can damage welded structures and is critical to safety and quality. Despite its importance and heavy usage in construction, the labor shortage of welders has been a continuous challenge to the construction industry. To deal with the labor shortage, the ultimate goal of this study is to design and develop an automated robotic welding system composed of a welding machine, unmanned ground vehicle (UGV), robotic arm, and visual sensors. This paper proposes and focuses on automated weaving using the robotic arm. For automated welding operation, a microcontroller is used to control the switch and is added to a welding torch by physically modifying the hardware. Varying weave patterns are mathematically programmed. The automated weaving is tested using a brush pen and a ballpoint pen to clearly see the patterns and detect any changes in vertical forces by the arm during weaving. The results show that the weave patterns have sufficiently high consistency and precision to be used in the actual welding. Lastly, actual welding was performed, and the results are presented.

건설기능인력 수급 불균형 문제 해결의 대안 제시 (Using Next Generation Technologies to Resolve Construction Labor Shortage Problems)

  • 이복남;우성권;장철기;구본상
    • 대한토목학회논문집
    • /
    • 제26권6D호
    • /
    • pp.969-974
    • /
    • 2006
  • 국내 건설현장 기능 인력 부족 문제가 심각하다. 현재 국내 건설현장은 신규 인력 진입 저조에 따른 공급 부족과 기능 인력의 고령화에 따른 생산성 저하 등 양적, 질적인 문제를 동시에 겪고 있다. 여기에 현재 계획되고 있는 대규모 국가사업으로 향후 건설현장 기능 인력의 부족은 더욱 심각해질 전망이다. 건설현장 기능인력 수급 불균형 문제에 대한 해결방안으로서의 공급 확보 정책은 시대의 흐름과 기술 발전에 따른 미래 전망을 고려해볼 때, 어느 정도 한계가 있다고 판단되며, 기술적 접근을 통해 기능 인력에 대한 수요를 줄이는 노력이 병행되어야 한다고 판단된다. 기술 발전을 통한 기능인력 수요 감소를 위해서는 현장에서 수행되는 작업 프로세스의 생산성과 효율성을 향상시킬 수 있는 분야에 연구의 초점이 맞춰져야 하며, 기능인력 수요 저감의 핵심이 되며 연구개발 노력이 필요한 분야로서 1) 건설 자동화 및 기계화 확대를 통한 기능 인력의 대체, 2) 고성능 건설 자재 개발 및 활용으로 현장 작업량 저감, 3) 정보화 기술 도입으로 현장 작업대기 시간 감축에 의한 생산성 향상, 4) 모듈화, 선조립, 공장제작 등 선작업 방식의 적용을 통한 현장 기능 인력 수요 저감 및 생산성 향상, 5) 재설계/재시공 예방으로 추가 작업 발생 방지, 6) 기능 및 직종 통합에 의한 다기능 인력 양성, 7) 시공 프로세스 개선에 의한 작업 생산성 향상 등의 7가지 주제를 제시하였다.

물가변동에 따른 계약금액 조정방식의 지수조정율 산출에 관한 연구 (A Study on the Escalation Method for Contract Adjustment Public Construction Project)

  • 배경태;최동수;황치원
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2005년도 추계 학술논문 발표대회
    • /
    • pp.117-120
    • /
    • 2005
  • The business market of architecture has got a system that controls a deposit according to the price function. This system is written on a law of contract about countries. So the main body of construction has to make a reasonable contract. This study is written about a rate of numerical index on controling a deposit. We tried to fine problems and solutions of labor expenses, instrument costs and material costs which is so big and changable on the construction market Labor expenses are expressed according to the rate of construction scale between direct and indirect cost that applies ability of works. Instrument costs are expressed according to an output method of a unit price annually and a weight allowance of local instrument conditions and use frequence. The last material costs expressed according to a local weight allowance make a decision of the material cost index. They applies locally relative index more than absolute one on what uses the price rate of producers and importations. This solutions are not enough to apply to the real market, so it needs to exam and to be on the market after a feasibility study.

  • PDF

설계변경으로 인한 작업 생산성 손실 산정방법 (A calculation method on the loss of labor productivity due to change orders)

  • 전용덕;이재섭
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2001년도 학술대회지
    • /
    • pp.295-300
    • /
    • 2001
  • 건설사업에서 설계변경으로 인해 공사기간의 연장뿐만 아니라 이로 인한 추가적인 비용이 발생하고 있다. 추가비용 중에서 간접비 부분은 산정방법이 다양하다. 외국의 경우, 작업 생산성 손실 산정과 관련된 많은 클레임에서 각 연구기관에서 수행한 발표자료를 인용하고 있다. 하지만, 국내의 경우 생산성 손실을 발생시키는 여러 요소들이 왜 발생하는지, 그리고 전체 프로젝트에 어떤 영향을 미치는지에 대한 이해 및 연구에 관한 자료는 극히 미비한 실정이다. 따라서, 본 논문에서는 건설현장에서 생산성 손실에 영향을 주는 요소들을 분석하고, 이로 인해 발생하는 손실을 국내 현실에 적합하게 정량적으로 산정 한 수 있는 방법을 제안하고자 한다.

  • PDF

Developing a Safety Scaffold Monitoring System Using Wireless Sensor Network Technology

  • Tserng, H. Ping;Huang, Hung-Jui;Li, Xin-Yan;Huang, Han-Tang
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.324-327
    • /
    • 2015
  • Scaffold is the most commonly used equipment in various types of construction works. Since various types of construction works use the same scaffold equipment, it becomes more difficult to be controlled and managed, thus resulting hazard frequently. According to the information announced in July 2012 by Council of Labor Affairs Executive Yan, the site collapse or incomplete anti-falling protection has led the site to accident frequently, and this is the main reason that causes construction industry occupational disasters. The labor death occupational hazard ratio rises up to 13% in scaffold activity, and the Council of Labor Affairs Executive Yan has showed that the death ratio is higher when using the scaffold in construction site, the total number of death has reached to 139 from 2005 to 2010. In order to ensure the safety of scaffold user, this study tends to build a wireless sensor monitoring system to detect the reliability and safety of the scaffold. The wireless sensor technique applies in this study is different with the traditional monitoring technique which is limited with wired monitoring. Wireless sensor technique does not need wire, it just needs to consider the power supply for establishing the network and receiving stable information, and it can become a monitoring system. In addition, this study also integrates strain gauge technique in this scaffold monitoring system, to develop a real-time monitoring data transfer mechanism and replace the traditional wired single project monitoring equipment. This study hopes to build a scaffold collapse monitoring system to effectively monitor the safety of the scaffold as well as provide the timesaving installation, low-cost and portable features.

  • PDF

건설기능인력의 업무환경 및 생산성 분석을 통한 기능인력의 효율적인 관리방안에 관한 연구 (A Study on the Effective Management Methods of Craftsmen through Job Environment and Productivity Analysis of Construction Craft Workers)

  • 하기주;하민수;이동렬
    • 대한건축학회논문집:구조계
    • /
    • 제35권12호
    • /
    • pp.173-180
    • /
    • 2019
  • Construction work is a labor-intensive industry, which is required systematic production activities using materials, manpower, and equipment. Among them, manpower resources play a very important role in achieving efficiently production in the organization. Construction work is highly dependent on construction craft workers, and the level of proficiency can be directly related to the construction productivity and quality. However, a rapidly aging construction craft workers in Korea, is being replaced by a foreign construction craft workers because of advoidance of new laborers in the construction site. In the future, if the continuous development and management of construction manpower is not made properly, it may be lead to adverse effects such as setbacks in production, delayed completion, faulty construction, industrial disasters, and decreased productivity in construction site. In this study, it was proposed four important factors for work capacity management of construction craft workers. These were ensuring of physical strength through the health management of construction craft workers, securing of proficiency through career management, ensuring of productivity through work capacity and establing of informatization through work capacity management. By introducing a systematic system, it is possible to improve construction craft workers' professionalism, enhancing the level of welfare, reflecting the realities of labor costs, increasing the quantitative and qualitative levels of construction craft workers, Futhermore it was demanded the continued interest and policy support for the realization of effective management of construction craft workers.

이중선체 벌크화물선의 선체구조설계 및 경제성 검토 (Structural Design and Cost Evaluation of Double Hull Bulk Carrier)

  • 송하철;염재선;김병일
    • 동력기계공학회지
    • /
    • 제9권2호
    • /
    • pp.106-111
    • /
    • 2005
  • After many casualties of conventional bulk carriers in recent years, a double hull bulk carrier was proposed to enhance the structural safety of a side shell and a transverse bulkhead. In this paper, two alternative structural designs of a double hull bulk carrier were carried out based on the Lloyd's rule. One has the double sided hull with longitudinal stiffeners and the other has that with a girder. The final structural design was examined in comparison with an existing single hull bulk carrier from the viewpoints of cargo hold capacity and the increases of weight and construction cost. Generally, the construction cost of a ship consists of the costs of material, labor and overhead cost. But, in this study, the relative construction cost concept was introduced to compare the economical validity more precisely. In this concept, fixed overhead cost is excluded in the assessment of construction cost, and only the variable overhead cost is added up to labor cost. As the result of this study, a double hull bulk carrier can be constructed within 1% increase of weight and construction cost.

  • PDF

건축물 조립성 및 분해성의 역학적 정량평가를 위한 가속도계의 적용성 분석 (Application of Accelerometer for Quantitative Mechanical Evaluation of Assembly and Disassembly Properties of Building)

  • 안재철
    • 한국건축시공학회지
    • /
    • 제15권1호
    • /
    • pp.107-113
    • /
    • 2015
  • 최근 건설 분야에서 기계화 공법 등이 활발히 개발되고 있지만, 건설 산업은 전체 산업분야 가운데 여전히 가장 많은 노동력을 필요로 하는 산업분야이다. 특히 재료 리사이클의 활성화를 위해서는 단일 소재화 분리를 위한 수작업에 의한 각종 해체작업 또한 증가하게 된다. 그러나 품셈을 비롯한 관련 통계 기반의 데이터베이스는 실제 인간 에너지의 분석에 한계가 있으며, 해체 작업의 경우는 대부분 정성적인 평가가 주를 이루어 왔다. 본 연구에서는 건설 분야의 인간 노동량의 정량 평가를 위하여 가속도계의 도입을 시도하였다. 이를 위하여 못과 나사못에 의한 조립 및 해체과정을 가속도계를 통하여 에너지량으로 산출하였다.

Improving safety performance of construction workers through cognitive function training

  • Se-jong Ahn;Ho-sang Moon;Sung-Taek Chung
    • International journal of advanced smart convergence
    • /
    • 제12권2호
    • /
    • pp.159-166
    • /
    • 2023
  • Due to the aging workforce in the construction industry in South Korea, the accident rate has been increasing. The cognitive abilities of older workers are closely related to both safety incidents and labor productivity. Therefore, there is a need to improve cognitive abilities through personalized training based on cognitive assessment results, using cognitive training content, in order to enable safe performance in labor-intensive environments. The provided cognitive training content includes concentration, memory, oreintation, attention, and executive functions. Difficulty levels were applied to each content to enhance user engagement and interest. To stimulate interest and encourage active participation of the participants, the difficulty level was automatically adjusted based on feedback from the MMSE-DS results and content measurement data. Based on the accumulated data, individual training scenarios have been set differently to intensively improve insufficient cognitive skills, and cognitive training programs will be developed to reduce safety accidents at construction sites through measured data and research. Through such simple cognitive training, it is expected that the reduction of accidents in the aging construction workforce can lead to a decrease in the social costs associated with prolonged construction periods caused by accidents.