A BIM-based Automated Framework for Formwork Planning on Construction Sites

  • Xu, Maozeng;Mei, Zhongya;Tan, Yi
    • 국제학술발표논문집
    • /
    • The 7th International Conference on Construction Engineering and Project Management Summit Forum on Sustainable Construction and Management
    • /
    • pp.52-61
    • /
    • 2017
  • Considering its significant impact on the cost and schedule of construction projects, formwork as one part of temporary facility categories in construction should be arranged precisely. Current practice in the formwork planning is often conducted manually and repetitively, causing low efficiency and time waste. This study proposes an automated framework to generate more accurate and detailed formwork plans by utilizing information from building information modeling (BIM) considering the adequate geometric and semantic information provided by the BIM model. The dimensions and quantities information of elements in a building can be extracted automatically. Then, a rule is prepared for calculating the required forms erected around elements based on the contact areas. Finally, an algorithm of integrating first fit decreasing (FFD) with coordinated bottom left (CBL) is applied to automatically generate the formwork plan. The BIM-based automated planning framework is demonstrated by an illustrative example. The results show that the proposed framework can generate the formwork plan accurately and automatically, and significantly improve the efficiency in the formwork plan and reuse.

  • PDF

거푸집공사 단계에서의 지구자기장 기반 작업자 실내측위기술 적용 방법 (Application of Geomagnetic Field-Based Indoor Positioning Technology in the Formwork Stage)

  • 김형준;이창우;김현민;안희재;이창수;조훈희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.213-214
    • /
    • 2023
  • Positioning information of workers is important for safety management at construction sites. Among the various indoor positioning technologies, geomagnetic fields-based technology is more economical and has less error than other technologies. However, there is a problem that the installation and dismantling of materials such as formwork at construction sites can cause degradation in positioning performance. Therefore, in this study, the distortion of the geomagnetic field near euro-form was quantitatively measured and the application method of geomagnetic field-based indoor positioning technology on formwork stage was presented. The results showed that the distortion occurred within 10cm of the wall and column form, but positioning accuracy could be affected up to 60cm from the form due to the characteristic of geomagnetic field-collecting technology. Therefore, applying this technology to the formwork stage requires complementary measures, such as using other positioning techniques up to 60 cm near the formwork, or excluding distorted area when positioning. It is expected that this study can contribute to the efficient safety management of workers by suggesting ways to prevent an increase in positioning error when applying geomagnetic field sequence-based indoor positioning technology during the formwork stage.

  • PDF

원자력 발전소 RCB 외벽 거푸집 1단 타설 높이별 시공성 분석 (Analysis of Construction RCB Exterior Wall Formwork Placing High on Nuclear Power Plant)

  • 송효민;신윤석
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 추계 학술논문 발표대회
    • /
    • pp.205-206
    • /
    • 2014
  • It is very important to reduce the construction duration of the Reactor Containment Building (RCB) when considering the more than 50 months on average from concrete placement to completion. The purpose of this study attempts to evaluate the single-stage workability of the system given a change in the height of the setting of RCB exterior wall formwork to be used in nuclear power plant construction. As a result of this study, it is possible height of 3.5m~4m uses formwork when analyzing the construction period and material costs an increase in formwork by concrete lateral pressure, to ensure the workability of the RCB exterior wall formwork. Through this study, I want to provide as basic data for the improvement of workability and RCB shortening the construction period.

  • PDF

거푸집공사 시공성 향상을 위한 거푸집 배치 효율화 지원 모델 - 구조부재 조정을 중심으로 - (A Support Model of Optimum Layout Planning of Forms for Improving Constructability of Formwork)

  • 이동민;임현수;김태훈;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 추계 학술논문 발표대회
    • /
    • pp.212-213
    • /
    • 2013
  • The constructability of Formwork has a importantly influence on the duration and cost in a construction project. However, the existing studies on the formwork are mainly focused on a method of construction. Although a layout planning of forms, especially, is an important factors affecting the constructability and cost, it is done by engineers empirically and intuitionally after completion of structure design. Therefore this study suggest a decision support model for optimal formwork layout model based on the rearrangement of structural members by using Genetic Algorithm to improve constructability of formwork.

  • PDF

가설구조물의 붕괴재해에 관한 연구 (A Study on the Collapse Accidents of the Temporary Structures)

  • 백신원;최순주
    • 한국안전학회지
    • /
    • 제14권4호
    • /
    • pp.142-147
    • /
    • 1999
  • Formwork is a temporary structure that supports its own weight and that of the freshly placed concrete as well as construction live loads including materials, equipments, and workmen. In designing and building formwork, the contractor should plan for economical construction without sacrificing quality or safety. But these temporary structures sometimes collapse during the concrete placing. Among the accidents and failures that occur during concrete construction, many are formwork failures, which usually happen at the time concrete is being placed. Generally some unexpected events cause one member to give way, then others become overloaded or misaligned and the whole formwork structure collapses. In this study, formwork failure events from 1994 to 1997 are analyzed using the structural analysis program. So the causes of the respective formwork failure are explored. Therefore, the present study provides a firm base to design the temporary structures such as formwork.

  • PDF

고층 주거건축물 거푸집의 편익/비용 분석에 관한 연구 (A Study on Benefit/Cost Analysis of Form Work Methods for High-rise Residential Buildings)

  • 김재엽;김재현
    • 한국건축시공학회지
    • /
    • 제10권4호
    • /
    • pp.49-57
    • /
    • 2010
  • 고층 주거건축물 공사에서 적합한 거푸집의 선정 여부는 프로젝트의 성패를 좌우하는 중요한 요인이다. 그러나 현재 국내 고층 공사는 거푸집별 특성을 고려한 적합한 거푸집 선정이 이루어지지 못하는 실정이다. 합리적이고 체계적인 거푸집 선정을 위해서는 공사비뿐 아니라 공기, 품질, 안전 등을 포함한 종합적인 고려가 요구된다. 따라서 본 연구에서는 공사비, 공기, 품질, 안전측면에서 거푸집 선정에 대해 계층분석적 의사결정(AHP)의 과학적 방법론을 제시하여 거푸집 선정 프로세스를 과학적 방법으로 합리화 하고자 한다. 이를 위해 국내 고층 주거건축물에 사용된 거푸집 현황을 조사 후 이를 토대로 거푸집 대안을 선정하고 공사 전문가들을 대상으로 거푸집 선정 시 관리 우선순위 및 거푸집 적용성에 대한 설문조사를 실시하였다. 본 연구 결과는 고층 주거건축물 거푸집 선정 시 기존의 비과학적인 방법을 보다 과학적이며 합리적인 의사결정에 기여할 것으로 판단된다.

초고층 거푸집 공사 공기 단축을 위한 테이블폼 해체 순서 최적화 모델 (Optimization Model of Table Form dismantlement Sequence for Reducing Formwork Duration in Tall Building Construction)

  • 남철우;권재범;임현수;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 추계 학술논문 발표대회
    • /
    • pp.196-197
    • /
    • 2015
  • In tall building construction, time for transporting form affects formwork duration as plan size has become larger and quantity of inputted form has been increased. Thus, necessity of systematic dismantlement sequence of form has been increased to reduce the duration of formwork. Tabu search has been efficiently applied to solve problem of combinatorial optimization by using tabu list which can improve combination values. Therefore, this study proposes optimization model of dismantlement sequence of table form which has been preferred in tall building construction, to reduce the formwork duration by minimizing time for transporting form.

  • PDF

급결제의 인젝터 주입이 고유동 모르타르의 거푸집 누출량 저감 가능성 분석 (Analysis of Possibility of Reduction of Formwork Leakage of High Fluidity Mortar by Inject Accelerator)

  • 임군수;한준희;현승용;김종;한민철;한천구
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2022년도 가을 학술논문 발표대회
    • /
    • pp.21-22
    • /
    • 2022
  • High fluidity concrete has excellent workability, and if the cross-section of the building is complicated, it is possible to place good quality concrete and increase the construction speed, so its utility value is very high. However, it is premised on the accuracy of concrete formwork assembly. Concrete leakage through formwork gaps is an important consideration when applying high flow concrete. In order to quickly solve the leak of high fluidity concrete caused by formwork gap occurring at the site by accelerator injection, we proceeded with research to confirm the possibility of reducing the amount of formwork leakage of high fluidity mortar. It was confirmed that the injection of the accelerator could reduce the amount of mortar leakage.

  • PDF

초고층 거푸집 공사의 시공성 검토를 위한 3D Printing의 활용 (Application of 3D Printing Technology for Formwork Constructability Review in Tall Building Construction)

  • 이준혁;이동민;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 추계 학술논문 발표대회
    • /
    • pp.69-70
    • /
    • 2016
  • The constructability of formwork has a significantly influence on the duration and cost in tall building construction. However, current installation and dismantling process are conducted with heuristic approaches due to the absence of reasonable constructability review method. This study proposes a new method to review the constructability of formwork by utilizing 3D printing technology. It is expected that the suggested review method could reduce formwork duration and cost with subjective, but rational manner.

  • PDF

개방형 BIM을 활용한 벽체 거푸집설계 프로토타입 개발 (Development of A Prototype for Wall Formwork Designs using Open BIM)

  • 김승권;김현주;현창택;한상원
    • 한국건설관리학회논문집
    • /
    • 제19권6호
    • /
    • pp.3-13
    • /
    • 2018
  • 거푸집공사비는 건축공사비의 10~15%, 골조공사비의 30~40%로, 건축공사에서 차지하는 비중이 상당하다. 또한 거푸집 붕괴로 인한 사망재해가 빈번하게 발생하고 있어, 다른 공종에 비하여 상대적으로 재해강도가 높은 공종이라 할 수 있다. 이처럼 건설 프로젝트에서 거푸집을 설계할 때 정확한 물량산출과 구조계산은 매우 중요한 사항이다. 따라서 본 연구에서는 거푸집설계를 용이하게 하기 위하여 거푸집공사에 관련된 새로운 IFC Entity를 제안하였으며, "개방형 BIM 거푸집설계 프로토타입"을 개발하였다. 본 연구에서 제안하는 거푸집설계 접근법은 시공 관리자로 하여금 정확한 물량산출과 신속한 계획 및 시공을 수행하는데 도움을 줄 것으로 기대된다. 하지만 본 연구는 소규모 특정건축물과 유로폼 만을 대상으로 수행하였기 때문에, 그 외의 건축물의 거푸집공사에 적용하기에는 한계가 있고, 범용적으로 거푸집공사에 적용하기 위해서는 추가적인 연구가 필요할 것이다.