Proceedings of the Korean Institute of Building Construction Conference (한국건축시공학회:학술대회논문집)
- 2022.11a
- /
- Pages.21-22
- /
- 2022
Analysis of Possibility of Reduction of Formwork Leakage of High Fluidity Mortar by Inject Accelerator
급결제의 인젝터 주입이 고유동 모르타르의 거푸집 누출량 저감 가능성 분석
Abstract
High fluidity concrete has excellent workability, and if the cross-section of the building is complicated, it is possible to place good quality concrete and increase the construction speed, so its utility value is very high. However, it is premised on the accuracy of concrete formwork assembly. Concrete leakage through formwork gaps is an important consideration when applying high flow concrete. In order to quickly solve the leak of high fluidity concrete caused by formwork gap occurring at the site by accelerator injection, we proceeded with research to confirm the possibility of reducing the amount of formwork leakage of high fluidity mortar. It was confirmed that the injection of the accelerator could reduce the amount of mortar leakage.