Analysis of Possibility of Reduction of Formwork Leakage of High Fluidity Mortar by Inject Accelerator

급결제의 인젝터 주입이 고유동 모르타르의 거푸집 누출량 저감 가능성 분석

  • 임군수 (청주대학교 건축공학과) ;
  • 한준희 (청주대학교 건축공학과) ;
  • 현승용 (청주대학교 산학협력단) ;
  • 김종 (청주대학교 건축공학과) ;
  • 한민철 (청주대학교 건축공학과) ;
  • 한천구 (청주대학교 건축공학과)
  • Published : 2022.11.10

Abstract

High fluidity concrete has excellent workability, and if the cross-section of the building is complicated, it is possible to place good quality concrete and increase the construction speed, so its utility value is very high. However, it is premised on the accuracy of concrete formwork assembly. Concrete leakage through formwork gaps is an important consideration when applying high flow concrete. In order to quickly solve the leak of high fluidity concrete caused by formwork gap occurring at the site by accelerator injection, we proceeded with research to confirm the possibility of reducing the amount of formwork leakage of high fluidity mortar. It was confirmed that the injection of the accelerator could reduce the amount of mortar leakage.

Keywords