• 제목/요약/키워드: Construction Cost Index

검색결과 198건 처리시간 0.026초

건설공사 안전관리 및 시공 업무의 중요도 분석에 관한 연구 (Analysis of Construction Safety Management and Execution Tasks for Performance Improvement)

  • 강상훈;김대영
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 추계 학술논문 발표대회
    • /
    • pp.130-131
    • /
    • 2018
  • The main purpose of this study is to analyze the importance of the construction work of apartment buildings. The construction work operation was divided into five major tasks, which include: Schedule Control (P'1 - P5) Construction Management (C'1 - C'5), Environmental Management (E'1 - E'3), and Quality Management. Finally, this study derived major construction execution tasks through correlation between construction work and the original index and t-test.

  • PDF

초·중·고등학교 시설물별 추정공사비 산정모델 개발 (Development of Construction Cost Estimation Model for Elementary, Middle and High School Facilities)

  • 정의현;염동준;김준상;김영석
    • 한국건설관리학회논문집
    • /
    • 제22권3호
    • /
    • pp.69-78
    • /
    • 2021
  • 추정공사비는 기본설계 이전단계에서 건설사업에 투입되어야 하는 적정 예산의 확보를 위해 산정되는 중요한 건설공사비 지표이다. 여러 공공기관에서는 추정공사비를 산정하기 위해 공공건축물 세부 유형별 단위면적당 공사비를 도출하고, 이를 해당 건축물의 연면적에 곱하는 방식을 사용하고 있다. 그러나 일부 공공건축물들은 그 시설물의 구성 및 조합이 다양하여 세부 유형별로 단위면적당 공사비를 산정하는 획일화된 현행 추정공사비 산정방법으로는 공공건축물 내 여러 시설물 조합에 따른 특성을 반영할 수 없어 신뢰성 있는 추정공사비를 산정하는데 한계성을 지니고 있는 것으로 조사 및 분석되었다. 본 연구의 목적은 발주 빈도수 및 누적사업비용의 규모가 크고 시설물의 구성 및 종류가 다양한 초·중·고등학교를 대상으로, 시설물 조합에 따른 추정공사비 산정방안을 제시하는 것이다. 본 연구에서 개발한 초·중·고등학교 시설물별 추정공사비 산정모델 및 분석 방법론을 실무에 적용할 경우 공공발주자는 보다 합리적이고도 신뢰성 있는 초·중·고등학교의 추정공사비 산정이 가능할 것으로 기대된다.

Delays and its Analysis: Indian Residential Construction Projects

  • Metha, Rakesh L.;Gaikwad, Suraj V.
    • Journal of Construction Engineering and Project Management
    • /
    • 제7권4호
    • /
    • pp.20-28
    • /
    • 2017
  • In almost every construction project, delay is an inevitable yet controllable phenomenon. The Indian construction industry encounters an enormous amount of delays in projects. Delay affects both time and money in the forms of schedule and cost overruns, respectively. Due to impressive and dynamic growth in the Indian construction sector, planned efforts are essential to limit these undesirable delays. On account of the surge in the rate of residential building construction, the task of identification and analysis of the delays in residential projects in India has been attempted by the authors. A questionnaire survey was conducted involving 100 stakeholders. Further analysis included an Importance Index to rank the identified delays, Principle Component Analysis for advanced statistical analysis, and Correlation Analysis to check the extent of agreement amongst stakeholders. Conclusions drawn with reference to the analysed data eventually reflected finance-related issues, as well as labour related problems as the dominating causes of delays. The aim of the research is to provide insight to the construction stakeholders and researchers, on an international scale, with the obtained results.

내후성강재의 화학성분 및 기계적성질에 관한 통계적 분석 (A Statistical Analysis on the Chemical Compositions & Mechanical Properties of Weathering Steels)

  • 경갑수;권순철
    • 한국강구조학회 논문집
    • /
    • 제15권2호
    • /
    • pp.147-157
    • /
    • 2003
  • 최소유지관리의 LCC관점에서 강구조물에의 적용이 증가하고 있는 내후성강재를 대상으로 Mill Sheet를 수집하고 이를 통계적으로 분석하여 화학성분, 기계적성질, 용접성지수, Weathering Index 및 충격흡수에너지에 대해 정량적으로 조사하였다. 본 연구결과 국내에서 생산되고 있는 내후성강재의 화학성분, 기계적 성질 및 충격흡수에너지는 분산의 폭이 약간 크게 나타났으며 KS에서 규정하는 기준값을 충분히 만족하고 있는 것으로 나타났다. 또, 용접성지수 및 Weathering Index는 일본 도로교시방서 및 ASTM의 기준을 만족하고 있는 것으로부터 국내 내후성강재의 품질을 확인 할 수 있었다.

신뢰구간상에서 EVMS 성과지수모델의 검정에 관한 연구 (A Study for Verification of the Performance Index Model of EVMS in Credible Interval)

  • 강병욱;이영대;박혁;천용현
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2002년도 학술대회지
    • /
    • pp.478-481
    • /
    • 2002
  • 현재 국내 건설프로젝트에 EVMS가 도입되어 비용과 공정을 효과적으로 통합하여 관리하고 있으나 EVMS는 선진 외국의 건설환경에 적합한 방법으로서 이 EVMS를 국내에 적용하는 데에는 다소 어려운 점이 발견되고 있다. 본 논문에서는 EVMS에서 최종공사비(EAC)를 예측하는데 사용되고 있는 지수중의 하나인 합성지수(CI)의 가중치 n, m에 대한 통계적 분석을 통하여 신뢰구간상에 나타나는 합성지수(CI)를 검정하여 최종공사비(EAC)를 예측하는데 효과적으로 사용하고자 한다.

  • PDF

공공시설물의 생애주기비용 평가기준 개발 (The Development of Life Cycle Cost Evaluation Index for Public Facilities)

  • 김태희;구본학;김옥규;박태근;이현수
    • 한국건설관리학회논문집
    • /
    • 제9권6호
    • /
    • pp.216-224
    • /
    • 2008
  • 최근 들어 선진국에서는 LCC에 대한 평가 제도를 활발히 활용 중에 있고, 우리나라는 생애주기비용을 절감하기 위하여 그 제도를 신규로 도입하고 있다. 그리고 새로운 정부공사 발주방식인 “기술제안형 입찰방식” 도입에 따라 시설물의 LCC 평가가 필요하게 되었다. 현재 우리나라는 BTL과 턴키 프로젝트에서 LCC를 평가하고 있으나 평가요소와 기준이 불명확하여 평가에 어려움을 겪고 있고, BTL과 턴키를 제외한 공공건설사업은 LCC 평가가 이루어지지 않고 있는 실정이다. 따라서 본 연구에서는 LCC를 체계적이고 객관적인 평가를 위한 평가기준 및 활용방안을 제시하고자 한다. LCC 평가기준을 도출을 위한 연구방법 및 주요결과는 다음과 같다. (1) 기존의 평가기준을 분석하여 평가기준의 필요성 및 문제점을 파악하고, (2) 보고서분석 및 설문조사를 통하여 LCC 평가기준을 도출하였고, (3) 실무에서 합리적으로 활용할 수 있도록 활용방안 및 평가방법을 제시하였다.

Optimum design of steel frame structures considering construction cost and seismic damage

  • Kaveh, A.;Fahimi-Farzam, M.;Kalateh-Ahani, M.
    • Smart Structures and Systems
    • /
    • 제16권1호
    • /
    • pp.1-26
    • /
    • 2015
  • Minimizing construction cost and reducing seismic damage are two conflicting objectives in the design of any new structure. In the present work, we try to develop a framework in order to solve the optimum performance-based design problem considering the construction cost and the seismic damage of steel moment-frame structures. The Park-Ang damage index is selected as the seismic damage measure because it is one of the most realistic measures of structural damage. The non-dominated sorting genetic algorithm (NSGA-II) is employed as the optimization algorithm to search the Pareto optimal solutions. To improve the time efficiency of the proposed framework, three simplifying strategies are adopted: first, simplified nonlinear modeling investigating minimum level of structural modeling sophistication; second, fitness approximation decreasing the number of fitness function evaluations; third, wavelet decomposition of earthquake record decreasing the number of acceleration points involved in time-history loading. The constraints of the optimization problem are considered in accordance with Federal Emergency Management Agency's (FEMA) recommended seismic design specifications. The results from numerical application of the proposed framework demonstrate the efficiency of the framework in solving the present multi-objective optimization problem.

공공 건설공사에서의 실적공사비 적용에 따른 물가변동률 산정기준 개선방안 (Improved Escalation Method for the Cost Estimation System using Previous Bid Price in Public Construction Projects)

  • 백승호;강태경;이유섭
    • 한국건축시공학회지
    • /
    • 제12권1호
    • /
    • pp.108-114
    • /
    • 2012
  • 본 연구에서는 실적공사비 적용분에 대한 지수조정율 산정기준의 현황과 문제점을 분석하고 개선방향을 제시하였다. 실적공사비 적용분에 대해 공종별 실적공사비 단가의 평균값을 적용하는 기존 방식은 단가 규모가 큰 6개 공종의 변동이 전체를 좌우하여 유사 물가지표와 다른 추세를 보이는 등 비판 소지가 있다. 이에 건설공사비지수 등을 활용하는 개선방안을 제시하고 사례분석을 통해 개선의 당위성을 검증하였다. 실적공사비 비목군에 대해 건설공사비지수 등락율을 적용하는 첫번째 대안의 경우 건설공사비지수가 생산자물가지수를 활용한 가공통계이므로 유사지표간 등락추세의 일관성을 기할 수 있고, 기존 방식에 비해 물가변동 대가가 현실화될 수 있게 된다. 노무비 부분을 분리하여 별도 기준을 적용하는 두 번째 방안도 실적공사비 적용분 노무비율 만큼 투입구조 왜곡 문제가 완화되며, 유사 물가변동지표에 근접하게 되고, 물가변동 대가가 현실화된다는 측면에서 효과를 기대할 수 있다.

고속철도 강교량의 부식.피로신뢰성 기반 생애주기비용 분석 (Corrosion-Fatigue Reliability-Based Life Cycle Cost Analysis of High-Speed Railway Steel Bridges)

  • 전홍민;선종완;조효남
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 추계학술대회 논문집
    • /
    • pp.1132-1140
    • /
    • 2007
  • As it recently appears that Life Cycle Cost Analysis may be considered as new methodology for economic valuation of infrastructure many researches have been made to assess LCC(Life Cycle Cost) of each facility based on a reasonable methods. In general, LCC is composed of construction cost and expected maintenance repair cost. And especially, maintenance repair cost must be estimated to enhance the reliability through systematic and reasonable methods. However in Korea, because high speed railway steel bridges are recently constructed no direct statistical data are available for the account of the maintenance cost and then their maintenance characteristics are not linear yet. Therefore, the approach proposed in the paper utilizes a theoretical determination and degradation of the corrosion and fatigue of the bridges based on Rahgozar et al.(2006)'s model on fatigue notch factor considering into the corrosion to incorporate the corrosion effect into the fatigue strength reduction model. And then, the corresponding probability of failure is calculated in terms of the reliability index using S-N curve to formulate the fatigue limit state. Therefore, this paper proposes the minimum Life Cycle Cost through optimum maintenance plan analysis of high-speed railway steel bridges under construction. Finally, this paper reviews the proposed model in oder to confirm the applicability and feasibility by appling it to high speed railway steel bridges under construction

  • PDF

A STUDY ON THE INTRODUCTION OF THE PAY ADJUSTMENT SYSTEM FOR THE VOLUNTARY ASSURANCE OF QUALITY BY THE CONTRACTORS

  • Byung-Ok Noh;Sang-Beom Lee;Jai-Dong Koo
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.521-525
    • /
    • 2011
  • Although the Korean construction industry has risen rapidly, the quality of the buildings is not met with the industry standard compared to the potential of the technology development and the cost of maintenance has been increased. The user's request for quality have been increased, but in the current building construction, the contractors only follow the specifications of design, material and technology, and their main concern is whether they are in right track with the specification or not. Thus, the necessity of developing technology has been ignored and sufficient opportunities for the development have not been provided as well. In the developed countries, in contrast, the quality assurance and the payment regulation system has been utilized for the active response to the changes of users' request. As a result of this, the maintenance cost has been decreased and the development of construction technology has been improved. Therefore the pay adjustment system is needed to create the improvement of the quality of the buildings by the contractors' earnest building construction. In order to introduce the pay adjustment system suitable to the Korean construction industry, this study presented the logical method of adjusting the construction cost and making payment with the pay adjustment index that is created based on the result of the performance test, after making a set of the indicators of the building performance standard and applied them to the targeted building.

  • PDF