BIM-BASED TIME SERIES COST MODEL FOR BUILDING PROJECTS: FOCUSING ON MATERIAL PRICES

  • Sungjoo Hwang;Moonseo Park;Hyun-Soo Lee;Hyunsoo Kim
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.1-6
    • /
    • 2011
  • As large-scale building projects have recently increased for the residential, commercial and office facilities, construction costs for these projects have become a matter of great concern, due to their significant construction cost implications, as well as unpredictable market conditions and fluctuations in the rate of inflation during the projects' long-term construction periods. In particular, recent volatile fluctuations of construction material prices fueled such problems as cost forecasting. This research develops a time series model using the Box-Jenkins approach and material price time series data in Korea in order to forecast trends in the unit prices of required materials. Building information modeling (BIM) approaches are also used to analyze injection times of construction resources and to conduct quantity take-off so that total material prices can be forecast. To determine an optimal time series model for forecasting price trends, comparative analysis of predictability of tentative autoregressive integrated moving average (ARIMA) models is conducted. The proposed BIM-based time series forecasting model can help to deal with sudden changes in economic conditions by estimating material prices that correspond to resource injection times.

  • PDF

실적자료 분석에 의한 적정 공사비 산정방법의 전산화 알고리즘 구축에 관한 연구 (A Study on the Construction of Computerized Algorithm for Proper Construction Cost Estimation Method by Historical Data Analysis)

  • 전재열
    • 한국건설관리학회논문집
    • /
    • 제4권4호
    • /
    • pp.192-200
    • /
    • 2003
  • 본 연구는 공공건설 공사에 실적자료에 의한 공사비산정 방법의 전산화 적용을 목적으로 먼저 실적공사비의 정의 및 구조와 현행 실적공사비 운영체계 이해를 통해 전산화의 문제점 및 개선기준을 공사비 산정방법 중심으로 분석 기술하였으며 제안한 기준에 따라 전산화 알고리즘을 제시하였다. 기존 예정공사비 산정방법은 일반적인 공종별 분류에 따른 실적자료조건과 단순히 물가지수, 연면적규모에 따른 시공단가를 적용함으로서 공사비산정의 정확성이 요구되며, 본 연구는 이에 대한 개선 안으로 부위와 부분별 공종분류 방식에 의한 데이터 추출조건으로 실적자료의 적용성과 신뢰성을 높였다. 또한 물량규모에 의한 공사비 변동요인을 물량규모 대비 단가의 확률적 회귀분석으로 예측 추정하여 실행 가능한 적정 공사비 산정방법을 제시하였다. 따라서 본 연구에서는 전산화 적용 방안으로 확률적 예정공사비산정방법을 기준으로 시스템 프로세스를 각 영역별로 구축하고 그에 따른 윈도우 어플리케이션 활용 툴과 개별 전산화에 대한 알고리즘을 구축하였다.

공동주택 공사의 현금흐름 예측 모델 개발에 관한 연구 (Development of a Cash Flow Forecasting Model for Housing Construction)

  • 장주환;김주형;지남용
    • 한국건축시공학회지
    • /
    • 제12권3호
    • /
    • pp.257-265
    • /
    • 2012
  • 공동주택 건설사업에서 건설사들은 다수의 프로젝트를 동시에 수행하고 있으며, 최적의 공정관리와 자원투입으로 프로젝트의 현금흐름을 정확히 예측하는 것은 합리적 자금운용과 경쟁력 향상을 위하여 필수적이다. 기존의 현금흐름 예측 방법은 수입과 지출요소의 차이가 크게 발생하여 정확성이 낮아졌다. 본 연구는 K 건설사의 공동주택 공사관리 실태를 조사하여 현금흐름 예측의 문제점을 파악하였다. 기존의 원가관리 시스템의 개선을 위해 업무프로세스와 공사관리 시스템의 통합이 필요하였다. 현금흐름 예측모델 구축을 위해 수입과 지출요소 및 지출방법 등을 종합 현금흐름 예측창에 표시하였다. 또한, K사의 실시간 손익실행금액과 매출기성을 산정할 수 있는 TO-BE 업무 모델을 구축하여, 수입과 지출의 부정확한 요소를 배제한 현금흐름 예측 모델을 제안하였다.

인공신경망 기법을 활용한 굴착공사 흙막이 변위량 예측에 관한 연구 (A Study on Neural Networks Forecast Model of Deep Excavation Wall Movements)

  • 신한우;김광희;김용석
    • 한국건축시공학회지
    • /
    • 제7권3호
    • /
    • pp.131-137
    • /
    • 2007
  • To predict deep excavation wall movements is important in the urban areas considering the cost and the safety in construction. Failing to estimate deep excavation wall movements in advance causes too many problems in the projects. The purpose of this study is to propose the forecast model of deep excavation wall movements using artificial neural networks. The data of the Deep Excavation Wall Movements which were done form Long research is used of Artificial neural networks training and apply the real construction work measured data to the Artificial neural networks model. Applying the artificial neural networks to forecast the deep excavation wall movements can significantly contribute to identifying and preventing the accident in the overall construction work.

소규모 건설 프로젝트에서의 공사예비비 산정방법에 관한 연구 (A Study on Estimating the Contingency Cost of Small Construct Project)

  • 송진우;표영민;박성호;이상범
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2004년도 학술.기술논문발표회
    • /
    • pp.113-117
    • /
    • 2004
  • We need the contingency cost in order to deal with the uncertainty to be accompanied inevitably at the construction and an every kind risk not to forecast in advance. And also the contingency colt needed for the change order and we need it for reduction of the delay and reduce the trouble between owner and constructor. This study, through checking and analyzing the risk factor, in the step of domestic construction, suggests optimal management reserve to specific business about the contract type and the scale. The main results of this research are summarized as follow. First, I investigated the recognition about the contingency cost, grasped the risk to be happened at the construction step and found out the frequency occurrence, through making up question to engineer are carrying out their job in the domestic construction. Second, I computed optimal contingency cost rate by the statistics investigation, and proposed an improvement plan and problem when compute a contingency cost.

  • PDF

실적자료에 의한 적정 건축공사비 산정 방법에 관한 사례연구 (A Study of the Application for Proper Construction Cost Estimating Method based on the Actual Cost Data)

  • 조재호;박상준;전재열
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2001년도 학술대회지
    • /
    • pp.383-386
    • /
    • 2001
  • 본 연구는 실적공사비적산 제도의 정착을 위한 적정 예정공사비 산정방법 제안 및 사례분석을 통해 타당성 검증을 목적으로 한다. 건설공사비는 미래의 예측으로 불확실성을 가지고 있으며 이는 과거의 실적에 의하여 추정할 수 있다. 실적자료는 건설환경의 다양성, 개별성, 특수성 등을 나타내줌으로서 이에 대한 자료조건 분류 및 보정으로 불확실한 공사비론 예측 가능하게 한다. 따라서 본 연구에서는 조건분류, 물가보정 및 확률적 개념을 도입하여 프로젝트 초기단계에서 및 실행예정가 산정시 적정 비용의 산정방법을 제안하고자 한다.

  • PDF

Forecasting Project Cost and Time using Fuzzy Set Theory and Contractors' Judgment

  • Alshibani, Adel
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.174-178
    • /
    • 2015
  • This paper presents a new method for forecasting construction project cost and time at completion or at any intermediate time horizon of the project duration. The method is designed to overcome identified limitations of current applications of earned value method in forecasting project cost and time. The proposed method usesfuzzy set theory to model uncertainties associated with project performance and it integrates the earned value technique and the contractors' judgement. The fuzzy set theory is applied as an alternative approach to deterministic and probabilistic methods. Using fuzzy set theory allows contractors to: (1) perform risk analysis for different scenarios of project performance indices, and (2) perform different scenarios expressing vagueness and imprecision of forecasted project cost and time using a set of measures and indices. Unlike the current applications of Earned Value Method(EVM), The proposed method has a numberof interesting features: (1) integrating contractors' judgement in forecasting project performance; (2) enabling contractors to evaluate the risk associated with cost overrun in much simpler method comparing with that of simulation, and (3) accounting for uncertainties involved in the forecasting project cost.

  • PDF

실적 공사비에 의한 예정공사비 산정 전산화 방안 (A Computerized Construction Cost Estimating Method based on the Actual Cost Data)

  • 전재열;조재호;박상준
    • 한국건설관리학회논문집
    • /
    • 제2권2호
    • /
    • pp.90-97
    • /
    • 2001
  • 공공기관에서 발주하는 건설공사의 계약에 있어서 가장 중요한 것은 합리적인 방법으로 결정된 적정한 예정가격을 기준으로 계약을 체결하는 것이다. 적정예정가격을 산정하기 위해서는 먼저 기수행한 실적공사비를 근간으로 하여 건설공사의 다양성과 불확실성을 반영할 수 있는 비용자료의 축적이 선결과제라 할 수 있다. 따라서 본 연구는 실적공사비적산방식에 따라 과거의 가장 유사한 실적자료에 기초한 확률적 비용개념을 도입하여 실적공사비 데이터 베이스 구축 모형과 이를 통한 예정공사비 산정방법 및 전산화 방안을 제시하고자 한다.

  • PDF

코스트 중요항목 분석을 통한 공사비 예측모델 연구 (Development of Construction Cost Model through the Analysis of Critical Work Items)

  • 이유섭
    • 한국건설관리학회논문집
    • /
    • 제4권4호
    • /
    • pp.212-219
    • /
    • 2003
  • 건설공사에서 공사비 계획 및 관리를 위한 코스트 모델은 공사입찰$\cdot$계약단계에서 도급공사비 결정에 중요한 기능을 담당할 뿐만 아니라 건설사업 수행 전 단계에 걸쳐 건설공사에 소요될 비용을 추적, 관리하여 주어진 예산범위 내에서 최적의 목적물을 설계 시공하여 궁극적으로 발주자의 투자비용에 대한 가치를 극대화하고 비용관리업무의 적정성을 도모하는 기능을 담당하고 있다. 그동안 내역입찰방식을 널리 채택하고 있는 건설공사에서 내역서는 공사비 예측 및 계획 등 공사관리에 있어서 중요한 수단으로 활용하여 왔으나, 현행 내역모델은 공사비의 예측 및 비용관리 측면에서 지나치게 상세하며, 공사계획 및 관리 업무와 연계시키는데도 한계가 있는 것으로 지적되고 있다. 건설공사를 구성하는 세부 단위작업에 소요되는 비용은 모두 중요한 관리대상이지만, 단위작업의 내용에 따라 비용이 차지하는 비중과 코스트 결정에 미치는 영향력에는 차이가 있다. 이러한 비용결정의 구조적 메커니즘에 착안하여 본 연구에서는 건설공사 비용결정에 중요한 영향을 미치는 작업내용을 규명하여 정확성을 유지하면서 단순 간결한 코스트 예측모델을 제안 및 검증하는 것을 목적으로 하고 있다.

시계열분석을 통한 실적공사비의 노무비 분석 및 예측에 관한 연구 (Time Series Analysis and Forecast for Labor Cost of Actual Cost Data)

  • 이현석;이은영;김예상
    • 한국건설관리학회논문집
    • /
    • 제14권4호
    • /
    • pp.24-34
    • /
    • 2013
  • 2004년부터 정부는 무분별한 저가입찰을 방지하고, 기술 경쟁에 의한 적정 시장 가격 반영 및 효율적인 계약관련 업무를 추진하는 것을 목적으로 실적공사비 제도를 도입 시행하고 있다. 하지만 실적공사비 제도의 도입이 낙찰단가 하락에 의한 정부의 예산 절감에만 기여할 뿐, 실질적인 시장가격을 반영하고 있지 못하고 있다는 우려의 목소리 또한 꾸준히 제기되고 있는 실정이다. 낙찰단가 하락에 의한 일반건설업체의 비용 부담은 전문건설업체로 전가되며 최종적으로 건설노동자의 피해로 이어질 가능성이 크기에, 실적공사비에 적정 가격을 반영하고 현실화하는 것은 성공적인 실적공사비 제도의 정착에 매우 중요한 요소이다. 따라서 본 연구는 노무비를 중심으로 노무중심공정을 도출하고 이들의 실적공사비단가와 해당 기능공의 시중노임단가를 비교하여 실적공사비의 현실화수준을 파악하고, 시계열분석을 통해 변화를 분석하고 예측하였다. 시장가격이 반영되지 않은 낙찰 단가의 실질적 하락은 노무 환경의 변화를 가속화하고, 임금체불, 업체부도 등 건설근로자의 직접적인 피해로 이어질 수 있기에 향후 본 연구가 현행 실적공사비 제도의 문제점을 해결하고, 개선방안을 수립하기 위한 기초 자료로 활용될 수 있을 것으로 기대된다.