1 |
Jang JH, Hwang GP, Jung GS. Kumho Asiana System of Construction & Cost Management. Seoul (Korea): Kumho E&C; 2010. 167 p.
|
2 |
Cho SS, Yoo KS, Lee CS, Seo Sw, Kim MH. A Study on the distribution of Progress Rate in the Domestic Apartment House Construction. Journal of Architectural Institute of Korea. 1991 June;11(2):649-54.
|
3 |
Jee BW, Lee DW, Kim KH, Kim YS. A Study on the Cash Flow Forecasting in Construction Project using Neural Network Theory. Journal of Architectural Institute of Korea. 2001 June;17(9):199-206.
과학기술학회마을
|
4 |
Lee KJ. A Sigmoid S-curve Model on Cash Flow Forecasting for Earned Value Management System. Journal of Architectural Institute of Korea. 2010 June;26(6):103-10.
|
5 |
Reischmidt KF, Frank WE. Construction Cash Flow Management System. Journal of the Construction Division. 1976 December;102(4):615-27.
|
6 |
Ashley DB, Teicholz PM. Pre-Estimate Cash Flow Analysis. Journal of Constrution Davision. 1977 September;103(3):369-79.
|
7 |
Gates M, Scarpa A. Priminary cumulative Cash Flow Analysis. Cost Engineering. 1979 June;21(6):243-49.
|
8 |
Bennett J, Ormerod RN. Simulation Applied to Construction Project. Construction Management and Economics. 1984 October;2:225-63.
DOI
|
9 |
Navon R. Company-Level Cash-Flow Management. Journal of Construction Engineering and Management. 1996;122(1):22-9.
DOI
|
10 |
Kaka AP, John L. Development of a Company-Level Dynamic Cash Flow Forecasting Model (DYCAFF). Construction Management and Economic. 2003 October21(1):693-705.
DOI
ScienceOn
|
11 |
Hwang GP, Jung GS. Master Progress Schedule D/B of Apartment Construction & Partial Ratio. Seoul (Korea): Kumho E&C; 2010. 135 p.
|
12 |
Kim WY, Won DS, Lee HS. A Method of Calculating Schedule Variance on the Basic of Work Density. Journal of Architectural Institute of Korea. 2002 June; 18(6):153-60.
|
13 |
Yang YC, Kim JJ. A Study on the Estimation of Integrated Future Cash of Large-Scale APT Construction Project through Improvement of Process -Construction Cost Integrated Process [dissertation]. Seoul (Korea): Hanyang University; 2004. 214 p.
|
14 |
Park HG. A Case Study of Implementation for Cash Flow Forecasting System in Construction Company. Journal of Civil Institute of Korea. 2009 May;29(3D): 391-7.
과학기술학회마을
|