A PLIB-based New Bridge Breakdown System Considering Functional Properties - Focused on Geometric Modeling - (교량 구성요소의 기능적 특징을 고려한 PLIB 기반 제품 분류체계 - 형상 정보모델링을 중심으로 -)

  • Lee, Sang-Ho;Lee, Hyuk Jin;Park, Sang I.;Choi, Kyou-Won;Kwon, Tae Ho
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.29 no.4
    • /
    • pp.335-345
    • /
    • 2016
  • It has problems to use the existing construction information classification system as the bridge breakdown structure due to lack of relationships between element classes. In this study, we proposed the bridge breakdown system for supplementation of above-mentioned classification system. The proposed system, for geometric information modeling, was based on international standards of methodology for structuring part families namely PLIB Part 42. In particular, the breakdown system, considering of the functional classification for the semantic information of the elements is included. In addition, we proposed a basic framework for actual modeling using bridge breakdown system and showed that it can be used in practice.

Development of Earned Value Management System by Using Visualization Index and WBS Map (시각화 지표 및 좌표식 정보분류체계에 의한 공정.공사비 통합관리시스템 개발)

  • Lee, Woo-Sik;Kang, Leen-Seok;Park, Seo-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.26-35
    • /
    • 2009
  • Work breakdown structure (WBS) can be used as an information center in earned value management system (EVMS) for the construction project. Because EVMS results, such as schedule variance and cost variance, are analyzed for the selected WBS code, the role of WBS code is important in EVMS. This study suggests a methodology for organizing WBS map with a quadrant. It can represent the project organization collectively by work level in a coordinate system. And the study developed an EVMS tool based on the WBS map and this tool can visualize various attribute indexes of EVMS by color symbols. Those methodologies can be used for improving practical application of EVMS.

Development of Activity and WBS for Integrated Cost and Schedule Control Process in Bridge Works (공정$\cdot$공사비 통합관리를 위한 Activity 및 WBS 구축 방안 -교량공사 예시)

  • Kim Jung-Ki;Lee Young-Dae;Kim Soo-Yong;Park Hyeo;Kim Sung-Hwan
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.406-409
    • /
    • 2001
  • This study refers to development of WBS(Work Breakdown Structure) and Activity sample for integrated cost and schedule control system of sample bridge work in the field. The conclusions from this study may be summarized as following 1. It showed that the level of detail to network's activities depend upon schedule's intended purpose. 2. It is more effective 'activity to cost package model' than 'activity to resource model', for integrated cost and schedule control reflect the characteristics of domestic construction industry.

  • PDF

The Establishment of an Activity-Based EVM - PMIS Integration Model (액티비티 기반의 EVM - PMIS 통합모델 구축)

  • Na, Kwang-Tae;Kang, Byeung-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.1
    • /
    • pp.199-212
    • /
    • 2010
  • To establish an infrastructure for technology and information in the domestic construction industry, several construction regulations pertaining to construction information have been institutionalized. However, there are major problems with the domestic information classification system, earned value management (EVM) and project management information system (PMIS). In particular, the functions of the current PMIS have consisted of a builder-oriented system, and as EVM is not applied to PMIS, the functions of reporting, analysis and forecast for owners are lacking. Moreover, owners cannot confirm information on construction schedule and cost in real time due to the differences between the EVM and PMIS operation systems. The purpose of this study is to provide a framework that is capable of operating PMIS efficiently under an e-business environment, by providing a proposal on how to establish a work breakdown structure (WBS) and an EVM - PMIS integration model, so that PMIS may provide the function of EVM, and stakeholders may have all information in common. At the core of EVM - PMIS integration is the idea that EVM and PMIS have the same operation system, in order to be an activity-based system. The principle of the integration is data integration, in which the information field of an activity is connected with the field of a relational database table consisting of sub-modules for the schedule and cost management function of PMIS using a relational database management system. Therefore, the planned value (PV), cost value (CV), actual cost (AC), schedule variance (SV), schedule performance index (SPI), cost variance (CV) and cost performance index (CPI) of an activity are connected with the field of the relational database table for the schedule and cost sub-modules of PMIS.

A Study on the Elasto-Plasticity Behaviour of a Ship's Plate under Thrust According to Boundary Condition (압축력을 받는 선체판의 경계조건에 따른 탄소성거동에 관한 연구)

  • 고재용;박주신;박영현
    • Proceedings of KOSOMES biannual meeting
    • /
    • 2003.05a
    • /
    • pp.153-158
    • /
    • 2003
  • Design of general steel structure had applied and achieve elastic design concept mainly so far. Because elastic design supposes that whole structure complies with elasticity formula as that achieve via allowable stress of material is concept that calculate stress distribution of construction about action external load and estimate load of when the maximum stress reaches equally with allowable stress that is established beforehand by maximum safety load of the structure. But, absence that compose actuality structure by deal with external load increase small success surrender and structure hardness falls and tell structure in limit state finally on the whole as showing complicated conduct by interference between these breakdown at buckling by compression. Examined closely about conduct of place since initial buckling through carbon vocal cords transformation finite element analysis series (ANSYS) that place mending condition supposes case that is boundary condition in this investigation.

  • PDF

Analysis and survey of design decision making process in steel production process

  • Furukawa, Satoru;Yoshida, Tomohiro;Chi, Naiyuan;Okamoto, Hiroyuki;Furusaka, Shuzo
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.30-37
    • /
    • 2020
  • In the building construction, the steel-frame work occupies an important position in terms of structure, cost and quality. Especially in Japan, steel frames have traditionally been the main structure of many buildings. For steel-frame works in such positions, this paper investigates an existing steel fabricator to clarify the actual conditions of design decision making process and management method in steel production process. This study focuses on a steel fabricator (Company M in the following sentences), whose main market is Japan and which has facilities in Thailand, China, and Japan. Company M uses QR codes to control the production status of products, and exchanges all information between inside and outside the company via specialized departments in the form of documents. The authors have already analyzed the relationship between production lead time and defect rate based on actual project data at Architectural Institute of Japan in 2016. In 2019, we expressed the process from the confirmation of the design information of the current steel frame to the production by WBS, and clarified the relationship between the production lead time and steel frame product quality structurally. In this paper, the authors reoport the progress of the survey conducted so far, the positioning of the collected data, and the future survey policy.

  • PDF

Procedure Development for Organizing Electronic Technical Manual of Construction Design Information and Applicability Analysis for Practical Project (건설공사 설계도서매뉴얼의 전자화 절차구성 및 실무 적용효과 분석)

  • Kang, Leen-Seok;Moon, Hyoun-Seok;Kwak, Joong-Min
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.2 s.39
    • /
    • pp.103-111
    • /
    • 2007
  • The existing design materials by document type are restricted in searching and acquiring necessary design information because the materials consist of huge information and various document types. This study suggests a methodology to develop an electronic technical manual that can manage construction design materials by XML-base integrated information system. Electronic technical manual for design materials can provide visualized information through various multimedia tools such as multi-link, virtual reality and animation. Using an integrated electronic manual for construction project can prevent to miss necessary design information. The results of this study includes a data flow diagram to develop an interactive electronic technical manual (IETM) for construction design information. Finally the study suggests some scenarios for practical use and quantitative analysis of application effect analysis by AHP method.

A Case Study on Assessing the Productivity of a BIM team in a Construction Company

  • Huang, Chien-Hsun;Hsieh, Shang-Hsien
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.259-262
    • /
    • 2015
  • Due to the labor-intensiveness, high investment cost, long execution time, frequent change orders, and many stakeholders in a BIM project, a BIM manager is bound to face a lot of risks to make decisions in cost managing process. Since the productivity of a BIM team will affect the execution cost, this study investigates a simple method of assessing the productivity of a BIM team using the working timesheet records of the team. In this research, the productivity of a BIM team is defined as the effective working floor area (in square meters) of BIM uses per labor-time (in man-months) spent by the team. After the applicability of this method is tested by regression analysis using data from 5 real BIM projects in the construction phase, it is found that the simple productivity definition adopted in the method, although easy-to-implement, does not produce a statistically constant productivity value. More research is therefore needed in the future to devise better indicator(s) for assessing the productivity of a BIM team.

  • PDF

Analysis of the Work Breakdown Structure and Cost-Rate for Small Interior Works in Apartment (아파트 소규모 인테리어공사의 공종별 분류와 보할의 분석)

  • Kim, Chae-Yong;Lee, Jong-Gyu;Lee, Jae-Yong;Lee, Soo-Yong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.1
    • /
    • pp.213-219
    • /
    • 2010
  • The research, based on 200 cases of small interior works in6 different floor area types of apartment in Busan, intended to compare the architectural work with the breakdown structure and analyze the cost of general small-scale interior work, by work type. The outcome of the research is outlined as follows. (1) Given the cost of small interior works for apartmentsranges from 10 million to 15 million won, which correspond to apartments ranging in size from $79.2m^2$ (24PY) to $105.6m^2$, it is necessary to implement a cost analysis for material cost and labor cost for these two types. (2) Given that small interior work for apartments comprises mostly finishing work, unlike the categoriesof general architectural work, it is more reasonable to classify the works into 9 categories,which include embellishment, wood, tile, paint, metal, toilet, sink & furniture, electric & mechanical and other works, instead of the 22 divisions stipulated in the Korean Architectural Standard Specification. (3) After reviewing the average cost of small interior work and rate by floor area, it was found thatthe average cost of 24PY was 10.5 million won, of which metal work accounts for 12.8%, embellishment work 17.8%, and toilet 19.7%, while sink & furniture appeared to be the highest with 22.1%, while for 32PY, average cost was 12.5 million won,which comprises 7.4% wood work, sink & furniture 20.2%, toilet 23.4% and embellishment work the highest at 28.6%, indicating that embellishment work accounts for the greater portion.

A Study on the Practical Utilization Analysis and Linkage Scheme of WBS and OBS from the Construction Manager (CMr) Perspective (건설사업관리자(CMr) 측면에서의 WBS와 OBS의 실무적 활용도 분석 및 연계 방안에 관한 연구)

  • Yang, Jinkook;Seo, Boram;Lee, Sangbeom
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.3
    • /
    • pp.57-64
    • /
    • 2020
  • Construction management performs a variety of tasks, and the buildup of the WBS and OBS is one of the core tasks. However, the practical utilization of WBS and OBS is low in the current construction management work. In this study, we conducted a survey of related experts to analyze the understanding, utilization level, application effect, and connectivity of WBS and OBS. As a result, it was identify that the standardization and linkage of WBS and OBS should be secured so that the construction manager (CMr) could apply it. Therefore, we extracted management control factors through expert in-depth interviews and workshops and conducted AHP importance analysis. Analysis results of importance shows that there is a high importance of strengthening the link between WBS and OBS and updating OBS due to changes in WBS. The results presented are not direct solutions, but are expected to provide a standard for construction managers to consider.