1 |
Choi, B.J., Cui, Xian, Choi, S.W., and Kim, O.K. (2008). "The Improvement Plan of Organization Management Through the Survey of Actual Condition in Construction Work." Journal of the Korea Institute of Building Construction, 8(2), pp. 121-129.
DOI
|
2 |
Yoon, C.J., and Jang, S.Y. (2014). "Management of research and development project of applying the WBS." The Korean Society for Railway Conference, 2014(10), pp. 427-433.
|
3 |
Kim, D.H., and Kim, J.J. (1996). "A Work Breakdown Structure - based Process Model for Construction Planning and Scheduling." Architectural Institute of Korea Spring Conference, 16(1), pp. 429-446.
|
4 |
Lee, D.H., Kim, S.K., Kim, M.K., and Shin, D.H. (2010). "An Analysis of Managerial and Organizational Status of Korean Construction Firms." Korean Journal of Construction Engineering and Management, KICEM, 11(1), pp. 38-48.
DOI
|
5 |
Supriadi, L.S.R., Wisesatama, B., and Latief, Y. (2018). "Development of work breakdown structure (WBS) dictionary for road construction works." IOP Conference Series Earth and Environmental Science, 195(1), pp. 1-7.
|
6 |
Said Abujudeh (2018). "Improving the Work Breakdown Structure of the Plant Installation - Case: Asphalt Plant." International Journal of Engineering and Management Sciences, 3(5), pp. 174-187.
DOI
|
7 |
Yang, J.K. (2014). "Potential Value Improvement Target Choice Methodology (PVTCM) in Construction Projects." Korean Journal of Construction Engineering and Management, KICEM, 15(4), pp. 11-19.
DOI
|
8 |
Ibrahim, Y.M. et al. (2007). "SEMI-AUTOMATIC DEVELOPMENT OF THE WORK BREAKDOWN STRUCTURE (WBS) FOR CONSTRUCTION PROJECTS." 4th International SCRI Research Symposium, Salford, pp. 133-145.
|
9 |
Yun, S.H., and Kim, S.S. (2005). "Using the common-WBS based on the Construction Classification System for the integration of Schedule and Cost information." Korean Journal of Construction Engineering and Management, KICEM, 6(6), pp. 107-114.
|