• 제목/요약/키워드: Conceptual estimate

검색결과 96건 처리시간 0.032초

ESTIMATING COSTS DURING THE INITIAL STAGE OF CONCEPTUAL PLANNING FOR PUBLIC ROAD PROJECTS: CASE-BASED REASONING APPROACH

  • Seokjin Choi;Donghoon Yeo;Seung H. Han
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1183-1188
    • /
    • 2009
  • Estimating project costs during the early stage of conceptual planning is very important when deciding whether to approve the project and allocate an appropriate budget. However, due to greater uncertainties involved in a project, it is challenging to estimate costs during this initial stage within a reasonable tolerance. This paper attempts to develop a cost-estimate model for public road projects under these circumstances and limitations. In the conceptual planning stage of a road project, there is only limited information for cost estimation, for example, such input data as total length of the route, origin and destination, number of lanes, general geographic characteristics of the route, and other basic attributes. This implies that the model should individuate suitable but restricted information without considering detailed features such as quantity of earthwork and a detailed route of a given condition. With these limited facts, this paper applies a case-based reasoning (CBR) method to solve a new problem by deriving similar past problems, which in turn is used to estimate the cost of a given project based on best-fitted previous cases. To develop a CBR cost-estimate model, the authors classified 8 representative variables, including project type, the number of lanes, total length, road design grades, etc. Then, we developed the CBR model, primarily by using 180 actual cases of public road projects, procured over the last decade. With the CBR model, it was found that the degree of error in estimation can be reasonably reduced, to below approximately 30% compared to the final costs estimated upon the completion of detailed design.

  • PDF

플랜트 건설 프로젝트를 위한 개산견적 방법론 개발 (Development of a Conceptual Estimate Methodology for Plant Construction Projects)

  • 김현중;최재현
    • 한국건설관리학회논문집
    • /
    • 제20권1호
    • /
    • pp.141-150
    • /
    • 2019
  • 해외 플랜트 건설시장에서 국내기업의 기술적 위상은 크게 향상되었으나 기술적 측면에 비해 프로젝트 관리 측면의 역량은 미비한 수준으로 평가되고 있다. 프로젝트 관리 중 프로젝트 수행 초기인 기획단계에서의 사업관리 역량은 선진 건설 기업의 핵심 역량으로 볼 수 있으며, 그 중 초기 원가산정 기술은 국내 기업의 역량 향상이 시급하다. 본 연구에서는 플랜트 프로젝트 기획단계에서 진행되는 개산견적 방법론에 대해 조사 및 분석하고, 사례분석을 통해 개산견적 방법을 제시하였다. 기존의 개산견적 방법론 중 비용지수법과 변수견적법의 로직을 토대로 플랜트 프로젝트에 특화된 입출력 변수를 도출하여 개산견적 도구를 개발하였다. 제시된 방법론의 유효성은 사례 프로젝트의 개산견적 금액과 실적 프로젝트 금액 간의 정확도 비교를 통해 평가하였다. 개발된 플랜트 개산견적 방법론의 활용성 증대를 위해 실적 프로젝트의 체계적인 데이터화가 필수적이다. 향후 프로젝트 원가산정의 정확성을 높이는 것은 기업의 프로젝트 수주 및 수익확보와 직결되므로, 개발된 도구의 적극적 활용이 기대된다.

위성 시스템 개념설계 소프트웨어 개발 (Development of Satellite Conceptual Design Software)

  • 박우성;윤중섭;유창경;최기영;김희섭
    • 한국항공우주학회지
    • /
    • 제37권9호
    • /
    • pp.923-930
    • /
    • 2009
  • 본 논문에서는 위성의 개념설계와 교육목적에 활용할 수 있는 위성 시스템 개념설계 소프트웨어 개발에 관한 내용을 담고 있다. 이 소프트웨어는 상용도구인 MATLAB, STK, Excel을 이용하여 구성되었다. MATLAB은 기본연산, GUI 구성, 엑셀 데이터베이스 관리 및 STK의 제어를 담당한다. AGI사에서 개발한 궤도 시뮬레이션 소프트웨어인 STK는 위성의 정밀 궤도정보의 산출을 담당한다. 마이크로소프사의 엑셀은 기존 위성들의 데이터 베이스 와 본 개념설계 소프트웨어의 임시적 및 최종 결과의 저장장소로 사용된다. 위성의 개념설계는 위성의 대략적인 전력시스템과 질량계를 추정하는 것이다. 전력시스템 설계과정에서는 태양전지판과 배터리의 크기를 결정한다. 기존 위성들의 데이터베이스를 기반으로 목표 위성의 부시스템의 질량 분할을 추정할 수 있다. 개발된 소프트웨어의 입증을 위해 아리랑 1호 및 2호에 대한 개념설계결과를 포함하였다.

RC라멘교의 기본설계단계 개략공사비 산정모델 (The Conceptual Cost Estimate Model on Preliminary Design Phase for RC Rahmen Bridge)

  • 김병수;권석현
    • 한국건설관리학회논문집
    • /
    • 제10권2호
    • /
    • pp.111-120
    • /
    • 2009
  • 건설공사에 소요되는 공사비의 개략적인 산정은 건설프로젝트의 계획단계뿐만 아니라 기본설계단계에서 예산을 확정하기 위해서 필수적이다. 현재 국내의 개략공사비 산정모델은 단위길이당 단가 또는 단위면적당의 단가를 이용하여 계산하는 선형적인 단순 모델로써 오차율이 너무 큰 문제점이 있다. 본 연구에서는 과다한 오차율의 문제를 해결하기 위하여 RC라멘교의 특성을 고려하였으며 공사비의 변동특성에 따라 그룹핑(Grouping) 및 대표물량방식 그리고 합성단가를 사용한 모델을 개발하였다. 본 연구의 결과 실제 설계공사비와의 오차를 상당히 줄일 수 있었으며 따라서 발주처나 용역업체에서 RC라멘교의 예산을 산정하는데 기여할 것으로 기대한다.

건축프로젝트 개산견적 신뢰도 향상 방안 (Development of Reliability for Conceptual Cost Estimates in Construction Projects)

  • 안성훈;강경인
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.175-180
    • /
    • 2006
  • 건축 프로젝트의 초기단계에서 실시하는 개산견적의 결과값인 예측된 공사비(개산견적 공사비)는 실제 시공한 후 정산한 공사비(실 공사비)와 차이가 발생할 수밖에 없는 리스크가 존재한다. 따라서 개산견적 공사비를 실 공사비와 비교했을 때 얼마나 정확하며 얼마나 신뢰할 수 있는지 평가하고, 개산견적의 신뢰도를 향상시킬 수 있으면 매우 유용하다. 본 연구는 건축 프로젝트 초기단계에서 실시하는 개산견적의 신뢰도를 견적전문가들의 지식을 활용하여 평가하고 이를 바탕으로 신뢰도 향상을 위한 대안을 제시할 수 있는 방안을 제안하고자 한다. 본 연구를 수행하기 위하여 실제 개산견적을 수행하고 공사를 실시한 83개의 건설 프로젝트 자료를 수집하였다. 본 연구에서 개발한 개산견적의 신뢰도를 평가하는 모델을 이용하게 되면 발주자 또는 의사결정자는 개산견적 공사비가 얼마나 신뢰할 수 있는 파악할 수 있게 된다. 또한 평가에 대한 검토와 피드백이 가능하여 개산견적 신뢰도 향상을 위한 방안을 모색할 수 있게 된다. 이러한 과정을 통해서 개산견적의 신뢰도에 좋지 않는 영향을 주는 요인의 상황(현황)윤 찾아내어 신뢰도 평가가 높게 되도록 상황을 개선시켜 다시 견적하면 개산견적의 신뢰도를 높일 수 있게 된다.

  • PDF

A study on the estimation of temperature distribution around gas storage cavern

  • Lee Yang;Moon Hyun-Koo
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 한국지구물리탐사학회 2003년도 Proceedings of the international symposium on the fusion technology
    • /
    • pp.238-243
    • /
    • 2003
  • As there are many advantages on underground caverns, such as safety and operation, they can also be used for gas storage purpose. When liquefied gas is stored underground, the cryogenic temperature of the gas will affect the stability of the storage cavern. In order to store the liquefied gas successfully, it is essential to estimate the exact temperature distribution of the rock mass around the cavern. In this study, an analytic solution and a conceptual model that can estimate three-dimensional temperature distribution around the storage cavern are suggested. When calculating the heat transfer within a solid, it is likely to consider the solid as the intersection of two or more infinite or semi-infinite geometries. Therefore heat transfer solution for the solid is expressed by the product of the dimensionless temperatures of the geometries, which are used to form the combined solid. Based on the multi-dimensional transient heat transfer theory, the analytic solution is successfully derived by assuming the cavern shape to be of simplified geometry. Also, a conceptual model is developed by using the analytic solution of this study. By performing numerical experiments of this multi-dimensional model, the temperature distribution of the analytic solution is compared with that of numerical analysis and theoretical solutions.

  • PDF

AN INTEGRATED APPROACH TO RISK-BASED POST-CLOSURE SAFETY EVALUATION OF COMPLEX RADIATION EXPOSURE SITUATIONS IN RADIOACTIVE WASTE DISPOSAL

  • Seo, Eun-Jin;Jeong, Chan-Woo;Sato, Seichi
    • Journal of Radiation Protection and Research
    • /
    • 제35권1호
    • /
    • pp.6-11
    • /
    • 2010
  • Embodying the safety of radioactive waste disposal requires the relevant safety criteria and the corresponding stylized methods to demonstrate its compliance with the criteria. This paper proposes a conceptual model of risk-based safety evaluation for integrating complex potential radiation exposure situations in radioactive waste disposal. For demonstrating compliance with a risk constraint, the approach deals with important exposure scenarios from the viewpoint of the receptor to estimate the resulting risk. For respective exposure situations, it considers the occurrence probabilities of the relevant exposure scenarios as their probability of giving rise to doses to estimate the total risk to a representative person by aggregating the respective risks. In this model, an exposure scenario is simply constructed with three components:radionuclide release, radionuclide migration and environment contamination, and interaction between the contaminated media and the receptor. A set of exposure scenarios and the representative person are established from reasonable combinations of the components, based on a balance of their occurrence probabilities and the consequences. In addition, the probability of an exposure scenario is estimated on the assumption that the initiating external factors influence release mechanisms and transport pathways, and its effect on the interaction between the environment and the receptor may be covered in terms of the representative person. This integrated approach enables a systematic risk assessment for complex exposure situations of radioactive waste disposal and facilitates the evaluation of compliance with risk constraints.

Parameter Impact Applied Case-based Reasoning Cost Estimation

  • Joseph Ahn;Hyun-Soo Lee;Moonseo Park;Sae-Hyun Ji;Sooyoung Kim
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.475-478
    • /
    • 2013
  • To carry out a one-off construction project successfully, effective and accurate early cost estimation is crucial, especially during the conceptual stage where very limited minimum information of construction project is given. As the level of accuracy of the early cost estimation has huge impacts on precise budgeting and cost management of a project, in other words, reducing the risk of a project, cost must be managed with special awareness. In an effort to improve the estimate accuracy of cost during the conceptual stage, this research introduces a Parameter Impact (PI) which can quantify weights of parameters and rank them; and PI development derived from the principle of impulse in physics is explicated. For a case study, 76 public apartment building cases in Korea are analyzed. To examine the validity of the proposed PI, a validation in terms of CBR applicability test and estimate accuracy comparisons using 10-nearest neighbor cases are carried out. The validation results support that the suggested PI can be applied in quantifying the weights of the parameters and CBR method for early cost estimation.

  • PDF

호우사례 분석을 위한 개념모델 구성에 위성영상과 위성자료의 활용 연구 (Application of Images and Data of Satellite to a Conceptual Model for Heavy Rainfall Analysis)

  • 이광재;허기영;서애숙;박종서;하경자
    • 대기
    • /
    • 제20권2호
    • /
    • pp.131-151
    • /
    • 2010
  • This study establishes a conceptual model to analyze heavy rainfall events in Korea using multi-functional transport satellite-1R satellite images. Three heavy rainfall episodes in two major synoptic types, such as synoptic low (SL) type and synoptic flow convergence (SC) type, are analyzed through a conceptual model procedure which proceeds on two steps: 1) conveyer belt model analysis to detect convective area, and 2) cloud top temperature analysis from black body temperature (TBB) data to distinguish convective cloud from stratiform cloud, and eventually estimate heavy rainfall area and intensity. Major synoptic patterns causing heavy rainfall are Changma, synoptic low approach, upper level low in the SL type, and upper level low, indirect effect of typhoon, convergence of tropical air in the SC type. The relationship between rainfall and TBBs in overall well resolved areas of heavy rainfall. The SC type tended to underestimate the intensity of heavy rainfall, but the analysis with the use of water vapor channel has improved the performance. The conceptual model improved a concrete utilization of images and data of satellite, as summarizing characteristics of major synoptic type causing heavy rainfall and composing an algorism to assess the area and intensity of heavy rainfall. The further assessment with various cases is required for the operational use.

공공건축물 계획단계에서의 용도별 공사비 예측에 관한 연구 - 육군 병영생활관을 대상으로 - (Cost Estimating for Public Facilities at Early Stage Using Functional Area Cost - Focusing on Army Barracks -)

  • 이현수;정명준;박문서;손보식
    • 한국건설관리학회논문집
    • /
    • 제11권6호
    • /
    • pp.3-13
    • /
    • 2010
  • 개산견적 모델은 예측의 정밀성뿐만 아니라 설계대안 변화에 대한 유연성, 사용자 중심의 효율성을 고려해야 한다. 본 연구에서는 이를 구현하기 위해 건축물을 구성하는 여러 포함시설을 건축양상에 맞게 주요 용도별로 분류하여 공사비 영향변수로 설정한 다음, 통계적 분석을 통해 용도별 시설단가 관계함수를 도출하여 공사비를 예측하는 용도별 분류에 의한 공사비 산정개념을 제안하였다. 그리고 대표적 군사시설인 육군 병영생활관을 대상으로 용도별 공사비 산정 개념을 모델화하고 신규사례를 대상으로 모델의 신뢰성을 검증하였다. 용도별 공사비는 견적의 정밀성을 향상시켰을 뿐만 아니라, 발주자 니즈(Needs)를 반영한 용도별 조합과 그 규모에 따른 맞춤형 공간을 계획할 수 있고 다양한 설계 대안에 대한 비용비교가 가능하다.