• Title/Summary/Keyword: Check Item

Search Result 153, Processing Time 0.023 seconds

A Study on the Marking Efficiency of Jacket & Slacks by CAD System - Focused on the Check-Pattern - (CAD 시스템 활용을 위한 여자 바지 정장의 Marking 효율 고찰 - 체크무늬 원단 마킹을 중심으로 -)

  • Hong, Eun-Hee;Ryu, Kyoung-Ok;Suh, Mi-A
    • The Research Journal of the Costume Culture
    • /
    • v.18 no.1
    • /
    • pp.13-28
    • /
    • 2010
  • This study is focused on the elucidation of efficient and correct marking methods by comparing and analyzing marker efficiency depending on the marking job condition such as interval of checking-pattern and marker orientation using woman's Jacket and Slacks. Research Method intended to compare the marking efficiency of Jacket and Slacks, check-less and check- patterned materials with the intervals of $1.5{\times}1.5cm$ and $5{\times}5cm$ were selected. First, in the comparison of marking efficiency depending on check-pattern interval, regardless of the direction of marker position, single-item makers and set-item makers, the efficiency of check-less materials was higher than those of check-patterned materials and increasing the intervals decreased marking efficiency and vice versa. Marking efficiency of Slacks was less influenced than marking efficiency of Jacket by check-pattern interval. Second, in the comparison of marking efficiency depending on the direction of marker position, regardless of check-pattern interval and number of maker pieces, the efficiency of nap-up-and-down position was higher than those of nap-one-way position. Third, the marking efficiency of single-item was more effective than one of set-item in all working condition except nap-one-way position in checkless materials.

A Method for Automatic Check of Omitted Design Item in Structural Calculation Document of Steel Box Bridges (강박스 교량을 대상으로 한 구조계산서의 누락된 설계항목 검토 자동화 방법론)

  • Park, Sang-Il;An, Hyun-Jung;Kim, Bong-Geun;Lee, Sang-Ho
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2007.04a
    • /
    • pp.813-818
    • /
    • 2007
  • A method for automatic check of omitted design item in structural calculation document of steel box bridges is proposed. A method for automatic check of omitted design item in structural calculation document of steel box bridges is proposed. Information processing for the proposed method is divided into two steps: automatic generation of document structure in XML Schema Definition (XSD) format and extract omitted design items by using the XML Schema matching technique. The automatic omitted element filter is developed on the basis of the proposed method, and the accuracy of the developed module is examined with case study subjected to existing structural calculation document samples.

  • PDF

On the Standardization of Management System for Improving Reliability in Construction Industry (건설 분야 신뢰성 향상을 위한 경영표준 운영 방안)

  • Kim Jong-Gurl;Park Yong-Soo
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2004.11a
    • /
    • pp.253-258
    • /
    • 2004
  • Domestic construction industry (including plant engineering industry) faces severe competition with world-wide leading companies under WTO (World Trade Organization) system. To survive in this competition, domestic construction company should establish and operate standardization system efficiently. In this paper, check list is presented to prepare the efficient reliability management system in domestic construction. And then, the check list is applied in MIR(Maturity Index on Reliability) estimation item to estimate reliability management level of company quantitatively.

  • PDF

A Study about physical awareness symptoms of workers working at Seoul driver-owned taxi workplace by THI and CMI (CMI와 THI에 의한 서울시내 개인택시 사업장에 근무하는 근로자의 신체적 자각증상에 관한 연구)

  • 손종렬;변상훈;김경은;최달웅
    • Journal of environmental and Sanitary engineering
    • /
    • v.18 no.4
    • /
    • pp.52-63
    • /
    • 2003
  • This paper investigated Taxi drivers physical subjective symptoms and what factors were interviewed caused the symptoms. The 600 owning taxi-drivers in Seoul during four months from August 1st, 2003 to November 30th, 2003. 1. The average age of the owning taxi-drivers was generally quite high 54 years old. It was very high index compared with the Todai Health Index(THI) and Cornell Medical Index(CMI) of health check tables. 2. According to the age in THI health check table, the complains of mental subjective symptom by reason of age was high among 31 to 40 years old. People who belonged that age group showed high fabrication(L), digestion(C) and aggressiveness(F). The results showed the complains of mental subjective symptom. All items except tiredness(I), melancholia(N), and hypersensitivity(P) were commonly reported by people in their sixties. On the other hand, melancholia(N) and hypersensitivity(P), people in their forties were investigated highly. Statistically, the items of heartㆍblood stream(C) and digestion(D) systems were similar between the two ages, but anger(Q) was different. (p<0.05) 3. From the complains of mental and physical subjective symptoms about work satisfaction on the THI health check table, all items except eyeㆍskin trouble(B) showed strong dissatisfaction. From the complains of mental and physical subjective symptoms about work satisfaction on the CMI health check table, the items of respiratory system(B), digestion(D), nervous system(G), miscellaneous(K), inadequancy(M), and anger(Q) showed similar results. Otherwise, heartㆍblood stream(C) showed statistically different. 4. From the complains of mental and physical subjective symptoms on salary satisfaction in the THI health check table, in the case of people receiving around 1 million won, the complains of physical symptoms showed high among all items except for the respiratory(A) and digestion(C) systems. The eyeㆍskin trouble(B) item showed statistical similarity. The complains of mental and physical subjective symptoms according to a salary degree on the CMI health check table was completely different from the above results. In people received around 1~1.5million won, all items except anxiety(O) showed high. The hypersensitivity(P) item showed statistically different.

An Study on the Impact of N/A Check Item on the Security Level Result through Empirical Verification (실증검증을 통한 N/A 점검항목이 보안 수준 결과에 미치는 영향에 관한 연구)

  • Lee, Jun Ho;Sung, Kyung Sang;Oh, Hea Seok
    • KIPS Transactions on Computer and Communication Systems
    • /
    • v.3 no.8
    • /
    • pp.271-276
    • /
    • 2014
  • This study analyzed that N/A check items affect the results of the security level degree, when performing vulnerability analysis evaluation. For this, we were used vulnerability analysis evaluation range, check items and quantitative calculation method. Furthermore, were applied grade and weight for the importance of the items. In addition, because technology develop rapidly, the institution is always exposed risk. therefore, this study was carried out empirical analysis by applying RAL(Risk Acceptabel Level). According to the analyzed result N/A check items factors affecting the level of security has been proven. In other words, this study found that we shall exclude inspection items irrelevant to the institution characteristics, when perform vulnerability analysis evaluation. In this study suggested that security level evaluation shall performed, after that exclude items irrelevant to the institution characteristics based on empirical verification. And also, it proposed that model research is required for establish check items for which analysis-evaluate vulnerability based on empirical verification.

Development of a Daliy Hassles Scale for School Age Children (학령기 아동의 일상적 생활 스트레스 척도 개발)

  • Min, Ha Young;Yoo, An Jin
    • Korean Journal of Child Studies
    • /
    • v.19 no.2
    • /
    • pp.77-96
    • /
    • 1998
  • The purpose of this study was the development of a scale to assess the daily hassles of school age children. The subjects were 398 third and sixth grade children selected from elementary schools in Seoul, Inchon, Taejon, Kwangju and Pusan. Instruments included a questionnaire composed of a 96-item Daily Hassles Coping Scale, demographic questions, a 27-item Children's Depression Inventory, the 42-item Han & Yoo Daily Hassles Scale for Children, and a 30-item Children's Behavior Check List for mothers. Mean, %, ${\chi}^2$, Cramer's V, Cronbach's ${\alpha}$, factor analysis and Pearson's r were used for data analysis. 82 items from the 96-item Daily Hassles Coping Scale were selected through the item discriminant method. (Cramer's V discriminant coefficients ranged from .36 to .79). Five factors were extracted from the lst and 2nd factor analyses. Subscales were "parent-related," "friend-related I," "study-related," "friend-related II," and "teacher-related" stress. Criterion validity of the 82-item scale was confirmed through significant correlations with the Children's Depression Inventory (r=.55) and the Han & Yoo Daily Hassles Scale for Children (r=.22). Internal consistency of this scale was high, including internal reliability of subscales. These results confirm this scale as a valid and reliable measure of daily hassles of school age children.

  • PDF

Study on Fire.Explosion Accidents Prediction Model Development of LPG Vaporizer (LPG 기화기의 화재.폭발사고 예측모델개발에 관한 연구)

  • Ko, Jae-Sun
    • Journal of the Korean Institute of Gas
    • /
    • v.14 no.1
    • /
    • pp.28-36
    • /
    • 2010
  • We have garnered 3,593 data of gas accidents reported for 12 years from 1995, and then analyzed the LPG vaporizer accidents according to their types and causes based on the classified database. According to the results the gas rupture has been the most common accident followed by the release, explosion and then fire accidents, the most frequent accident-occurring sub-cause is LPG check floater faults. In addition, we have applied the Poisson Probability Functions to predict the most-likely probabilities of fire, explosion, release and rupture with the LPG vaporizer in the upcoming 5 years. In compliance with Poisson Probability Functions results, in the item which occurs below 3 "LPG-Vaporizer-Fire", in the item which occurs below 5 "LPG-Vaporizer-Products Faults-Check Floater" and the item which occurs below 10 appeared with "LPG-Vaporizer-Products Faults". From this research we have assured the successive database updating will highly improve the anticipating probability accuracy and thus it will play a key role as a significant safety- securing guideline against the gas disasters.

Constructing a Performance Evaluation Model of an R&D Module in Quality Management System Using QFD (QFD를 이용한 품질경영 시스템의 개발모듈에 대한 이행도 평가모형)

  • 류문찬;우성권
    • Journal of Korean Society for Quality Management
    • /
    • v.30 no.2
    • /
    • pp.1-10
    • /
    • 2002
  • A performance evaluation model of an R&D module in the quality management system for M Company Is constructed using QFD. The company produces telecommunication devices and employs the performance evaluation model based on ISO 9000 family. However, the model has some problems, one of them is that all check items are regarded as equally important Customer requirements are gathered from internal customers and QFD is utilized to obtain weights for each check item.

A Study on the Risk Analysis of Construction Method (건축공법 내부 리스크 분석에 관한 연구)

  • 윤여완;양극영
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2002.11a
    • /
    • pp.117-121
    • /
    • 2002
  • The purpose of this study was to Identification the Risk of construction method to protect and reduce the risk of construction period. For this study we are using the pre and during construction period Inspection list. The inspection list was used by construction company for check a flaw of Construction field. So we rearrange the individual item of inspection list to match the Risk factor. This inspection list usually has the difference of importance because this list is not made by Method which is not focused on Method. Therefore, To find the difference of these importance, We surveyed this matter by doing interview of specialist group. To find the application of field and the possibility of measurement of Risk status, We tested Risk occurring frequency and it's strength by checking the level of Risk. The results of this study were as follows; Each Method Check List made out through the rearrangement of Construction Inspection list which used in construction company. To solve and compensate the matter which happened by changing the each Method Check List to each General Inspection List, we added the each Method Check List by checking the importance of check list of each process. By doing this, The Check List for finding Risk level of Method was created by using the check list of each Method.

  • PDF

A Study on the Risk Analysis of Construction Method (건축공법 내부 리스크 분석에 관한 연구)

  • Yoon, Yer-Wan;Yang, Keek-Young
    • Journal of the Korea Institute of Building Construction
    • /
    • v.2 no.4
    • /
    • pp.131-135
    • /
    • 2002
  • The purpose of this study was to Identification the Risk of construction method to protect and reduce the risk of construction period. For this study we are using the pre and during construction period Inspection list. The inspection list was used by construction company for check a flaw of Construction field. So we rearrange the individual item of inspection list to match the Risk factor. This inspection list usually has the difference of importance because this list is not made by Method which is not focused on Method. Therefore, To find the difference of these importance, We surveyed this matter by doing interview of specialist group. To find the application of field and the possibility of measurement of Risk status, We tested Risk occurring frequency and it's strength by checking the level of Risk. The results of this study were as follows; Each Method Check List made out through the rearrangement of Construction Inspection list which used in construction company. To solve and compensate the matter which happened by changing the each Method Check List to each General Inspection List, we added the each Method Check List by checking the importance of check list of each process. By doing this, The Check List for finding Risk level of Method was created by using the check list of each Method.