Abu Qahouq, Jaber A.;Jiang, Yuncong;Orabi, Mohamed
Journal of Power Electronics
/
v.14
no.6
/
pp.1281-1292
/
2014
Photovoltaic (PV) solar systems with series-connected module integrated converters (MICs) are receiving increased attention because of their ability to create high output voltage while performing local maximum power point tracking (MPPT) control for individual solar panels, which is a solution for partial shading effects in PV systems at panel level. To eliminate the partial shading effects in PV system more effectively, sub-MICs are utilized at the cell level or grouped cell level within a PV solar panel. This study presents the results of a series-output-connection MPPT (SOC-MPPT) controller for sub-MIC architecture using a single sensor at the output and a single digital MPPT controller (sub-MIC SOC-MPPT controller and architecture). The sub-MIC SOC-MPPT controller and architecture are investigated based on boost type sub-MICs. Experimental results under steady-state and transient conditions are presented to verify the performance of the controller and the effectiveness of the architecture.
Journal of the Korean Society for Precision Engineering
/
v.9
no.4
/
pp.36-43
/
1992
This paper presents a hierarchical real-time operation control and monitoring scheme of the FMS/CIM center which has been implemented at the Automation and Systems Research Institute of Seoul National University. The hierarchical structure of the whole scheme consists of three lavers. The upper layer is in charge of on-line scheduling, computer network control, shop-floor monitoring and command generation for AGV dispatching, machining, assembly, inspection, set-up, etc. The middle layer has six modules, which are installed in the FMS host computer with the upper layer and run on the multi-tasking basis. Each module is connected to one of six cell controllers distributed in the FMS model plant and transfers operation command down to each cell controller through the Ethernet/TCP-IP local area network. The lower layer is comprised of six cell control software modules for machining cell, assembly cell, inspection cell, set-up stations. AS/RS and AGV. Each cell controller reports the status of the manufacturing facilites to the middle layer as well as ecxecuting the appropriate sequence control of the manufacturing processes.
Journal of the Korean Society for Precision Engineering
/
v.12
no.4
/
pp.88-99
/
1995
The demand for automatic manufacturing systems is increasing. Flexible Manufacturing System(FMS) is usually considered as a soluting for the shop floor automation. One of the difficulties in FMS is the communications problem. Since various machineries with different communications protocoles are included, applying a unified scheme is almost impossible. Therefore, a systematic approach is a key point to solve the communication problem. A cell is difined as an automation unit where closely related for a job reside together. A cell is a messenger between upper level computers and lower level machine equipment. In this research, the fonctions of the cell are defined to have more capabilities than conventional cells since a cell can be often a total manufacturing system is a small to medium sized factory. The cell conducts communications with different machines through the communications schemes established here. A set of software system has been developed according to the defined communication. The software has been tested for a simulation and real experiments for proof.
The Journal of Korean Institute of Communications and Information Sciences
/
v.27
no.11C
/
pp.1164-1170
/
2002
In the ACE2000 MPLS system, MPLS Interface Module(MIM) is composed of an ATM Interface Module and a HFMA performing a packet forwarding. In the MIM, the HFMA RSAR receive cells from the Physical layer and reassemble the cells. And the IP Lookup controller perform a packet forwarding after packet classification. Forwarded packet is segmented into cells in the HFMA TSAR and transfer to the ALMA for the transmission to an ATM cell switch. When the MIM make use of an ATM Interface Module, it directly connect the ALMA with a PHY layer using the UTOPIA Level2 interface. Then, an ALMA performs Master Mode. Also, the HFMA TSAR performs the Master Mode in the MIM. Therefore, the UTOPIA-L2 Controller of the Slave Mode require for interfacing between an ALMA and a HFHA TSAR. In this paper, we implement the architecture and cell control mechanism for the UTOPIA-L2 Controller supporting Multi-ports.
The H-bridge inverter is the fundamental power cell of the cascaded distribution static synchronous compensator (DSTATCOM). Thus, cell reliability is important to the compensation performance and stability of the overall system. The concept of the power electronics building block (PEBB) is an ideal solution for the power cell design. In this paper, an H-bridge inverter-based “plug and play” HPEBB is introduced into the main circuit and the controller to improve the compensation performance and reliability of the device. The section that discusses the main circuit primarily emphasizes the design of electrical parameters, physical structure, and thermal dissipation. The section that presents the controller part focuses on the principle of complex programmable logic device -based universal controller This section also analyzes typical reliability and anti-interference issues. The function and reliability of HPEBB are verified by experiments that are conducted on an HPEBB test-bed and on a 10 kV/± 10 Mvar DSTATCOM industrial prototype.
Journal of the Korean Institute of Electrical and Electronic Material Engineers
/
v.19
no.12
/
pp.1149-1153
/
2006
We developed the equipment palpating cell proliferation using a high brightness LED. This equipment was fabricated using a micro-controller and a high brightness LED, and designed to enable us to control light irradiation time, intensity, frequency and so on. Especially, to control the light irradiation frequency, FPGA was used, and to control the change of output value, TLC5941 was used. Control stage is divided into 30 levels by program. Consequently, the current value could be controlled by the change of level in Continue Wave(CW) and Pulse Width Modulation(PWM), and the output of a high brightness LED could be controlled stage by stage.
Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
/
1998.11a
/
pp.166-169
/
1998
This paper represent about design of the controller for battery of fence with traffic controller for battery of fence with traffic auxiliary system for power supply using solar cell. Simulation is represents V-I and power characteristic by Pspice. This system is successfully operating with high clearness lights.
JSTS:Journal of Semiconductor Technology and Science
/
v.13
no.1
/
pp.65-70
/
2013
A 0.18-${\mu}m$ 3.3 V grounded-gate NMOS (GGNMOS) I/O cell array for timing controller (TCON) application is proposed for improving electrical overstress (EOS) robustness. The improved cell array consists of 20 GGNMOS, 4 inserted well taps, 2 end-well taps and shallow trench isolation (STI). Technology computer-aided design (TCAD) simulation results show that the inserted well taps and extended drain contact gate spacing (DCGS) is effective in preventing EOS failure, e.g. local burnout. Thermodynamic models for device simulation enable us to obtain lattice temperature distributions inside the cells. The peak value of the maximum lattice temperature in the improved GGNMOS cell array is lower than that in a conventional GGNMOS cell array. The inserted well taps also improve the uniformity of turn-on of GGNMOS cells. EOS test results show the validity of the simulation results on improvement of EOS robustness of the new GGNMOS I/O cell array.
In the design of the fuel cell charger, it is important to find out the suitable topology and to design the converter to guarantee the performance of the fuel cell as well as the battery. Most of the chargers developed so far have used step-down converters. However, since the small fuel cell stack can only generate a low voltage, it is required to use the step-up converter to charge the battery. In this paper, a modified non-isolated boost charger topology for the Proton Exchange Membrane Fuel Cell (PEMFC) is proposed to meet the strict ripple requirements for the battery charge and its control method by using PI controller is detailed. The feasibility of the proposed topology and its control method is then verified by the experiments.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.