• Title/Summary/Keyword: Catenary-Current Collection

Search Result 89, Processing Time 0.033 seconds

Reliability Analysis of Arcing Measurement System Between Pantograph and Contact Wire (팬터그래프-전차선간 아크 검측 장치의 신뢰성 분석)

  • Park, Young;Kwon, Sam-Young;Kim, Jae-Moon
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.61 no.8
    • /
    • pp.1216-1220
    • /
    • 2012
  • The current collection between pantograph and contact wire is a more critical component for need to train speed up in electric railway. The basic purpose of this paper is to establish a measure of determining arc by developing an arc detector assessment system. The system was designed under conditions of EN 50317 and simulations were conducted using the developed device. According to the results, it was possible to conduct certification tests following regulations of international standards. To check the validity of our approach for the intended application, we analysis contact loss of catenary system using developed arcing measurement system in Korea. The proposed arcing measurement system is expected to enhance precision of current collection quality performance assessment methods at high-speed lines and conventional lines.

전기철도 집전상태 실시간 데이터 획득기술 분석

  • O, Seok-Yong;Park, Yeong;Song, Jun-Tae;Kim, Hyeong-Cheol
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2009.11a
    • /
    • pp.222-222
    • /
    • 2009
  • Currently in electric railways, there are various test standards for catenary systems such as stability assessment standards and maintenance standards for appropriate vehicle operation. In Korea, maintenance vehicles are used to measure height, stagger, and wear of catenaries and various tests are being conducted based on maintenance manuals. In this paper, real-time data aquisition technologies for assessment of electric railway current collection status between catenaries and pantographs that are consistantely being developed from the adoption of electric railways were analyzed based on on-board measurement items.

  • PDF

Development of Load Cell to Measure Contact Force of Pantograph (판토그라프 접촉력 측정을 위한 스트레인 게이지 내장형 센서 개발)

  • Park, Chan-Kyoung;Paik, Jin-Sung;Kim, Young-Guk;Kim, Ki-Hwan
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.947-953
    • /
    • 2010
  • The KTX-Sancheon has been commercially operating on the high-speed line since March. 2. In order to verify the performance of high-speed train and core equipments such as current collection system, sophisticated tests and evaluating procedures should have been considering. In this paper, the load cell with a built-in strain-gauge which developed to improve measuring method of contact force between the pantograph and catenary system is introduced. The static test results of the load cell shows that its design is very suitable and applicable for the dynamic test and on-line test. After the test and evaluation of load cell's dynamic calibration with pantograph, we will be applied to test interaction characteristics between the pantograph and catenary system on the high-speed line.

  • PDF

Analysis of contact force of pantograph for Korean-high speed train according to track conditions and driving patterns (선로조건 및 운전패턴에 따른 한국형 고속열차 판토그라프의 접촉력 특성 분석)

  • Mok, Jin-Yong;Kim, Young-Guk;Lee, Hi-Sung
    • Journal of Sensor Science and Technology
    • /
    • v.14 no.6
    • /
    • pp.438-443
    • /
    • 2005
  • In this paper, we introduce the on-line test of the current collection characteristics for HSR 350x(Korea High Speed Train project) that have been performed in the Kyoung-bu high-speed line since 2002. Through the analysis of measured data during on-line test, the variation trends of contact force between pantograph and catenary according to the track conditions and driving patterns are reviewed. This study shows that the track conditions do not affect on the dynamic performance between pantograph and the driving patterns are important factors in determining the good interaction of them.

A Study on Performance of TGV-K Current Collection System for the Speed-up (속도 향상을 위한 고속전철 TGV-K 집전시스템의 성능에 관한 연구)

  • Hur, S.;Kyung, J.H.;Han, H.S.;Song, D.H.
    • Proceedings of the KSR Conference
    • /
    • 1998.05a
    • /
    • pp.533-539
    • /
    • 1998
  • Described in this paper are the dynamic model and the dynamic performance of catenary-pantograph system for TGV-K(maximum operating speed of 300km/hr). Dynamic simulations showed that the system satisfies the performance criteria such as contact loss ratio, contact force and lift-off of the contact wire. It is also shown by the simulations that the dynamic behavior and contact performance of the system at the operating speed of 350km/hr are found unacceptable. Design parameters of the catenary-pantograph system should be optimized for the speed-up of the TGV-K.

  • PDF

The analysis of the dynamic response between the pantograph and overhead wire (고속열차 주행을 위한 판토그래프와 가선시스템과의 동적응답 해석)

  • Shin Seung-Kwon;Song Yong-Soo;Mun Hyung-Scok;Eum Ki-Young;Kim Jae-Mun
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.1366-1371
    • /
    • 2004
  • The development of the European railway high speed network brings new problems related to the interoperability across the railways of different countries. The pantograph and the overhead wire form a dynamic coupled system and they affect each other through the contact force. Unfortunately, as the operational speed of a train increases, the vibration of the pantograph and the overhead wire also increases. This may lead to a zero contact force between the pantograph head and the overhead wire, which can results in the loss of contact, arching and abrasion. If the arching and spark happen between the pantograph and the overhead catenary system, the EMI(electro magnetic interface) and noises may occur. After an, the quality of current collection is deteriorated. This paper describes the dynamic response between the pantograph and catenary system by the numerical simulations and predicts the possibility of operating the high speed train in the conventional lines.

  • PDF

Study on the current collection & vibration characteristics of the KHST's pantograph through trial running test up to 350km/h (한국형 고속열차의 350km/h 본선 주행시험을 통해 본 고속열차용 팬터그래프의 이선 특성과 동적 특성 고찰)

  • Mok, Jin-Yong;Park, Chan-Kyoung;Park, Choon-Soo;Kim, Ki-Hwan
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2005.05a
    • /
    • pp.459-462
    • /
    • 2005
  • The KHST(Korean High Speed Train) which had been developed by through 'G7-R&D project' has succeeded trial running test up to 350km/h on the Kyoung-Bu High Speed Track in December 16th, 2004. In order to evaluate the function and characteristics of KHST, various experimental conditions have been considered and conducted. In this paper, measured current collection characteristics and dynamic behaviors of KHST's pantograph are analysed over 300 to 350km/h in running speed of KHST. A measuring system developed and installed on the KHST for measuring the performance and mechanical characteristics of the KHST's pantograph was used for this trial running test and eventually, we proofed that KHST has a remarkable and stable current collection characteristics as it had been designed.

  • PDF

A Study on the Evaluation of Dynamic Characteristics of the Pantograph for the Korean High-Speed Train through 350km/h Trial Running Test (350km/h 본선 주행시험을 통한 한국형 고속열차 판토그라프의 접촉력 특성 평가 연구)

  • Lee Hi-Sung;Mok Jin-Yong
    • Journal of the Korean Society for Railway
    • /
    • v.8 no.4
    • /
    • pp.342-347
    • /
    • 2005
  • The Korean High-Speed Train(HSR 350x) had been developed by through 'G7-R&D project' in 1996-2002, and has been testing and evaluating it's reliability on the high-speed line until now. A number of core equipments designed and developed by using domestic technologies were boarded on the HSR 350x. In order to verify the performance of HSR 350x and core equipments such as traction system, brake system and pantograph, sophisticated testing and evaluating procedures should be considered and applied. In this paper, the tested and analysed results about the dynamic characteristics of HSR 350x pantograph are introduced in a view point of the mean contact force and it's variation trend, criterion of current collection, and up-lifting of contact wire when the MSR 350x running up to 350 km/h. Through the test and evaluation, we verified that HSR 350x pantograph had an excellent current collection performance and good dynamic characteristics as it had been designed.

A Verification of the Contact Dynamics of the Current Collection System on a Test Run (실차실험에 의한 집전계의 접촉 동특성 규명)

  • Kim, Jung-Soo
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.4
    • /
    • pp.414-419
    • /
    • 2007
  • The contact characteristics of the current collection system are investigated by analyzing data collected during a test run of the Korean high speed rail vehicle. For the analysis, the signals from accelerometers and load cells attached to the various parts of the pantograph are analyzed in both the time and frequency domains. In the frequency domain, the pantograph response consists of low frequency components related to the rigid-body motion of the panhead assembly and high frequency components due to the structural vibration modes of the pantograph. The analysis shows that the inclusion of the high frequency structural vibration modes of the pantograph in the contact force calculation has a negligible effect on the predicted mean value of the contact force but significantly affects the magnitude of its fluctuations. This finding implies that numerical simulations using lumped element models of the pantograph may accurately predict the mean contact force but is limited in its capacity for predicting the fluctuation about the mean. Since the ratio of the fluctuation to the mean in the contact force increases with increased train speed, the limitation of the predictions based on numerical simulation results becomes more pronounced at higher train speed.

Active Control of a High-Speed Pantograph using LQ-Servo Controller

  • Shin, Seung-Kwon;Song, Young-Soo;Eum, Ki-Young;Koo, Dong-Hoe
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2004.08a
    • /
    • pp.1173-1177
    • /
    • 2004
  • The high investment is necessary for the new high speed lines. So the KRRI was interested in the possibility of upgrading the existing line in order to speed up the train in the conventional lines. The tilting train system has been developed because the reconstruction of railway for the cant compensation costs very high. The purpose of the tilting system is to compensate the centrifugal acceleration in order to reduce the lateral acceleration of the passenger at high speed on the curves.The pantograph of the tilting train is indispensable in order to supply the electrification equipments with power in safe. The dynamic interaction between the pantograph and the overhead catenary system causes the variation of the contact force and the contact force variation can cause contact losses, arcing and sparking. If the spark happens between the pantograph and the overhead catenary system, the EMI(electro magnetic interface) and noises may occur. After all, the quality of current collection is deteriorated. This paper deals with the active control of pantograph and presents the LQ-servo controller to reduce the contact force variation.

  • PDF