• Title/Summary/Keyword: Catenary system

Search Result 410, Processing Time 0.03 seconds

The analysis of the dynamic response between the pantograph and overhead wire (고속열차 주행을 위한 판토그래프와 가선시스템과의 동적응답 해석)

  • Shin Seung-Kwon;Song Yong-Soo;Mun Hyung-Scok;Eum Ki-Young;Kim Jae-Mun
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.1366-1371
    • /
    • 2004
  • The development of the European railway high speed network brings new problems related to the interoperability across the railways of different countries. The pantograph and the overhead wire form a dynamic coupled system and they affect each other through the contact force. Unfortunately, as the operational speed of a train increases, the vibration of the pantograph and the overhead wire also increases. This may lead to a zero contact force between the pantograph head and the overhead wire, which can results in the loss of contact, arching and abrasion. If the arching and spark happen between the pantograph and the overhead catenary system, the EMI(electro magnetic interface) and noises may occur. After an, the quality of current collection is deteriorated. This paper describes the dynamic response between the pantograph and catenary system by the numerical simulations and predicts the possibility of operating the high speed train in the conventional lines.

  • PDF

Modeling and Simulation Reactive Power Compensator using Multi-port Network Algorithm in Electrified Railway (다단자망 알고리즘을 이용한 급전시스템의 무효전력 보상 모델링 및 시뮬레이션)

  • Kim, Joorak
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.65 no.5
    • /
    • pp.883-887
    • /
    • 2016
  • The power supply system in Korean electrified railway has adopted AT feeding. If a fault occurs in some substation for any reason, the vicinity substation must feed electric power on the outage substation through catenary. So, the feeding distance grows twice of the normal state at extended feeding condition. If substation's feeding distance is longer than normal condition, the catenary impedance and train to supply electric power from the substation. Therefore, the severe voltage drop can occur and power supply shall be not allowed. This paper presents the model of compensator against voltage drop using multi-port network algorithm. Whole traction power supply system can be analyzed with this model. Computer simulation including this model is performed based on real train schedule and increased schedule in case studies.

Development of Force Sensor to Measure Contact Force of Pantograph for High-Speed Train (고속철도용 판토그라프 접촉력 측정을 위한 스트레인 게이지 내장형 하중센서 개발)

  • Park, Chan-Kyoung;Kim, Young-Guk;Cho, Yong-Hyeon;Paik, Jin-Sung
    • Journal of the Korean Society for Railway
    • /
    • v.13 no.5
    • /
    • pp.488-492
    • /
    • 2010
  • In order to verify the performance of high-speed train and core equipments such as current collection system, sophisticated tests and evaluating procedures must be considered. In case of force sensor to test contact force of pantograph, it should customize the test instruments according to characteristics of pantograph. In this paper, the force sensor with a built-in strain-gauge which developed to improve measuring performance of contact force between the pantograph and catenary system is introduced. The test and evaluation results of force sensor's static and dynamic calibration with pantograph shows that its design is very suitable and applicable for on-line test. Henceforth, the force sensor will be applied to test interaction characteristics between the pantograph and catenary system on the high-speed line and expected by a part of measuring system for evaluating current collecting characteristics more reliably.

Technique of Tension Length Calculation for 350km/h High Speed Catenary System (최고운행속도 350km/h급 전차선로 장력구간길이 계산 기법)

  • Chang, Sang-Hoon;Lee, Ki-Won;Kwon, Sam-Young;Park, Jae-Woong
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.932-939
    • /
    • 2011
  • This paper deal with technique of tension length calculation for 350km/h high speed catenary system. Tension length affects in facility investment. Possibility of overlap increasing a tension length and the equipment investor decreases in order to decrease. Considers the parameter which specifies and the grudge which is possible long the fact that decides a tension length is the aim which is important plans overhead contact line. The element which decides a tension length with next following; (i) Operating range of tension device, (ii) Change of the horizontal tension which affects possibility of the effect which operates to the line and span, (iii) Tension of wire material the tensile force which is relation, (iv) Wire thermal expantion which relates with a standard temperature, (v) Curve radius, (vi) Wind velocity, (vii) Thermal range of overhead contact wire and mechanical design of tension mechanism etc.

  • PDF

Study on Commercial speed up and Catenary System in Gyeongbu High Speed Line (경부고속철도 운행구간의 전차선로와 표정속도 향상에 대한 연구)

  • Ahn, Young-Hoon;Choi, Jong-Bok;Park, Hyung-Woong
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2306-2309
    • /
    • 2011
  • With the opening of 1st phase and 2nd phase in Gyeongbu High Speed Line, KTX(The Korea Train Express) and Sancheon(2nd generation of High Speed Train) are operating commercially on entire line. Gyeongbu High Speed Line can be separated as several sections. In this entire line, a few types of train has operating by it's own pattern. However, commercial speed of the line compared with the maximum speed of Train is rather slow. Through this study, I found the reason of the slow speed on the Catenary system and suggested a solution.

  • PDF

Static Tension Analysis Method for Floating Tire Breakwater (부 타이어 소파제의 정적 장력 해석 방법)

  • YOON Gil-Su;CHU Weon-Hyo
    • Korean Journal of Fisheries and Aquatic Sciences
    • /
    • v.26 no.1
    • /
    • pp.31-40
    • /
    • 1993
  • This paper deals with static tension analysis method for Floating Tire Breakwater(FTB). FTB can be used for the limited wave height. It is especially focused on Goodyear type FTB easily applied to the breakwater for the fisheries cultivating region. The numerical examples for FTB design procedure was reviewed. It is also studied the static analysis method of offshore catenary spread mooring system. The general calculation procedure for the tension versus excursion curves for the multi-line system using the basic catenary relationship was studied. Calculation results showed good agreement with some existing mooring results. To extend this mooring force calculating method to the floating fisheries caitivating cages, the strength of synthetic fiber was considered. This analysis method can be used to the estimation of the mooring force for the floating structures such as floating breakwaters and floating artificial reefs.

  • PDF

An Analysis of the Spring Type Automatic Tensioning Device Outworn Change (스프링식자동장력조정장치 노후변화 분석)

  • Oh, Wan-Shik;Seo, Ki-Bum
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.65 no.1
    • /
    • pp.214-218
    • /
    • 2016
  • Catenary maintains the tension of the catenary using automatic tensioning devices to meet performance require m ents exhibited by the house is generated in accordance with the new external temperature changes. Double spring type autom a tic tensioning device is permanent and does not require the usual maintenance, and a deterioration due to no recognizable ab normalities characteristic of the nature of the internal state has the disadvantage that can not be confirmed. The disassembled for automatic spring-tension capabilities ensure efficient operation and life expectancy of the adjustment device via a check by analyzing the changes in old age determine the remaining lifetime is expected to be available as a basis for maintenance in the future.

Analysis of Breaking Accident of FRP Insulator Rod installed in Dead Section (절연구간 조가선 FRP 절연봉의 절단사고 원인분석)

  • Jang, Don-Guk;Lee, Ki-Won;Kim, Ju-Rak;Park, Hyun-June
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2003.07a
    • /
    • pp.502-505
    • /
    • 2003
  • The accidnet of breaking insulator rod leads to inturruption of moving the subway. We investigate the analysis of analysis of breaking accident of FRP insulator rod installed in dead section for catenary feeding system. To analysis of accident reason, SEM is used to analysis microscopic struture on surface of cross section of broken FRP insulator rod. At the same time, we examine the chage of atomic amount on solace of accident insulator through EDX analysis. Also, the test for tensional breaking load is condoled to check the mechanical strength.

  • PDF

A Study on Estimating Line Constants Using the 5-Conductors Equivalent Model (5도체군 등가모델을 이용한 선로정수 예측에 관한 연구)

  • Lee, H.M.;Oh, K.H.;Lee, C.M.;Chang, S.H.
    • Proceedings of the KIEE Conference
    • /
    • 2001.04a
    • /
    • pp.443-445
    • /
    • 2001
  • This paper describes an estimate of line constants using the five-conductors equivalent model. Actually, a catenary system is composed of the five-conductors equivalent model. Therefore, we made up the five conductors equivalent model of a catenary system by applying a method of inverse matrix. Finally, we estimated line constants using the five-conductors equivalent model. To verify the results, we compared estimated line constants with measured those.

  • PDF

Feasibility study through simulation of LSM propulsion system for the catenary-current collection run tester (전차선로-집전계 주행시험기의 LSM 추진장치의 타당성 검토 시뮬레이션)

  • Kwon, Sam-Young;Lee, Hyeung-Woo;Park, Hyun-June;Lee, Ju
    • Proceedings of the KIEE Conference
    • /
    • 2006.07b
    • /
    • pp.1101-1102
    • /
    • 2006
  • In this paper, as a conceptual design of the catenary-current collection run tester which is planning to be constructed by KRRI, the feasibility study is described. In this study, reviews to determine the propulsion linear motor rating based on the target distance-speed curve through various simulation of LSM propulsion system were conducted. Moreover, the reviews of simulation results and desirable linear motor specifications are discussed in this paper.

  • PDF