Study on Development of Construction Management Module based on Risk factor classification system at Construction Phase (시공단계 위험요소 분류체계 구축을 통한 건설 프로젝트 관리모듈 개발에 관한 연구)

  • Lee, Joo-Sung;Moon, Sung-Kon;Jun, Yeong-Jin;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.199-202
    • /
    • 2009
  • Turn-key and CMF(CM for Fee) have been selected as procurement paths of large public projects in Korea. However, recently, researches and discussions on CMR(CM at Risk) have been popular as the Korean government seeks for alternative procurement paths to enhance the performance. In the CMR projects, the part who is responsible for construction management should predict and control the potential risks for guaranteeing benefits. In this research, CMR projects in which a general contractor plays the role as CMr is mainly analyzed. We give attentions to risk management during construction process given that subcontractors, main parts in this phase, work in various ways and thus more chances for faults exist. In this case, CMr manages risks to control the procedure of project. So, potential risk factors can constitute the database, and that database can be matched to following activity. And construction manager can forecast measures of risk using the result of matching. This chain of activities increase efficiency in roles of CMr on CMR(CM at Risk). Furthermore this study will propose one of the solution of Construction Management Module.

  • PDF

WHEN CM AT RISK MEETS VIRTUAL DESIGN AND CONSTRUCTION (VDC) IN CONSTRUCTION PHASE: CASE STUDY OF PRACTICIES IN U.S.

  • Joo-Sung, Lee;Sung-Kon, Moon;Ju-Hyung, Kim;Jae-Jun, Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.566-572
    • /
    • 2009
  • Turn-key and CMF(CM for Fee) have been selected as procurement paths of large public projects in Korea. However, recently, researches and discussions on CMR(CM at Risk) have been popular as the Korean government seeks for alternative procurement paths to enhance the performance. In the CMR projects, the part who is responsible for construction management should predict and control the potential risks for guaranteeing benefits. In this paper, CMR projects in which a general contractor plays the role as CMr is mainly analyzed. We give attentions to risk management during construction process given that subcontractors, main parts in this phase, work in various ways and thus more chances for faults exist. In this case, for the general contractor, to recognize potential risks in previous to start construction works of subcontractor by means of virtual design and construction (VDC) must be essential to this end. The case study of practices on VDC in U.S in which CMR has been introduced can provide considerable aspects to implement it in Korea.

  • PDF

How to Improve the Competency of Agency CM Companies to Conduct the CM at Risk Projects? (용역형 CM사가 책임형 CM 프로젝트를 수행하기 위해 필요한 역량)

  • Jeon, Myeongsik;Kang, Youngcheol
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.6
    • /
    • pp.44-54
    • /
    • 2021
  • As the CM at Risk market grows recently, designers and CM companies that have been performing agency CM services have been showing their interests to participate in the CM at Risk projects. With the assumption that agency CM companies with a lot of experiences and know-how in the field of construction project management have created the circumstances to enter the CM at Risk market, this study investigates the competencies necessary for the agency CM companies to carry out the CM at Risk projects. The compentencies to run the CM at Risk projects were identified based on the literature review. A survey was conducted to identify the competencies that need to be supplemented first. The survey results revealed that competency related to partner companies, finance and guarantee, risk and claim, and project cost were identified to have a higher level of complementation compared to other competencies. In addition, considering that the level of competency that need to be secured is high, as the level of holding of all competency is on average 76% of the required level, in the beginning, small-scale CM at Risk projects with relatively low risk are mainly carry out, strengthening competency and then increasing the scale is considered more appropriate strategy.

A STUDY ON CONSTRUCTION CONTRACTS AND PAYMENT METHODS IN CM AT RISK SYSTEM -APPROACH WITH ESTABLISHING CONTEXT OF GMP-CM SYSTEM -

  • JeaSauk Lee;JaeYoul Chun
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1002-1006
    • /
    • 2005
  • When we compare CM system with Design Bid Build system, we can see two striking features in CM system. First, CMr participates in construction team along with Owner, Designer and Constructor. The newcomer can change boundaries of function and responsibility. Second, Compatibility through each phase and Objectivity of decision-making become more important, because relation among stakeholders changes from a rectilinear to a network. However, it is not clear how the risk of completion is reasonably treated. So we have to think about the relations between Owner and CMr, CMr and Specialist Contractor from a point of trade risk. This paper covers them.

  • PDF

BIM based Design Optimization and Constructability Improvement for Adoption of Pre-construction Service. (프리컨스트럭션 서비스 도입을 위한 BIM 기반 설계 최적화 및 시공성 검토)

  • Lee, Chang-Hee;Lee, Jeong-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.11a
    • /
    • pp.187-188
    • /
    • 2017
  • Korean government is trying to adopt 'CM at Risk(CMR)' method to solve some problems of traditional project delivery method such as cost increase, delay, low quality. Pre-construction service(PCS) is a project management methodology of CMR and BIM is the best tool for efficient PCS execution. PCS is consisted of several main items such as Target costing, Cost trending, GMP, Design optimization, Constructability review and Productivity. The purpose of this research is to analyse contractor's PCS application case result and to find improvement items.

  • PDF

Development of a Business Support System by Phase for Delivering Construction Management Contract in the Government Civil Project (공공토목사업 CM 발주를 위한 단계별 업무지원 시스템 구축)

  • Chae, Yeong-Seok;Park, Seo-Young;Moon, Hyoun-Seok;Kim, Seon-Yeong;Kang, Leen-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.5
    • /
    • pp.81-92
    • /
    • 2011
  • Recently, the MLTM (Ministry of Land, Transport and Maritime Affairs) has announced CM business guidelines, because it is expected that the CM deliveries are going to be increased for a civil engineering industry with enforcement of the CM at Risk. In this trend, The CM business guideline, which is currently announced, is for the steps after the CM contract. However, the practical business guideline from a planning phase for the CM delivery to a selection phase of a CMr (Construction Manager) is essential for public construction projects including the civil engineering projects that the frequency of the CM deliveries is not sufficient. Therefore, this study established a standardized process model from the planning phase for the CM delivery to the selection phase of the CMr. study configured a business breakdown structure for CM delivery. A prototype system for supporting the CM delivery was also developed, and a practical operability was verified by a case evaluation based on the developed system. Hence, it is expected that this study will be utilized as a supporting system of the CM delivery business for public clients, which have not sufficient cases of the CM delivery.

Project Performance Comparison Based on Different Types of Project Delivery System (사례연구 분석을 통한 발주방식별 성과비교)

  • Lee, Soo-Kyong;Jung, Young-Soo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05a
    • /
    • pp.207-209
    • /
    • 2011
  • Numerous reports show that alternative project delivery systems (PDSs) such as design-build (DB), construction management at risk (CMR), and design-build-maintain (DBM) are increasingly used in many countries. This study compared characteristics of each PDS (design-bid-build (DBB), DB, CMR, or DBM) by analyzing quantitative data from 9 research articles. In order to compare characteristics between DBB and alternative PDSs, the study is based on principal 3 factors - Time, Cost, and Quality. DB shows the best performance in the time part and also the cost performance depending on facility type and project size. The performance of quality has minor difference among different PDSs. These results support the fact that using an appropriate PDS by the characteristic of a project makes high value of efficiency and productivity.

  • PDF

A Study on the Status and Future Development of Construction Management of Jeonju World Cup Stadium (전주월드컵경기장의 건설사업관리 추진현황과 발전방향에 관한 연구)

  • In Chi-Sung;Jung Soon-Gil;Kim Tae-Sam;Kim Geun-Woo;Do Sang-Yeek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.73-80
    • /
    • 2001
  • Generally, construction management is classified into two categories in the construction industry; CM for fee and CM at risk, most project is executed by the construction supervision including construction management in CM for fee field in Korea. The division of work scope is complicated among construction manager(CMr) and difficult to implement the construction management efficiently by CMr. in this case. Therefore, it is desired to apply the specialized Project Management Information System(PMIS) systematically include construction management procedure. We propose the future development of construction management on construction site based on the analyzed problem with PMIS and guideline and CM concept on construction site, composition of CM procedure through this Jeonju World Cup Stadium CM project.