WHEN CM AT RISK MEETS VIRTUAL DESIGN AND CONSTRUCTION (VDC) IN CONSTRUCTION PHASE: CASE STUDY OF PRACTICIES IN U.S.

  • Joo-Sung, Lee (Department of Architectural Engineering, Hanyang University) ;
  • Sung-Kon, Moon (Department of Architectural Engineering, Hanyang University) ;
  • Ju-Hyung, Kim (Department of Architectural Engineering, Hanyang University) ;
  • Jae-Jun, Kim (Department of Architectural Engineering, Hanyang University)
  • Published : 2009.05.27

Abstract

Turn-key and CMF(CM for Fee) have been selected as procurement paths of large public projects in Korea. However, recently, researches and discussions on CMR(CM at Risk) have been popular as the Korean government seeks for alternative procurement paths to enhance the performance. In the CMR projects, the part who is responsible for construction management should predict and control the potential risks for guaranteeing benefits. In this paper, CMR projects in which a general contractor plays the role as CMr is mainly analyzed. We give attentions to risk management during construction process given that subcontractors, main parts in this phase, work in various ways and thus more chances for faults exist. In this case, for the general contractor, to recognize potential risks in previous to start construction works of subcontractor by means of virtual design and construction (VDC) must be essential to this end. The case study of practices on VDC in U.S in which CMR has been introduced can provide considerable aspects to implement it in Korea.

Keywords