1 |
Park, K.M., and Kim, C.D. (2016). "Improvement through Analysis of Current Open Book Policy for the Korean CM at Risk." Korean Journal of Construction Engineering and Management, KICEM, 17(2), pp. 3-11.
DOI
|
2 |
Ahn, C.W., Ahn, Y.H., and Lee, S.H. (2016). "Role of Design Company for CM at Risk Delivery Method." Proceeding of annual conference of the architectural institute of Korea, AIK, 36(2), pp. 1,056-1,057.
|
3 |
Ahn, Y.H. (2013). "CM at Risk (CM at Risk) delivery method in US public architecture." Korean Journal of Construction Engineering and Management, KICEM, 14(4), pp. 69-72.
|
4 |
Bae, Y.H. (2019). 2019 Construction Management(CM) Capability Assessment and Disclosure Data Collection, CMAK, p. 24.
|
5 |
Kim, S.C., Park, C.J., Lee, S.Y., and Son, J.H. (2007). "Establishing the Education Strategy in strengthening Construction Management's ability in Large-scaled Construction Company." Korean Journal of Construction Engineering and Management, KICEM, 8(5), pp. 109-118.
|
6 |
Ryu, H.G., Lee, S.W., and Choi, J.H. (2020). "Evaluation of Capability for Practicing CM at Risk in Korea." Korean Journal of Construction Engineering and Management, KICEM, 21(2), pp. 79-87.
|
7 |
Kim, J.H. (2002). "Current status of CM in foreign countries." Monthly Building Culture, JeongSeongD&M, pp. 146-151.
|
8 |
Han, J.H., Kim, K.T., and Ahn, Y.H. (2018). "Major Risk Factors to Implement CM at Risk Pilot Project on the Public Sector." Korean Journal of Construction Engineering and Management, KICEM, 19(3), pp. 61-69.
DOI
|
9 |
Han, T.H. (2017). "Construction Industry Innovation and Pre-Con Service of GS E&C." Journal of the Korea Institute of Building Construction, KIC, 17(3), pp. 40-47.
|
10 |
Kim, H.S. (2016). "Is the construction industry ready for 'CM at Risk'?" eDNEWS, (Aug. 16, 2016).
|
11 |
Kim, W.Y. (2017). "The domestic introduction of CM at Risk." Review of Architecture and Building Science, AIK, 61(5), pp. 34-38.
|
12 |
Koh, B.W. (2017). "The role of architects in CM at Risk (CM at Risk) projects." Journal of the Korea Institute of Building Construction, KIC, 17(3), pp. 12-19.
|
13 |
Lee, C.J., and Ahn, Y.H. (2016). "A Benchmarking study on Pre-construction Estimating Services of Overseas Construction Companies for the CM at Risk Firm's competitiveness." Proceeding of annual conference of the architectural institute of Korea, AIK, 36(2), pp. 1,043-1,044.
|
14 |
Shin, S.H. (2004). "A Plan for Application of CM at Risk to the Public Construction Sector in Korea." Master's thesis, Department of Architectural Engineering, Graduate School, University of Seoul.
|
15 |
Park, B.S. (2019). "A Study on the Bid Evaluation Method for Selecting CM at Risk Contractors in Korea." Master's thesis, Graduate School, Chungbuk National University.
|
16 |
Park, S.H. (2014). "Cases and Challenges of Construction Management at Risk (CMAR)." Korean Journal of Construction Engineering and Management, KICEM, p. 7.
|
17 |
Park, S.H. (2016). "Proposal for the CM at Risk pilot project." eDNEWS, (Oct. 6, 2016).
|
18 |
Lee, C.J. (2017). "Benchmarking of Foreign General Cotractor's Pre-construction Services for a CM at risk Project to Improve Contractor's Competitiveness." Master's thesis, Department of Architectural Engineering, The Graduate School, Hanyang University.
|
19 |
Lee, J.S., and Lee, S.H. (2017). "Strategies for Successful Establishment of CM at Risk." Journal of the Korea Institute of Building Construction, KIC, 17(3), pp. 32-39.
|
20 |
MOLIT. (2016). "Awareness gap widens depending on the experience of self-driving cars." Ministry Of Land Infrastructure and Transport, (Dec. 26, 2016)
|
21 |
Chang, C.K., Lee, B.N., Choi, S.I., and Lee, D.K. (2006). "Understanding CM at Risk and Diagnosing the Possibility of Introduction." CERIK.
|
22 |
Son, K.N. (2018). "Importance Analysis of Obstacle Factors on the CM at Risk Projects using AHP Method." Master's thesis, Department of Construction Management, Master of Graduate School, Hanyang University.
|
23 |
Yoo, S.K., Choi, S.I., and Son, C.B. (2009). "An Analysis of Capability of CM at Risk in Major Construction Company." Korean Journal of Construction Engineering and Management, KICEM, 10(5), pp .85-94.
|
24 |
Ahn, K.H. (2009). "A study on countermeasures for the change CM at Risk." Master's thesis, Department of Construction Management, Master of Graduate School of Engineering, Hanyang University.
|
25 |
Lee, H.K. (2004). "Construction Management Services in Pre-construction Phase based on Client Needs Analysis." Master's thesis, Department of Architecture, Graduate School, Ajou University Graduate School.
|
26 |
Ahn, E.J., Yoo, B.G., Lee, Y.S., and Kim, J.J. (2008). "Measuring of the Performance of a Construction Management Project from Viewpoints of Project Participants-Focusing on Owner, Construction Manager, Designer and Constructor-" Korean Journal of Construction Engineering and Management, KICEM, 9(3), pp. 194-205.
|
27 |
Ahn, Y.H., and Lee, S.H. (2016). "Application of Preconstruction Service in CM at Risk delivery method." Korean Journal of Construction Engineering and Management, KICEM, 17(6), pp. 27-30.
|
28 |
Ahn, Y.H. (2017). "Contractor's Roles of Construction Management Project Delivery System in the United States." Journal of the Korea Institute of Building Construction, KIC, 17(3), pp. 20-27.
|
29 |
Han, J.H. (2019). "Risk factors to Implement CM at risk Projects." Master's thesis, Department of Architectural Engineering, The Graduate School, Hanyang University.
|
30 |
Chun, B.G. (2008). "Strategies for responding to CM service providers following the introduction of CM at Risk." Korean Journal of Construction Engineering and Management, KICEM, 9(3), pp. 13-16.
|
31 |
Kim, J.G., Jung, J.H., and Lee, H.G. (2009). "Response measures of construction companies following the introduction of the CM at Risk method." Journal of the Regional Association of Architectural Institute of Korea, AIKRA, 11(1), pp. 159-166.
|
32 |
Koo, S.K. (2017). "Risk Factor Assessment for Guaranteed Maximum Price Contract in CM at Risk." Master's thesis, Graduate School, University of Seoul.
|
33 |
Byun, I.W., and Kim, Y.S. (2012). "An Analysis of Core Competence of Pre-construction Service of the Making Inroads into Oversea Construction Market (for the Entry in the International Construction Business)." Korean Journal of Construction Engineering and Management, KICEM, 13(2), pp. 80-90.
DOI
|
34 |
Lee, C.J., Lee, S.H., and Ahn, Y.H. (2017). "Benchmarking of US General Contractor's Pre-construction Services for a CM at Risk Project to Improve Contractor's Competitiveness." Journal of the Korea Institute for Structural Maintenance and Inspection, KSMI, 21(3), pp. 9-18.
|
35 |
Lee, K.D. (2015). "A Study on the Analysis of main Barriers for the Activation of CM at Risk in the Domestic Construction Industry." Master's thesis, Department of Architectural Engineering, Graduate School, Kyungpook National University.
|
36 |
Park, Y.W. (2011). "A Study on the Improved Evaluation Methodology of Selecting Construction Manager." Doctoral dissertation, Department of Architectural Engineering, The Graduate School, Tongmyong University.
|
37 |
Gee, H.K. (2007). "Application of Construction Management (CM) Delivery System by Characteristics of Facility." Master's thesis, Department of Construction Management, The Graduate School of Construction Engineering, Chung-Ang University.
|
38 |
Kim, S.S., and Kim, J.Y. (2017). "Activities of CM at Risk Based on the performing experience of Posco A&C." Journal of the Korea Institute of Building Construction, KIC, 17(3), pp. 48-51.
|