• Title/Summary/Keyword: CM의 발전방향

Search Result 63, Processing Time 0.024 seconds

A Study of the Future Strategy and Mission for the Stakeholders in Industry, Academy, and Government for the Revitalization of CM (CM 활성화를 위한 산학관 분야의 향후 발전방향 및 미래과제)

  • Park, Hyung-Keun;Shin, Kyoo-Chul;Park, Hwan-Pyo;Jung, Young-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.6
    • /
    • pp.244-256
    • /
    • 2008
  • The Construction Management contracting method and administration system had introduced to Korea 10 years ago. The actual CM consulting contract has adapted just for 5 years only. The CM administration system proves lots of innovative construction practices, upgrading construction industry from corporations to site operations. However, there are more tasks to the CM professionals to revitalize CM contracting methods and administration system. This research investigated what CM has achieved for the past 10 years and what CM should accomplish for the coming 10 years as future strategy and missions. Overseas CM practices are reviewed and domestic market, regulations, requirements are investigated through structured interviewed and in-depth survey to CM professionals. Many interesting issues were found through research process and those topics were categorized by industry, academy and government for defining current problems and future tasks. These issues for future strategy and mission needs to be utilized to develop future CM contracting methods and administration system. The system to follow up these meaningful results of CM is important for the future progress.

The Study on a Developmental Direction of CM from Spontaneously Applied CM Case in a Private Construction Project -Mainly Related to the Construction of Dongbu Financial Center- (민간자체사업에서의 자생적 CM 적용사례와 CM 발전방향 - 동부금융센터 건설사업을 중심으로 -)

  • Choi Young-Kook
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.31-40
    • /
    • 2004
  • Ever since the CM was implanted in a domestic construction in 1996, it has been needed to take root and activate the CM system as soon as possible. Especially, the applied CM to private construction sector could be a fundamental barometer that how much changed and being advanced the construction system is This means, it is easy to apply CM to a governmental construction, yet it is hard to expect to successfully fix and activate CM for a private construction project unless they admit the necessity and validity of CM. Dongbu Corporation already acknowledged the need of CM in a private enterprise and willingly applied it to a construction sector while building Dongbu financial center, even before the CM was implanted to this country Therefore, this study suggests that the developmental direction of practical CM by examining effects and problems of the CM process.

  • PDF

A Study on the Status and Future Development of Construction Management of Jeonju World Cup Stadium (전주월드컵경기장의 건설사업관리 추진현황과 발전방향에 관한 연구)

  • In Chi-Sung;Jung Soon-Gil;Kim Tae-Sam;Kim Geun-Woo;Do Sang-Yeek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.73-80
    • /
    • 2001
  • Generally, construction management is classified into two categories in the construction industry; CM for fee and CM at risk, most project is executed by the construction supervision including construction management in CM for fee field in Korea. The division of work scope is complicated among construction manager(CMr) and difficult to implement the construction management efficiently by CMr. in this case. Therefore, it is desired to apply the specialized Project Management Information System(PMIS) systematically include construction management procedure. We propose the future development of construction management on construction site based on the analyzed problem with PMIS and guideline and CM concept on construction site, composition of CM procedure through this Jeonju World Cup Stadium CM project.

  • PDF

A Study on the status and improvement of construction management in Susung Culture & Art Center (수성문화예술회관의 건설사업관리 적용 현황과 향후 발전 방향에 관한 연구)

  • Park, Byung-Hak;Yoo, Byung-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.45-52
    • /
    • 2006
  • Recently The public project ordering in local autonumous entities is a tendency increasing of CM service because of the visible and affirmative effect in the CM which is advanced meanwhile. And, the CM services of project all phase excepts a planning business are performed. To develop CM must be prepared the system plans concerned with the CM application from planning phase, actuality maintenance of CM fee-estimation standard, understanding conversion of participation subjects, the specialization through certification of CM qualification, etc. But, unexpected actuality the problems occurs when the CM business is performing. The purpose of this study are to present the solution to the problems concerned with the design management, design phase VE, additional business by owner, schedule control and establish the plan to perform CM services efficiently in the public sector through analyzing the case of CM application in Susung Culture & Art Center.

  • PDF

A Study on the status and improvement of construction management in Daegu Gyeongbuk Institute of Science & Technology (대구경북과학기술연구원의 건설사업관리 적용 현황과 향후 발전 방향에 관한 연구)

  • Kim, Hwa-Bong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.32-38
    • /
    • 2007
  • Recently The public project ordering is a tendency increasing of CM service because of the visible and affirmative effect in the CM which is advanced meanwhile. The CM services of project all phase excepts a planning business are performed. But recently the CM services of project all phase including a planning business are increasing every year. To develop CM must be prepared the system plans concerned with the CM application from planning phase, actuality maintenance of CM fee-estimation standard, understanding conversion of participation subjects, etc. But, unexpected actuality the problems occurs when the CM business is performing. The purpose of this study are to present the solution to the problems concerned with the planning business management, additional business by owner, schedule control and establish the plan to perform CM services efficiently in the public sector through analyzing the case of CM application in Daegu Gyeongbuk Institute of Science & Technology.

  • PDF

CMS의 현황과 발전방향

  • 서인석
    • Proceedings of the Korea Database Society Conference
    • /
    • 2001.11a
    • /
    • pp.134-149
    • /
    • 2001
  • CMS(Contents Management Solution)는 컨텐츠를 관리하는 시스템을 의미. 시장조사기관 Ovum은 CMS에 대하여 'e-Business에 포함되는 모든 컨텐츠를 생성, 보관, 관리하는 일련의 작업(Task)과 과정(Process)'이라고 정의. 일반적으로는 '기업 내에 존재하는 다양한 포맷의 컨텐츠인 문서, 이미지, 동영상, 소리 등을 제작, 출판, 관리하는 솔루션으로 보통 컨텐츠 생성, 출판, 배포, 보관 등으로 정리되는 컨텐츠 라이프스타일 전체를 관리하는 것'으로 규정. (중략)

  • PDF

A Study on the status and improvement of construction management through the Accomplishment instance DeaHakRo Complex cultural space (대학로 복합문화공간 수행사례를 통한 건설사업관리 향후 발전 방향에 관한 연구)

  • Moon, Youn-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.419-423
    • /
    • 2008
  • The necessity of specialized and systematic management has been a tendency to accomplish the goal of business efficiently according the trend of construction industry has become bigger, complicated and specialized as well as Placing an order of CM(Construction Management) Service has been Increased because it made viable and positive effect. Institutional plan is necessary CM application from planning, realistic estimation of CM service charge, converting understanding among paticipants for the business and inducing specialization through certifyizing CM qualification to develop CM. But, it makes some realistic and unexpected pro41ems in the middle of step-by-step CM management for doing its business. So we need to consider a measure. This study suggests problems in practical a)fairs and improved idea that it summarized each stage of a bid for CM, planning, construction contract. It shows direction to take root successfully and develop.

  • PDF