• Title/Summary/Keyword: Bus rapid transit

Search Result 32, Processing Time 0.028 seconds

A Study on the Improvement of Pavement for Bus Rapid Transit System in Seoul (서울시 중앙버스전용차로 포장방법 개선방안 연구)

  • Bae, Yoon Shin;Kwon, Wan Taeg;Lee, Sang Yum
    • International Journal of Highway Engineering
    • /
    • v.16 no.4
    • /
    • pp.11-19
    • /
    • 2014
  • PURPOSES: This study is to suggest the improvement for bus rapid transit system in Seoul METHODS: The maintenance cost for bus lane damages and plastic deformations are increased by bus passing speed, heavy bus weight, and climate change (localized torrential downpour, subtropical climate) and the accident risk has been increased. RESULTS: Recent analysis of pavement damage indicates that bus lane damage caused by heavy weight is overwhelming and it is urgent to prepare countermeasures. CONCLUSIONS : Pavement data of bus rapid transit system, bus transit numbers and pavement damage elements were analyzed. By analyzing pavement maintenance, design and construction, the countermeasures for the improvement of bus lane pavement and effective maintenance were suggested.

Review of Intermodal System of AGT and Bus (AGT와 버스의 혼용시스템에 대한 고찰)

  • MOK Jai Kyun;Chang Se Ky;Yoon Hee Taek;Woo Yoon Seuk
    • Proceedings of the KSR Conference
    • /
    • 2003.10b
    • /
    • pp.58-63
    • /
    • 2003
  • This study shows the functional contribution into the public transportation system for congestion area. And there is a introduction for the rapid bus transit developed in Europe community. It can be classified the public transportation as urban transit, subway and bus. For a few years, it has been introduced the AGT system as a role of the alternative and lengthening system of subway line. Recently, there is going on construction of AGT system in some regional cities. The AGT system has advantages in terms of accessibility and cost-effective rather than subway. But the bus system is advantageous at the points rather than AGT system. It is obvious that the bus system is most cost-effective for infrastructure and system rather than any other public transports. If the bus system has punctuality and precise docking, that becomes best choice for public transportation scheme. There are tries to develop new systems by means of the f1les up the advantages in bus and AGT system, which can be classified as BRT(Bus Rapid Transit}. The idea is simple; 'Thirik rail, use advanced buses.' It is introduced the IRISBUS system at this article, which was developed in Europe community. And it is introduced the project architecture to develop the similar system to IRISBUS in KRRI through National Transportation Key Technology R&D Project

  • PDF

Fuel Cell Track Rapid Transit for Metro Area (도시형 연료전지 궤도차량 시스템)

  • Chang, Seky;Mok, Jai-Kyun;Moon, Kyeong-Ho
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.842-846
    • /
    • 2004
  • Both traffic congestion and air pollution in the metropolitan area can be greatly relieved by promoting the use of public transportation with zero emission system. Bus and subway are very convenient means for the people moving in the route areas. But they are not enough to satisfy handicapped or old people to have access to them and also do not solve environmental problems completely. New vehicle system, fuel cell track rapid transit, will be introduced as a countermeasure for such problems in the present paper.

  • PDF

Analysis of Bus Signal Priority Effect by BRT Stop Types: Focusing on Hannuri-daero, Sejong (BRT 정류장 형태에 따른 버스 우선 신호 효과 분석: 세종시 한누리대로를 중심으로)

  • Kim, Minji;Han, Yohee;Kim, Youngchan
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.20 no.3
    • /
    • pp.20-33
    • /
    • 2021
  • Modern society is steadily implementing policies to encourage public transportation to cope with the growing traffic demand on limited roads. The expectation is rising for transit signal priority to ensure the speed of buses as the installation of the bus rapid transit(BRT) expands nationwide to secure the competitiveness of buses. On the other hand, the form of BRT stops without considering some aspects of bus operation may increase the number of stops on the bus, thereby reducing the effectiveness of bus signal priority applications. This study suggests the type of bus stop to increase the operation efficiency of buses by analyzing the bus signal priority effect according to the BRT station type using Hannuri-daero, Sejong. The bus signal priority is used to maximize the two-way bandwidth of passenger cars and buses. As a result of the application, the effectiveness of the bus signal priority at the stop causing the double stop of the bus was reduced drastically, and the efficiency of the bus signal priority was increased significantly after improvement. These results are expected to be used as basic data in the form of proper bus stops considering the aspects of traffic operation when designing BRT stops in new towns in the future.

A Study on DRT System Introduction for Aging Society : A Case Study on Kimhae City (고령화사회의 DRT(Demand Responsive Transit)시스템 도입방안에 관한 연구 - 김해시를 중심으로 -)

  • Oh, Yun-Pyo;Kim, Jae-Youl
    • Journal of Korean Society of Rural Planning
    • /
    • v.14 no.3
    • /
    • pp.27-36
    • /
    • 2008
  • Rapid increase of aging population and progressed migration from rural areas to urban areas have caused deficit of bus routes in local cities. This increasing burden of operation deficit affects the movement strategy of the transportation vulnerable who are using buses. Along with dramatically increased aging in Korea, there is an urgent need to implement a new method which can guarantee mobility rights of public transportation especially for the elderly. This study focuses on the case of Demand Responsive Transit(DRT) system that has been operating in America, Europe, Japan, etc. Kimhae(Sangdong-myeon and Saengnim-myeon) is selected as a study area. This study investigated the possibility of adopting DRT system on the perspectives of the consumer and provider by the analysis of traffic condition such as the number of transportation vehicles, present bus service and regulation and conduct of questionnaire survey which includes present bus service and DRT system and so on. In conclusion, DRT system in Kimhae city will reduce transport cost, increase affordability through the betterment of service level and secure mobility rights for the transportation vulnerable.

Safety Analysis on Pedestrian Crossings in Urban Corridors with Bus Rapid Transit System (중앙버스전용차로 횡단보도의 보행 안전도 평가)

  • Han, Sang-Jin;Kim, Kewn-Jung
    • International Journal of Highway Engineering
    • /
    • v.10 no.4
    • /
    • pp.1-8
    • /
    • 2008
  • Seoul metropolitan government has introduced Bus Rapid Transit (BRT) systems in some major urban corridors on July 1st, 2004, and has reported that it was successful on the ground that bus speed has been increased in the corridors with BRT system and that it has also resulted in the increase of bus patrons. However, there comes a negative claim that BRT has increased the number of fatalities in the same corridors. This study first aims at developing safety evaluation indicators of pedestrian crossings, then compares values of those indicators from pedestrian crossings with and without BRT systems. The safety evaluation indicators of pedestrian crossing are developed as: the number (or ratio) of conflicts between pedestrians and vehicles, the number (or ratio) of vehicles violating pedestrian signals, the number (or ratio) of pedestrians remaining crossings at red signals, and the number (ratio) of pedestrians walking beyond crossing areas. When we compare values of these indicators for both pedestrian crossings with and without BRT system, it has turned out that crossings with BRT systems has more number of conflicts than the crossings without BRT systems, but it cannot be said that the ratio of conflicts will be different between two crossing types. It means that the number of conflict will increase as the number of pedestrians and vehicles in the crossings. When we note that BRT system intrinsically attract more number of pedestrians who get-in or get-off bus stops, we cannot said that BRT system will be safer for pedestrians.

  • PDF

The Research on Transportation Systems Development in Sejong City (세종특별자치시의 발전을 위한 교통체계 연구)

  • Ju, Yong-Jun;Ryu, Chang-Su;Park, Hyo-Sun
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.18 no.11
    • /
    • pp.2738-2744
    • /
    • 2014
  • For balanced development of the Sejong City, early settlement in transport infrastructure should precede the most. Of various means of transport, this study focus on BRT(Bus Rapid Transit) and the railway. Than the subway construction costs only a tenth. Equipped with a system of underground transport capacity to significantly increase the new concept of public transport in the BRT, utilizing the existing line railway to be constructed broad Chungcheong. The extension revolves 1 line of Daejeon subway to Jeongbuse kind government complex and the communication facilities is cooked for the rapid increase in the transportation demand according to the before central administration organization and Sejong city inflow of population.