• Title/Summary/Keyword: Building equipment

Search Result 1,181, Processing Time 0.024 seconds

Experimental Study on the Lateral Pressure Resistance of Free-form Concrete Panel (FCP) Side Form (FCP(Free-form Concrete Panel) 측면 거푸집의 측압 저항능력 실험)

  • Youn, Jong-Young;Yun, Ji-Yeong;Lee, Chang-Woo;Lee, Donghoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.8-9
    • /
    • 2021
  • FCP requires different curvatures and shapes according to the method of division, and it is necessary to manufacture a formwork accordingly. FCP production equipment consists of CNC equipment and side shape control equipment. This can be implemented in various shapes of upper, lower, and side surfaces. In the side shape control equipment, it is implemented as a variable side formwork. Among the required performance of the variable side formwork, there is stiffness against side pressure, which needs to be verified. Therefore, in this study, the FCP fabrication experiment is conducted with the developed variable side formwork. By analyzing the error in the shape of the fabricated FCP, the lateral pressure resistance capability of the side form is measured and verified.

  • PDF

3D Ground Terrain Processing Platform for Automated Excavation System

  • Kim, Seok;Kim, Tae-yeong;Park, Jae-Woo
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.669-670
    • /
    • 2015
  • Efficient management of the construction heavy equipment is required to reduce the rate of carbon emissions and on-site accidents. The intelligent excavation system (IES) will improve the construction quality and productivity through information technologies and efficient equipment operation, especially in large earthwork projects. Three-dimensional digitized ground data should be required for identifying the path of heavy equipment and work-site environment. Rapid development of terrain laser scanners (TLS) is more readily to acquire the digital data. This study suggests the '3D ground terrain processing platform (3DGTPP)' including data manipulating module and analyzing module of the scanned data for intelligent earthmoving equipment operation. The processing platform consists of six modules, including scanning, registering, manipulating, analyzing, transmitting, and storing. 3D ground terrain processing platform presented in this study will provide fundamental information for intelligent excavation system (IES), which will increase the efficiency of earthworks and safety of workers in significant.

  • PDF

How to Use Standard Market Prices for Ordinary Management System of Construction Equipment Prices in Poom-Saem (시가표준액을 활용한 건설공사표준품셈 건설기계가격 상시관리 방안)

  • Ahn, Bang-Ryul;Huh, Youngki;Kim, Dae Young;Tae, Yong-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.98-99
    • /
    • 2014
  • Construction equipment cost is critical to estimate the total construction costs, particularly in large and complicated projects. Despite its importance, the construction equipment cost may not reflect the current market value since the equipment database is being updated every 6 years at most. To keep construction equipment cost up to date, it is highly recommended to use the standard market price that is reported each year by the Ministry of Security and Public Administration (MOSPA). However, there is still a gap to adopt the standard market price system for the construction equipment cost computing system. Therefore, this paper suggests an effective way to develop a construction equipment cost estimation system.

  • PDF

A comparative analysis of load behavior of the fixing equipments for transporting unit modules (유닛모듈 운반용 고정장치의 하중거동 비교 분석)

  • Kim, Kyoon-tai;Kim, Seok;Jun, Young-Hun;Kim, Tae-Yeong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.146-147
    • /
    • 2015
  • This paper compares load behavior of two fixing equipments for transporting unit modules. The suggested fixing equipment shows higher limit load than an existing fixing equipment, which proves that the suggested fixing equipment have higher safety.

  • PDF

Safety Performance Assessment for a Aged Building (노후 건축물의 안전성능 평가항목)

  • Kwon Dong-Chan;Lee Yong-Jae;Lee Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.296-300
    • /
    • 2004
  • As a building aged, overall performance considering structural safety, equipment safety and fire safety is lowering gradually. Since the building performance and the overall value of the building change as time elapse, exact safety performance of the building should be evaluated not only maintaining the building efficiently and also preventing disputes between buyer and seller of the building. We suggest major elements for assessing building's safety performance through surveying literatures, interviewing experts, reviewing existing assessment models, The assessment elements proposed here ate comprised of structural safety, equipment safety, fire safety, fire protection and fire escape, etc. This study helps to make a safety performance assessment criteria for a building.

  • PDF

Surge Voltage Distribution at the Different Bonding Practice During a Direct Lightning Stroke to Building (건물의 직격뢰시 본딩 방식에 따른 서지 진압 분포)

  • Lee, Jae-Bok;Chang, Sug-Hun;Myung, Sung-Ho;Cho, Yuen-Gue
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.57 no.4
    • /
    • pp.444-450
    • /
    • 2008
  • There are several ways to bond to building grounding systems for reducing GPR(ground potential rise) and EMI resulting from power system faults or lightning stroke to building. In order to verify effective bonding practice, the GPR and voltage of equipment due to the direct stroke to building are calculated with ATP-EMTP model for transformer, transmission line and MOV(Metal oxide varistor). The simulated model shows a satisfactory accuracy compared with experimental result for the $8/20{\mu}s$ simulated current pulse. It is observed that separate grounding can cause dangerous voltage to the building equipment and the performance of surge protective device can improve when it is installed to the protected equipment in distance as short as possible.

A Case Analysis Study on the Validity Assessment of Safety Inspection Findings for Reconstruction - Focusing on the Building Finish and Equipment Deterioration Sector - (공동주택 재건축 안전진단 적정성 검토 사례분석 연구 - 건축 마감 및 설비노후도 평가 중심으로 -)

  • Jeon, Jun-Seo;Kim, Hong-Seop;Kim, Eun-Young;Choe, Gyeong-Cheol;Lee, Mun-Hwan
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.271-272
    • /
    • 2023
  • In this study, we conducted a case analysis of the building finish and equipment deterioration sector in the validity assessment of safety inspection findings for reconstruction. A total of 21 cases were analyzed to confirm the characteristic of performance score for each subsector. It is confirmed that the average performance score was generally affected by maintenance activity, had regional characteristics.

  • PDF

Development of Algorithm for Measuring Performance Rate of Construction Equipment using a Multipurpose Composite Sensor (다목적 복합 센서를 이용한 건설 장비 성과율 측정 알고리즘 개발)

  • Kwon, Jae-bum;Kim, Chun-Hak;Kim, Chang-Won;Cho, Dae-Gu;Cho, Hun-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.9-10
    • /
    • 2012
  • Efficient operation of construction equipment has become more and more important in the competitive construction environment. Accurate measurement of performance rate of construction equipment is a critical factor for a construction project planning. However, it might be quite difficult to measure the performance rate due to diverse practical limitations such as continuously variable performance rate of construction equipment, considerable indirect cost, large construction field, and so on. Therefore, the purpose of this paper is to propose an automatic algorithm that measures a performance rate of construction equipment with a multipurpose composite sensor. It is expected that the algorithm compiles database on construction equipment and in advance, facilitates efficient operation of construction equipment.

  • PDF

Construction Equipment Fleet Optimization for Saving Fuel Consumption (에너지 절감을 위한 건설장비 조합 최적화 방법 연구)

  • Yi, Chang-Yong;Lee, Hong-Chul;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.198-199
    • /
    • 2015
  • Construction equipment is a major energy consumption source in construction projects. If 10% reduction of the diesel fuel usage is achieved in the construction industry, it may reduce 5% of the total energy usage. Energy saving operation is a major issue in equipment-intensive operations (e.g., earthmoving or paving operations). Identifying optimal equipment fleet is important measure to achieve low-energy consumption in those operations. This study presents a system which finds an optimal equipment fleet by computing the low-energy performance of earthmoving operations. It establishes construction operation model and compares numerous combinations using alternative equipment allocation plans. It implements sensitivity analysis that facilitates searching the lowest energy consumption equipment fleet by enumerating all cases.

  • PDF

Formwork Productivity Analysis Model for Cost-efficient Equipment Operations

  • Hyunsu Lim;Taehoon Kim;Hunhee Cho;Kyung-In Kang
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.226-230
    • /
    • 2013
  • In the tall building construction, the slab formwork largely impacts on construction cost. Because productivity of a slab formwork is influenced by a number of and the efficiency of equipment, using the equipment-based construction method, an appropriate equipment input planning is crucial for the productivity. Meanwhile, the general equipment input planning is conducted by intuition based on experience due to the lack of equipment productivity data. Thus, this study develop a simulation model to analyze table formwork productivity and to propose an optimum equipment input plan that reflects the construction process, based on the full consideration of the economic factors. This study developed a simulation model by using CYCLONE and the data for the model was collected by measuring the duration of each unit activity in the tall building where table forms were applied. It is expected that a simulation model helps users to make better decision on the equipment input planning of slab formwork.

  • PDF