• 제목/요약/키워드: Building System

검색결과 10,288건 처리시간 0.042초

건축 옥상 방수 신기술의 동향 (A Trend of New Waterproofing System for Building Roof)

  • 우영제;조병영;신주재;김영근
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2003년도 가을 학술발표회 논문집
    • /
    • pp.549-552
    • /
    • 2003
  • User's demand, as a maintenance for durability of construction and a comfortable life, and an incentive systems for new waterproofing system incite waterproofing company to evolve new waterproofing system that is upgraded waterproofing quality by getting advantages for the existing waterproofing systems. There are seven new waterproofing systems for building roof to be authorized from Ministry of construction & transportation. Those are multi-layers waterproofing system, and five of those are the insulation type. A trend of new waterproofing systems for building roof is multi-layers waterproofing system insulated.

  • PDF

미래 국방 군수시스템 구축 방향 연구 (A Study on the direction of building the Defence Logistics System in the future)

  • 최종근;최상영
    • 한국국방경영분석학회지
    • /
    • 제28권1호
    • /
    • pp.1-16
    • /
    • 2002
  • The object of this study is to suggest the direction of building the defence logistics system of Korea Armed Forces in the future. For the purpose of this, we surveyed the best practices among the enterprises and U.S. Defence which reformed successfully the physical distribution and logistic in recent year. Also, we analyzed our current logistics system and suggested the vision, operational concept, and the way of building this system. This system is expected to reduce the total logistics cost, speed up the logistics velocity and increase the efficiency of the combat support.

기존 사무소 건물 및 설비전문가 조사를 통한 설비시스템의 변화와 전망에 대한 연구 (A Study on the Transition & Expectation through Survey for Existing Building and Engineer's Opinion)

  • 이관호;김남규;박진철;이언구
    • 한국태양에너지학회 논문집
    • /
    • 제25권2호
    • /
    • pp.63-69
    • /
    • 2005
  • This study is the survey of a transition procedure of building services systems(heat source, HVAC, water supply) through the survey of existing office buildings, building design documents. The preference & major consideration of system selection is the engineer's opinions. The results of this survey can be used in selection of building services system design. In this survey, "Hot & cold water generator system" and "single duct CAV+FCU system", "Elevated water tank system" are selected. The most important consideration in system selection is the energy saving in heat source system, and comfort in HVAC system, and water pressure in water supply system. They prefer "steam boiler+absorption chiller system" for heat source system, "steam boiler+ice thermal storage system", "hot & cold water generator system", "district heating+absorption chiller system" : "single duct CAV+FCU system" and "single duct VAV+convector system" for HVAC system: and "booster pump system" for water supply system.

공조방식에 따른 사무소 건물의 에너지 성능 평가 (A Simulation Appraisal of Energy Performance in Office Building by Different Types of Air-Conditioning)

  • 최종대;최동석;윤근영
    • 설비공학논문집
    • /
    • 제24권8호
    • /
    • pp.612-620
    • /
    • 2012
  • High economic growth causes increase of the building energy consumption. The energy consumption for HVAC system accounts for 40~50% of the whole building consumption. The trend for building is large-scale and high-rise. Because of the trend, the energy consumption is becoming bigger than before. Nowadays, HVAC system design are recognized as the solution for a energy-saving. This paper is focused on the energy performance evaluation of central air-conditioning system(water-based) and system air-conditioning that were applied to the office building. The systems are modeled and simulated by using EnergyPlus Software 6.0. After the Simulation, annual cooling and heating energy consumption were calculated. It was found that the system air-conditioning can reduce the energy consumption approximately 55.24% annually compared with the central air-conditioning system(water-cooled). In addition, about 46.13% of annual operating costs can be reduced by use of system air-conditioning.

지하층 합벽 무지주 시스템 거푸집의 적용성에 관한 연구 (A Study on the Applicability of Non-Supporting System Forms for Single Face Walls in Underground Construction)

  • 김재엽;안성훈;손영진
    • KIEAE Journal
    • /
    • 제8권2호
    • /
    • pp.87-92
    • /
    • 2008
  • Underground building constructions are recently more important because the ratio of underground area is increasing in the huge and high-rise building construction projects. For reducing the total building construction periods, it is required to reduce not only the over-ground structural work periods but also the underground structural work periods. Therefore, this study is proposed the non-supporting system forms for single face walls in underground building construction by one of the methods for reducing the underground structural work periods and investigated the applicability of the non-supporting system forms by analyzing the case-study in civil construction project. In regard of construction duration, the results of analyzing the case-study showed that the non-supporting system forms are better than the euro forms with soldier system for single face walls in underground building construction. In addition, it is showed that the cost of these two forms is similar and usage the working space and safety in non-supporting system forms are better that those of the euro forms with soldier system, too.

고층건물 적용을 위한 시공자동화시스템 요소기술의 중점 관리사항 도출 (Critical Management Factor of Elemental Techniques for Construction Automation System in High-Rise Building)

  • 조남석;김창원;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 추계 학술논문 발표대회
    • /
    • pp.15-16
    • /
    • 2011
  • Construction automation and robotics are being taken notice as an alternative to improve productivity and quality. Reflecting on these purpose, automation system, called RCA(Robotic-crane based Construction Automation) system, is developed and have been verified through a pilot project recently in Korea. To apply the RCA system in high-rise building effectively, each management factors of element technologies in the system is derived and assessed critical factor. The purpose of this study, management factors of element techniques, consisted of RCA system, is classified through questionnaires/interviews targeting system developers and construction managers in pilot project site, and critical factors is selected using AHP.

  • PDF

기존지역 잠재량조사에 기반한 소형열병합발전시스템의 경제성 단순분석 (A Study on the Simple Payback Period Analysis of Small Co-generation System based on the Existing Apartment and Building Data)

  • 김용하;우성민;김미예;이성준;손승기
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제55권11호
    • /
    • pp.498-504
    • /
    • 2006
  • This paper describes the simple payback period analysis of small co-generation system based on the existing apartment and building data. First, We investigate apartment and building data more than $2000[m^2]$ using Ministry of Construction & Transportation's computer system. And then we calculate the latent amount of small co-generation system considering gas company and CHP. Second, we classify the latent amount of small co-generation system into office, hospital, hotel, department store, complex building and apartment. Finally, we perform the simple payback period analysis for small co-generation system. The results show the simple payback period of small co-generation system is less then 10 years.

초고층 건축물 전력관리 시스템에 BIM 적용을 위한 기초적 연구 (A Fundamental Study on Applying BIM to Power Manage System of Super Tall Buildings)

  • 조찬원;권순호;이운재;노태임;옥종호
    • 한국CDE학회논문집
    • /
    • 제17권2호
    • /
    • pp.140-148
    • /
    • 2012
  • This study aims to provide power monitoring system for super tall buildings with 3D BIM (Building Information Modeling) technology. In order to realize this subject, standard specifications for BIM objects and attributes were studied through analyzing processes and elements of electrical utilities for power management systems applied for super tall buildings. These standard BIM specifications could be used by designers, contractors and facility operators, and thus could be helpful to realize BIM information sharing between multiple disciplines and construction phases. And further study has been suggested to develop standard specification and applications from this study.

초고층 건축물의 대형기초 설계 사례 (A Case Study of The Design of Mega Foundations for High-rise Buildings)

  • 김성호;홍승현;홍사면;최용규
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2007년 가을학술발표회
    • /
    • pp.55-77
    • /
    • 2007
  • Currently a large number of high rise building projects are under plan and a mega foundation system to support this high load with safety is requiring. The foundation of a highrise building is displaced by the building load, which influence the behavior of a super structure in reverse. In this aspect, the structural interaction analysis between a foundation and a super structure is necessary. In this study, the relationship of a superstructure of building and a foundation has been reviewed, considering the tendency of design from a capacity driven design to a performance design. Two different case studies have been introduced to help understand this relationship in more specific, the first case is the high rise building founded on a mat system on rock and the second is that on large diameter bored piles on soft ground condition.

  • PDF

제어기가 설치된 3층 건물의 시스템 식별 (System Identification of the Three Story Building Structure with a Controller)

  • 주석준
    • 한국지진공학회:학술대회논문집
    • /
    • 한국지진공학회 1999년도 추계 학술발표회 논문집 Proceedings of EESK Conference-Fall
    • /
    • pp.203-211
    • /
    • 1999
  • Threr are several methods in protecting the building structures from dynamic loads such as an earthquake and a wind. Among them applying a control force to the building structure is one of the methods to decrease the vibration. The most important and difficult problem in the active control is to obtain the mathematical model of the building structure with a controller. the effective active controller can be designed from the exact model of the system In this paper the three story test building with an active mass driver is identified experimentally. the system matrices corresponding to the experimental building are found and verified with the experimentally-obtained transfer functions and responses efficiently.

  • PDF