• Title/Summary/Keyword: Building System

Search Result 10,234, Processing Time 0.033 seconds

User Interface Design for Life Cycle Cost Estimation System (LCC 산정 시스템의 사용자인터페이스 설계)

  • Yang, Hoe-Ryeong;Shin, Han-Woo;Kim, Tae-Hui
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.149-150
    • /
    • 2012
  • According to the increase of demand of the deteriorated building. The interest of the building's maintenance is continually increased, so studies about how to increase building's stability & prolonged life span are increased. This study's purpose is to maintain building's function, so we suggest a protocol type system of UI to estimate reasonable planning of demand of repair & replacement and to distribute budget.

  • PDF

Shear Performance Evaluation of Composite Thermal Insulation with Quasi-Non-Combustible according to Adhesive Type (부착 유형에 따른 준불연 복합단열판 전단성능평가)

  • Choi, Ki-Sun;Oh, Keunyeong;Park, Keum-Sung;Ha, Soo-Kyung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.5
    • /
    • pp.507-518
    • /
    • 2022
  • The purpose of this research is to obtain experimental data for developing a structural design of an external insulation system by evaluating the shear performance of a composite insulation system according to the adhesive type. The shear performance of the composite insulation system was experimentally evaluated by considering a simultaneous placement method, full and spot/edge coverage using adhesive mortar. As a result of the test, the shear strength of simultaneous placement and full coverage method was almost similar, the spot/edge coverage method was about 80% of them. Also, the simultaneous placement method is considered to be constructively advantageous when applied as an external insulation system to a high-rise building compared to using an adhesive mortar.

A Study on the Development of Roof Integrated PV Module (Focused on the Prefab Building System) (지붕재 일체형 태양전지 모듈의 개발에 따른 내구성 평가 (조립식 건축시스템을 중심으로))

  • Yi, So-Mi;Noh, Ji-Hee;Lee, Eung-Jik
    • KIEAE Journal
    • /
    • v.6 no.4
    • /
    • pp.17-24
    • /
    • 2006
  • The application of photovoltaics into building as integrated building components has been paid more attention worldwide. Photovoltaics or solar electric modules are solid state devices, directly converting solar radiation into electricity; the process does not require fuel and any moving parts, and produce no pollutants. And the prefab building method is very effective because the pre- manufactured building components is simply assembled to making up buildings in the construction fields especially the sandwich panel. Architecture considerations for the integration of PV module to building envelope such as building structure, construction type, safety, regulation, maintenance etc. have been carefully refelected from the early stage of BIPV module design. Trial product of BIPV module are manufactured and sample construction details for demonstration building are purposed. Therefore, this paper intends to advanced its practical use by proposing how to get integrated PV system which can be applied to prefab building material, and how to apply it.

The Development of Automated Building Equipment Design Process System Using 3D CAD (3차원 CAD정보를 활용한 건축설비설계 프로세스 시스템 개발방향)

  • Lee, Dong-Hyun;Jung, Woo-Shin;Kim, Young-Don;Song, Kyoo-Dong
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2008.04a
    • /
    • pp.269-274
    • /
    • 2008
  • It is attempted that the standardization of the construction, globalization of the engineering construction and an information oriented construction spread by setting a goal of the advanced construction industry and productivity increase of human resources within the country. Hence, it has been brought in the information oriented construction of BIM based technology for the field of construction and equipment of Korea. The current study that examines the possibility of application of 3D ; that is BIM based programs of building equipment, and make better the problems of 3D building equipment system through the Pilot Test, indicates the way of growth development about the construction of building equipment process system.

  • PDF

Design of Seismic Isolated Tall Building with High Aspect-Ratio

  • Kikuchi, Takeshi;Takeuchi, Toru;Fujimori, Satoru;Wada, Akira
    • International Journal of High-Rise Buildings
    • /
    • v.3 no.1
    • /
    • pp.1-8
    • /
    • 2014
  • When seismic isolation system is applied to high aspect-ratio (height/wide-ratio) steel structures, there are several problems to be taken into consideration. One is lifting up tensile force on the isolation bearing by overturning moment caused by earthquake. Another is securing building stiffness to produce seismic isolation effects. Under these conditions, this paper reports the structural design of high-rise research building in the campus of Tokyo Institute of Technology. With the stepping-up system for the corner bearings, the narrow sides of single span framework are designed to concentrate the dead load as counter-weight for the tensile reaction under earthquake. Also we adopted concrete in-filled steel column and Mega-Bracing system covering four layers on north & south framework to secure the horizontal stiffness of the building.

The Study on Integrated ACS and Lift Car System for Early Beginning of Windows Work in Tall Building Construction (초고층 창호공사 조기착공을 위한 ACS-Lift Car 연계 시스템 기초연구)

  • Lee, Dongyoon;Lim, Hyunsu;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.72-73
    • /
    • 2014
  • Recently the concurrent construction method of framework and windows work has been applied for early beginning of exterior finishing works in tall building construction. However, the conventional method makes difficulties in auto-climbing of gang-form and climbing work of lift car since the removal of ACS(auto climbing system) should be preceded for operation of lift car up to the top floor. This study propose a concept model of integrated ACS and lift car system to resolve these problems and begin windows works early in tall building construction.

  • PDF

A Study of DB System Establishment for Facility Management of High-Rise Mixed-use Building in Urban Regeneration (도시재생사업에서 초고층 주상복합시설의 유지관리를 위한 DB System 확립에 관한 연구)

  • Park, Jae-Hyun;Cho, Yong;Park, Won-Ho;Oh, Jung-Keun;Paek, Joon-Hong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.05a
    • /
    • pp.177-181
    • /
    • 2008
  • Recently, amount of High-Rise Mixed-use Building is Increasing based on Preference of comfortable residence and good view. Government policies were turned to prefer about High-Rise Mixed-use Building because of decreased real estate Condition. But these changes have revealed that it has many maintenance problems for example- efficiency, economic, environmental problems. This paper suggests that the Database System based on various alternatives and real case. And it will be a tool in the scientific decision and value analysis from the facility management to make optimized decision.

  • PDF

Relationship Analysis of Field Work in Beam-Column System Frame Work of the Precast Concrete Public Apartment Building (보-기둥구조 PC공동주택 골조공사 작업관계 분석)

  • Kim, Ki-Ho;Kim, Jin-Won;Kim, MIn-Jun;Lee, Dong-Gun;Sohn, Jeong-Rak;Lee, Bum-Sik
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.11a
    • /
    • pp.41-42
    • /
    • 2022
  • This study analyzed the process related to the linkage between on-site work targeting the middle size Precast Concrete(PC) public apartment building with beam-column system and prepared on-site works flow relationship diagram in which the wet process consists of core Critical Path(CP) to prepare a network diagram of the Precedence Diagram Method(PDM). Through this study, it is expected that it will be possible to maximize the project management capability by suggesting a method to minimize risk factors and the optimized process management of the beam-column system PC public apartment building.

  • PDF

Rectangle Region Based Stereo Matching for Building Reconstruction

  • Wang, Jing;Miyazaki, Toru;Koizumi, Hirokazu;Iwata, Makoto;Chong, Jong-Wha;Yagyu, Hiroyuki;Shimazu, Hideo;Ikenaga, Takeshi;Goto, Satoshi
    • Journal of Ubiquitous Convergence Technology
    • /
    • v.1 no.1
    • /
    • pp.9-17
    • /
    • 2007
  • Feature based stereo matching is an effective way to perform 3D building reconstruction. However, in urban scene, the cluttered background and various building structures may interfere with the performance of building reconstruction. In this paper, we propose a novel method to robustly reconstruct buildings on the basis of rectangle regions. Firstly, we propose a multi-scale linear feature detector to obtain the salient line segments on the object contours. Secondly, candidate rectangle regions are extracted from the salient line segments based on their local information. Thirdly, stereo matching is performed with the list of matching line segments, which are boundary edges of the corresponding rectangles from the left and right image. Experimental results demonstrate that the proposed method can achieve better accuracy on the reconstructed result than pixel-level stereo matching.

  • PDF

A Framework of Building Knowledge Representation for Sustainability Rating in BIM

  • Shahaboddin Hashemi Toroghi;Tang-Hung. Nguyen;Jin-Lee. Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.437-443
    • /
    • 2013
  • Recently, sustainable building design, a growing field within architectural design, has been emerged in the construction industry as the practice of designing, constructing, and operating facilities in such a manner that their environmental impact, which has become a great concern of construction professionals, can be minimized. A number of different green rating systems have been developed to help assess that a building project is designed and built using strategies intended to minimize or eliminate its impact on the environment. In the United States, the widely accepted national standards for sustainable building design are known as the LEED (Leadership in Energy and Environmental Design) Green Building Rating System. The assessment of sustainability using the LEED green rating system is a challenging and time-consuming work due to its complicated process. In effect, the LEED green rating system awards points for satisfying specified green building criteria into five major categories: sustainable sites, water efficiency, energy and atmosphere, materials and resources, and indoor environmental quality; and sustainability of a project is rated by accumulating scores (100 points maximum) from these five major categories. The sustainability rating process could be accelerated and facilitated by using computer technology such as BIM (Building Information Modeling), an innovative new approach to building design, engineering, and construction management that has been widely used in the construction industry. BIM is defined as a model-based technology linked with a database of project information, which can be accessed, manipulated, and retrieved for construction estimating, scheduling, project management, as well as sustainability rating. This paper will present a framework representing the building knowledge contained in the LEED green building criteria. The proposed building knowledge framework will be implemented into a BIM platform (e.g. Autodesk Revit Architecture) in which sustainability rating of a building design can be automatically performed. The development of the automated sustainability rating system and the results of its implementation will be discussed.

  • PDF