• Title/Summary/Keyword: Building Factors

Search Result 3,082, Processing Time 0.037 seconds

An Empirical Study on the Trust-Building Strategy of Internet Automobile Insurance : Comparison of Male and Female Customers

  • Lim, Se-Hun;Lee, Suk-Ho;Park, Young-Tae
    • Journal of Information Technology Applications and Management
    • /
    • v.15 no.3
    • /
    • pp.91-110
    • /
    • 2008
  • Trust is emphasized as one of the most important factors in various e-commerce related studies. It is no exaggeration to say that in the area of e-commerce, trust-building with customers determines a company's success or failure. That is why most e-commerce based companies spare no time and effort in building trust with customers. Without exception, trust is one of the most critical factors influencing a customer's decision making process of whether to purchase Internet automobile insurance. This study attempts to provide useful guidelines for the sales-enhancing strategies of Internet automobile insurers, by delving into research questions concerning 1) gender differences in Internet automobile insurance customers' recognition of trust, and 2) gender differences in the effective trust factors influencing one's intention to purchase of Internet automobile insurance. The study finds that while the shape of trust-recognition toward three types of trust factors is very similar for both gender groups, the intensity of trust for each gender group in overall is pretty different. The results indicate that there exist gender differences in the trust factors influencing one’s intent to purchase Internet automobile insurance. The results of this study will provide useful guidelines for Internet automobile insurers in establishing effective and differentiated marketing strategies.

  • PDF

An Analysis of Performance Assessment Factors of Indoor Environmental Quality in Multi-Family Housing Using Post Occupancy Evaluation (거주후 평가를 통한 공동주택의 실내환경 성능평가요소 분석에 관한 연구)

  • Lee, Si-Nae;Park, Jin-Chul;Rhee, Eon-Ku
    • Journal of the Korean Solar Energy Society
    • /
    • v.31 no.2
    • /
    • pp.128-134
    • /
    • 2011
  • The objective of this study is to analyze the major factors of indoor environment that affect the satisfaction of the occupancy in multi-family residential buildings. The results of this study can contribute to improving the comfort of the residents effectively as they are applied preferentially at the design and construction stages. The indoor environment factors investigated for the analysis included thermal, light, air and the acoustic environment. The individual factors were derived from the 'indoor environment' assessment indices of the green building certificate systems of various countries. Based on these, a questionnaire was prepared to conduct the Post Occupancy Evaluation. The survey results were statistically analyzed.

Development of Carbon Emission Casual Map Considering Variable Factors in Steel Erection Work (가변요인을 고려한 철골세우기 작업의 탄소배출 인과지도 개발)

  • Nam, Chulu;Lee, Dongyoun;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.10a
    • /
    • pp.75-76
    • /
    • 2016
  • Because of variable factors in construction phase, measurement of carbon emission in construction industry is more difficult than in other industries. To enhance accuracy of the measurement, the impact of variable factors must be considered. In this paper, to understand the influence of variable factors in steel erection work, a carbon emission casual map was developed. The map demonstrates that the considerations of variable factors in measurement of carbon emission improves the accuracy. The results of this paper are expected to contribute to development of carbon emission casual map and carbon emission measurement model for the entire construction phase.

  • PDF

Construction Conflict Risk Factors based on the Conflict Cost (분쟁청구비용을 고려한 건설 분쟁의 위험요인)

  • Shin Han-Woo;Soe Jang-Woo;Cho Hun-Hee;Kang Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2006.05a
    • /
    • pp.125-128
    • /
    • 2006
  • Since the diversification, complication of the construction industry, construction conflicts have been increased these days. Expansion of scale of construction has brought conflict treatment cost increase. Thus, needs of the study on construction conflict risk factors and its management is getting important. But the existing studies about construction conflicts and risk factors that need to be cared to decrease construction cost are almost focused on analysis of number of conflict proposed. It means those studies can be helpful when want to know how many conflict have been instituted, however, they do not contain a close examination between types of conflict and cost of conflict treatment. The purpose of this study, therefore, is an extraction of conflict causes based on the conflict treatment cost and the choice of significant risk factors to be managed to prevent conflict and its treatment cost, which enables reducing the conflict treatment colt on control the risk factors.

  • PDF

Development of Selection Criteria for Composite Method Using Half-PC Slab (하프슬래브를 이용한 PC 복합공법의 선정기준 개발)

  • Park, Byeong-Hun;Kim, Jae-Yeob
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.103-104
    • /
    • 2016
  • Most of studies on PC method aim at the structural analysis and development of PC members, and studies on the construction management aspect are insufficient. This study is a basic research in the construction management aspect regarding 'composite method using hollow-PC column' (HPC method), and is intended to develop assessment standards for the benefit·cost analysis of HPC method. Assessment standards for the benefit·cost analysis were composed of main-factors and sub-factors through interview with 4 experts. It was possible to classify main-factors into 4 major categories, i.e,. structural performance, construction performance, construction duration and construction cost. Sub-factors were composed of factors which were of high importance in assessing the two methods. And factors judged to be repeated or of little importance were excluded.

  • PDF

Elicitation Project Management Factors and Evaluation of its Weight to Ensure LNG Plant Success (LNG 플랜트 사업관리 요소 도출 및 중요도 평가)

  • Han, Jae-Goo;Chin, Kyung-Ho;Park, Hwan-Pyo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05b
    • /
    • pp.85-89
    • /
    • 2010
  • The propose of this research is derive project management factors and evaluate its decision weight in LNG plant EPC phases. In order to research, we studied the demestic and international research trend and analysed expert opinions. Initially we derived nine project management factors in each phase of EPC. Elicited factors in research are project management, design management, cost management, time management, contract and craim management, safety management, environment management, and risk management. Then, we evaluated the weight of project management factors with expert survey method and elicitated. Finally, The remarkable points in the result are that key management factors of EPC project are project management and risk management.

  • PDF

A Study on the Analysis of the Risk Factors for Overseas Plant Construction Projects (해외 화공플랜트 건설사업 위험요인 영향도 분석)

  • Cho, Seung-Yeon;Kim, Young-Su
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05b
    • /
    • pp.103-108
    • /
    • 2010
  • The purpose of this study is to analyze of the risk factors for oversea plants construction projects. For this study, risk factors data from related literature review, research organization and construction company was researched and classified under each EPC phases. In addition, a questionnaire survey by plant experts was conducted for analysis of risk weight and costs and time impact on each EPC phases. The results of this study are as follows: First, a detail design errors(engineering phase), a equipment procurement plan(procurement phase), and exchange rate fluctuations(construction phase) were analyzed the highest weight factors. Second, a financing plan(engineering phase), quantity take-off bill(procurement phase), and exchange rate fluctuations(construction phase) were analyzed the highest cost impact factors. Third, detail design errors(engineering phase), a equipment procurement plan(procurement phase), and schedule management errors(construction phase) were analyzed the highest time impact factors.

  • PDF

A Study on the Importance Analysis of Environmentally-Friendly Planning Factors Using Analytic Hierarchy Process (계층분석법을 이용한 환경친화 계획요소의 중요도 분석에 관한 연구)

  • 류지원;김정환;정응호
    • Journal of Environmental Science International
    • /
    • v.12 no.9
    • /
    • pp.897-903
    • /
    • 2003
  • This study focuses on importance level analysis of environmentally-friendly planning factors using Analytic Hierarchy Process(AMP). This study verify different planning principle makes comparison matrix by a relative comparison value, verified consistency after yield weight to analyze more objective importance for apartment complex estate environmentally-friendly planning factor. In order to decide importance of apartment complex estate environmentally-friendly planning factors multiplying weight of verified planning principle with weight of planning factors. The results are as follows; First, importance of preservation of green tract of lands, Preparation of Biotop, Tree planting of sites, Propriety of development density high except Circulation and practical use of water. Next, valued planning factors constituent appeared to Energy efficient building plan, Rubbish recycling, thermal utilization of solar energy, Artificial tree planting of buildings etc. importantly. Finally, plan constituent that importance is underrated most appeared by Practical use of building materials and equipment, Centralization of energy and resources, Preservation of corridor etc.

Deduction and Management of Change Order Management Factors through Dispute Case Analysis - Focusing on Korean Commercial Arbitration Board Arbitration Case - (설계변경 분쟁 사례분석을 통한 설계변경 관리요인 도출 및 관리방안 - 대한상사중재원 중재 사례 분석 중심 -)

  • Yeon, Heejung;Hyun, Chang-Taek;Lee, Sanghoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.365-366
    • /
    • 2023
  • The purpose of this study is to prevent dispute due to change orders in construction projects and to handle change orders smoothly. For this purpose, this study analyzed arbitration cases caused by change order handled by the Korea Commercial Arbitration Board. Based on this, dispute factors were analyzed and change order management factors and management plans were presented. Change order management factors were derived from responsibility, contract, design, process, construction cost, and schedule management, and a detailed management plan according to the relevant factor was presented.

  • PDF

A System Dynamics Approach of the Introduction of Local Innovative Systems to Community Development Policies in Korea (리빙랩을 통한 지역공동체 활성화 방안에 관한 연구)

  • Choi, In Su;Kim, Kun Wee
    • Korean System Dynamics Review
    • /
    • v.16 no.4
    • /
    • pp.83-101
    • /
    • 2015
  • The purpose of this study is to illuminate the reason why community building policies by the Government seem to fail to work properly in Korea. The existing studies focus mainly on designing community building systems, thus they cannot provide plausible explanations about the cause of the unsuccessful outcomes from the policies. To overcome the limitations of the existing studies, the authors examine the implementation factors to influence the policy instruments with the perspective of policy implementation. By performing the analysis, the results imply the implementation factors, such as executer's competence, supports by related interests, incentive systems, and legal-institutional instruments, are important to influence the implementation performance of the relevant policy instruments. To make community building successful policies, The authors therefore suggest that the capacity of local administrators and residents should be raise, and one of which the way to enhance is to support research and program development by the resident-oriented living laboratory systems in localities.