• Title/Summary/Keyword: Building Commissioning

Search Result 28, Processing Time 0.02 seconds

A Comparative Study on Management Evaluation and Re-certification System of G-SEED, BREEAM, LEED (국내외 녹색건축인증제의 유지관리 및 재인증 제도에 대한 비교 연구)

  • Hyun, Eun Mi;Kim, Yong Sik
    • KIEAE Journal
    • /
    • v.14 no.1
    • /
    • pp.121-129
    • /
    • 2014
  • As time passes, the aging of the plant building, the building's energy performance degradation than the initial plan does not express a situation could arise. This year, the certification of buildings certified in 2009 has expired for measures such as the situation required. In this study, management of national and international green building certification and re-certification was compared in two ways. First, the evaluation of green building certification system management assessments were compared. Second, the green building certification system for the re-certification analysis. As a result, G-SEED was not reflected life-cycle of building in management assessment and the commissioning of G-SEED is the UK and the U.S and other concepts of evaluation. In addition, the re-certification system is insufficient about substantial energy consumption of buildings. In this study, the revised the management assessments in conjunction with the re-certification system to manage the building is proposed to improve. In addition, the current evaluation of the existing building certification "existing building" and "building the first certified" as it is more efficient to separate the information into assessment was judged. Green building certification system to meet the purpose of management and operation, and disposal phases of the building to promote energy conservation and sustainability in order to the management a systematic and detailed evaluation and re-certification system developed for the revision of the specific items required and future research want to continue.

Importance of Preliminary Validation of Exterior Wall Thermal Resistance in the Evaluation Context of Building Energy Retrofit Projects (그린리모델링 성과 평가 관점에서 본 준공 시점 단열 성능 검증의 중요성)

  • Seungmin Lim;Soyeon Kim;Changoh Kang;Gain Kim;Jongyeon Lim
    • Land and Housing Review
    • /
    • v.15 no.2
    • /
    • pp.29-37
    • /
    • 2024
  • This study investigates the thermal conductivity and density of expanded polystyrene insulation materials collected from buildings under going energy retrofit projects. Due to the absence of initial thermal conductivity data, determining precise long-term patterns was challenging. Analysis based on design documents revealed that expanded polystyrene insulation maintained consistent performance over ten years. Notably, the thermal conductivity measurements of insulation samples of the same grade and age varied significantly. Additionally, the insulation density was found to be substantially below the standard specified in the design documents. The results of the experiment indicate that performance management during both construction and operation phases is lacking. It is crucial to apply building commissioning, which involves performance verification throughout the building's life cycle, to properly evaluate building energy performance improvements, such as building energy retrofit projects.

The Analysis on the Evaluation Items of Korea Green Building Certification Criteria by the Case Studies of Collective Housing (국내 공동주택 부문의 친환경건축 인증 평가 항목 및 사례 분석)

  • Kim, Chang-Sung
    • KIEAE Journal
    • /
    • v.13 no.2
    • /
    • pp.93-100
    • /
    • 2013
  • Many countries have made their best to protect the earth from global warming and to find solutions for the reduction of carbon dioxide emittion and energy consumption. Especially, buildings have emitted over 40% of carbon dioxide against whole quantities emitted to the earth. Therefore, the reduction of carbon dioxide emitted from buildings require to save the earth environment. Energy consumption of buildings in Korea has reached 24% of total energy quantities, and energy consumption of collective housing has been continuously increasing. So, Korea government has also executed the Green Building Certification Criteria(GBCC). The GBCC evaluates the 8 types of buildings - collective housing, office, school, etc - to certificate the green building. In this paper, the evaluation items of collective housing in GBCC were reviewed to be used as the reference data for future revisions by the case studies. According to the results of this study, current version of GBCC requires additional revisions about the evaluations of energy consumption monitoring, commissioning and existing building.

The Analysis of Evaluation Items of Korea Green Building Certification Criteria in Office Building - Focusing on the Case Study of Office Building Certificated by GBCC from 2010 to 2012 - (국내 업무시설 부문의 친환경건축물 인증 평가항목 분석 - 2010년~2012년 국내 친환경 인증 업무시설의 사례 분석을 중심으로 -)

  • Kim, Chang-Sung
    • Korean Institute of Interior Design Journal
    • /
    • v.22 no.2
    • /
    • pp.11-19
    • /
    • 2013
  • Korea Government have carried out various policies to save the Earth environment from global warming and environmental pollution. It has also executed the Green Building Certification Criteria(GBCC) in 2002. The GBCC of office building was executed in 2003 and was revised twice in 2010 and 2011. Concerns about green building construction were quite increasing to keep the building performances sustainable. The aims of this paper is to check the reliability of weighting factors and scoring difficulties in all assessment categories of GBCC and to suggest the amendment direction of the future assessment criteria for green building. For the study, the old and new version of GBCC were examined to present the revision direction of GBCC and the 10 cases certificated by the old and new version, respectively 5 were analysed to compare with the difficulties in obtaining the certification. According to the results of the study, the GBCC requires additional amendments about the assessment categories of the energy consumption monitoring and the building commissioning as required subjects in order to secure the building performances. In addition, the operation mamagement of the building need to be assessed more intensively.

The Analysis on the Assessment Categories of Korea Green Building Certification Criteria by the Case Studies of Educational Facilities (국내 학교시설의 친환경건축물 인증 평가항목 및 사례 분석)

  • Kim, Chang-Sung
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.20 no.2
    • /
    • pp.15-24
    • /
    • 2013
  • Concerns about green building construction were quite increasing around the world. Therefore, Korea Government has executed the Green Building Certification Criteria(GBCC) in 2002. The GBCC of educational facilities was executed in 2005 and was revised in 2010. The aim of this paper is to check the reliability of weighting factors in all assessment categories of GBCC and to suggest the future revision direction of GBCC. For the study, the old and current version of GBCC were examined and the 5 cases certificated by the old version were analyzed and reassessed by current version to compare with the differences of the two in obtaining the green building certification. According to the results of the study, the GBCC requires additional amendments about the assessment categories of the energy consumption monitoring and building commissioning as required subjects in order to secure the stable performances of building. In addition, the categories of building management need to be assessed more intensively and the certification criteria for existing building should be enacted as soon as possible.

Developing Optimal Pre-Cooling Model Based on Statistical Analysis of BEMS Data in Air Handling Unit (BEMS 데이터의 통계적 분석에 기반한 공조기 최적 예냉운전 모델 개발)

  • Choi, Sun-Kyu;Kwak, Ro-Yeul;Goo, Sang-Heon
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.26 no.10
    • /
    • pp.467-473
    • /
    • 2014
  • Since the operating conditions of HVAC systems are different from those for which they are designed, on-going commissioning is required to optimize the energy consumed and the environment in the building. This study presents a methodology to analyze operational data and its applications. A predicted operation model is to be produced through a statistical data analysis using multiple regressions in SPSS. In this model, the dependent variable is the pre-cooling time, and the independent variables include the power output of the supply air inverter during pre-cooling, the supply air set temperature during pre-cooling, the indoor temperature-indoor set temperature just before pre-cooling, supply heat capacity, and the lowest outdoor air temperature during non-cooling/non-heating hours. The correlation coefficient R2 of the multiple regression model between the pre-cooling hour and the internal/external factors is of 0.612, and this could be used to provide information related to energy conservation and operating guidance.

Requirement Analysis for Development of EVMS in Nuclear Power Plant (원전건설 성과관리시스템(EVMS) 개발을 위한 요건 분석)

  • Won, Seo-Kyung;Park, Weon-Seob;Chong, Young-Whan;Kim, Jae-Yong;Kim, Yun-Myung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.271-272
    • /
    • 2013
  • The Korean nuclear industry acquired technology for each construction stage including engineering, procurement, construction and commissioning from advanced nuclear countries. While the levels of technology and quality have greatly improved, the same cannot be said for the level of project management. In particular, the level of project performance measurement and forecasting project risk still remain at the single project management level. Thus, this paper reviewed the concept of the EVMS method and requirement for the system. The adoption of the EVMS, an advanced project management method, can enable efficient management of project risks and promote an adequate environment for project implementation.

  • PDF

Forecasted Weather based Weather Data File Generation Techniques for Real-time Building Simulation (실시간 빌딩 시뮬레이션을 위한 예측 기상 기반의 기상 데이터 파일 작성 기법)

  • Kwak, Young-Hoon;Jeong, Yong-Woo;Han, Hey-Sim;Jang, Cheol-Yong;Huh, Jung-Ho
    • Journal of the Korean Solar Energy Society
    • /
    • v.34 no.1
    • /
    • pp.8-18
    • /
    • 2014
  • Building simulation is used in a variety of sectors. In its early years, building simulation was mainly used in the design phase of a building for basic functions. Recently, however, it has become increasingly important during the operating phase, for commissioning and facility management. Most building simulation tools are used to estimate the thermal environment and energy consumption performance, and hence, they require the inputting of hourly weather data. A building simulation used for prediction should take into account the use of standard weather data. Weather data, which is used as input for a building simulation, plays a crucial role in the prediction performance, and hence, the selection of appropriate weather data is considered highly important. The present study proposed a technique for generating real-time weather data files, as opposed to the standard weather data files, which are required for running the building simulation. The forecasted weather elements provided by the Korea Meteorological Administration (KMA), the elements produced by the calculations, those utilizing the built-in functions of Energy Plus, and those that use standard values are combined for hourly input. The real-time weather data files generated using the technique proposed in the present study have been validated to compare with measured data and simulated data via EnergyPlus. The results of the present study are expected to increase the prediction accuracy of building control simulation results in the future.