• Title/Summary/Keyword: Block plan

Search Result 281, Processing Time 0.022 seconds

Maxillary Anterior Implant Placement with Various Bone Agumentation on Atrophic Thin Ridge : Case Reports (다양한 골증대술을 동반한 상악전치부 임플란트 식립 증례)

  • Chee, Young-Deok;Jo, I-Su
    • Journal of Dental Rehabilitation and Applied Science
    • /
    • v.23 no.2
    • /
    • pp.145-155
    • /
    • 2007
  • The advent of osseointegration and advances in biomaterials and techniques have contributed to increased application of dental implants in the restoration of maxillary partial edentulous patients. Often, in these patients, soft and hard tissue defects result from a variety of causes, such as infection, trauma, and tooth loss. These create an anatomically less favorable foundation for ideal implant placement. Reconstruction of the atrophic maxillary alveolar bone through a variety of regenerative surgical procedures has become predictable; it may be necessary prior to implant placement or simultaneously at the time of implant surgery to provide a restoration with a good long-term prognosis. Regenerative procedures are used for horizontal and vertical ridge augmentation. Many different techniques exist for effective bone augmentation. The approach is largely dependent on the extent of the defect and specific procedures to be performed for the implant reconstruction. It is most appropriate to use an evidenced-based approach when a treatment plan is being developed for bone augmentation cases. The cases presented in this article clinically demonstrate the efficacy of using a autogenous block graft, guided bone regeneration, ridge split, immediated implant placement technique on the atrophic maxillary area.

Structural Design of High-Rise Building in Toranomon-Azabudai Project (A Block)

  • Kazumasa, Okabe;Kai, Toyama;Takuya, Furuta;Jyunichi, Yamashita;Hiroki, Mukai;Takahiro, Goseki;Shingo, Masuda;Dai, Shimazaki;Yusuke, Miyagi;Yuji, Ozawa
    • International Journal of High-Rise Buildings
    • /
    • v.11 no.3
    • /
    • pp.157-170
    • /
    • 2022
  • This paper explains about structural planning and structural design of the high-rise building in Toranomon-Azabudai Project (A Block) which is now under construction. The building is about 330 meters high, has 4.2 aspect ratio, and the outline of the building has shallow curve. We adopted seismic response control structure. The building is a steel rigid frame structure with braces, and it has enough stiffness to obtain its primary natural period to be less than about seven seconds, in consideration of wind response, seismic response and inhabitability for the wind shaking. In terms of business continuity plan, the building has a high seismic performance; value of story drift angle shall be 1/150 or less and members of the building remain almost undamaged while or after a large earthquake. Active mass dumper shall be installed at the top of the building to improve inhabitability while strong wind is blowing.

Development of Puzzle Game Contents combining Tangram and Tetris Blocks (칠교놀이와 테트리스 블록을 융합한 퍼즐게임 콘텐츠 개발)

  • Lee, Jun- Hyeok;Jin, Hwa-Su;Song, Eun-jee
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2021.10a
    • /
    • pp.364-365
    • /
    • 2021
  • In this paper, we study and develop content for a puzzle game that can be enjoyed lightly with appropriate rules us ing Chilgyo-Nori blocks and Tetris blocks. We plan and develop puzzle games with low entry barriers and high revisit rates from the perspective of client indie game developers who are away from mass-produced games that additionally r equire specific items in a specific game section by focusing on the commercialization of game contents. The implement ed game promotes the creativity of users based on the possibility of creating more 2D designs than the existing Chilgy o-nori by using the Tetris block and the Chilgyo-nori block at the same time.

  • PDF

Electric Field Strength and Shielding Effectiveness Comparison According to the Size of Shielding Facility (방호 시설 크기에 따른 전계강도 및 차폐 효과 비교)

  • Kang, Ho-Jae;Huh, Chang-Su;Bang, Jeong-Ju;Choi, Jin-Su;Park, Woo-Chul
    • Journal of the Korean Institute of Electrical and Electronic Material Engineers
    • /
    • v.27 no.4
    • /
    • pp.221-225
    • /
    • 2014
  • In modern times, threat of high power electromagnetic wave is increasing. When the electrical grid and communication network are attacked by these high power electromagnetic wave, the whole infrastructure is paralyzed. To protect the infrastructure from these high power electromagnetic wave threat, the shielding facility that can block high power electromagnetic wave is constructed. Also shielding effectiveness evaluation about the constructed facility is important. But, because of space efficiency and saving of construction cost to construct the actual shielding facility, the shielding room wall is generally adjacent to exterior concrete structures. As space between shielding facility wall and concrete structures is very small, arranging the transmitting antenna exterior shielding facility is realistically difficult. Therefore, in this research, The shielding effectiveness measurement plan in the state of exterior narrow space of HEMP shielding facility is presented. And to apply this plan, The influence of shielding effectiveness according to the size of the shielding facility is analyzed.

A Study on the Improvement of Public Office Facilities on Composition of Space and Service Offering Aspects (공간구성 및 복지지원 서비스 측면에서 살펴본 공공업무시설의 시설적·제도적 개선 방안 - 전국 44개 시청 및 구청의 실태조사를 통하여 -)

  • Yun, Young-Sam;Lee, In-Kee;Kang, Byoung-Keun;Kim, Sang-Woon;Seong, Ki-Chang;Park, Kwang-Jae
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.12 no.2
    • /
    • pp.79-91
    • /
    • 2006
  • The purpose of this study is to suggest institutional reformation of public office facilities by analysis the status of services on welfare for the aged and disabled. For this study, we have researched and analyzed on two different aspects. The aspects are space composition of public office facilities, welfare systems and service support within region. And we can get the following important points as conclusion; (1) We need to consider on not only access for public office facilities site but also the connection on business such as block plan on zone and connection between quarters. Architectural plan has to be considered. (2) Most of the public office facilities use human service resources as a supporting system for shortage of convenient facilities. Variety of welfare services are required. (3) We need to secure various programs and space for local peculiarities and social demand.

  • PDF

A Study on Establishment of Signaling Systems to Speed up Conventional Railway (철도 고속화에 따른 단계별 신호시스템 구축방안 연구)

  • Jeong, Rag-Kyo;Yoon, Young-Ki;Kim, Baek-Hyun
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.60 no.9
    • /
    • pp.1715-1720
    • /
    • 2011
  • Studies suggested an increase in the competitiveness and roles of mainline railways like speed and accessibility improvement, as a fundamental direction of the National Transport Network Plan. At this point, topics presented especially for strengthening the role of human and environment centered transportation: as to the greatly improved speed competitiveness, there are an operational speed above 180km/h ~ 200km/h and traveling within 2 ~ 3 hours among big cities. As to accessibility improvement, there are accessibility to main railway stations within 30 minutes, and the improvement of accessibility, safety, eco-friendliness, amenity etc. As a part of these suggestions, field specific plans were proposed for the establishment of expressed mainline railway network in Korea such as train's, civil structures, trolley lines etc. In this paper we analyzed the conventional lines and systems to figure out whether to change details in terms of H/W of signaling system. Additionally, we reviewed the compatibility or difference of signalling system depending on train's speed. With this result, we deduced the number of virtual blocks specific to the speed of 180km/h, 200km/h and 230km/h, which were showed for the speed improvement considering each variable like blocks, braking distance etc. In this way, we suggested the railway signal system establishment plan considering safety operation.

Trend of Research on Shared Space in Apartment Complexes of Korea (집합주택내 주민공유공간의 국내연구 경향 분석)

  • Yim, Jungeun;Lee, Yeunsook
    • KIEAE Journal
    • /
    • v.5 no.4
    • /
    • pp.25-32
    • /
    • 2005
  • In apartment complexes of Korea shared space becomes more and more important since it promotes social relationship among neighbors and also as a ecological point of view. After the Green Building system was introduced in the society, it attracted more attentive as an essential component for sustainable community. Now, it's expected the shared space plan or the community center plan will be a hot issue in the society. Therefore, we could see an aspect of the gradual change related to housing culture in Korea and make a prediction how to develop the shared space as researching domestic leading studies about the 'shared space'. The purpose of this study is to identify the trend of academic achievement as shared spaces. 14 books and 43 studies are searched and each of them are divided into according to the subject. The concept of the shared space was introduced in a holistic moment and the design plans were presented in books in the early 1990's, and total community center it was introduced. The studies are naturally divided into 4 parts as time passed that are characteristics of the block planning in the complex, the needs of the shared space, the actual condition of the using shared space, and the case studies of the shared space. The shared spaces under the structure of the community center are expected to be developed in a more elaborate way to cope with increasingly well-being needs.

COMPLICATIONS ASSOCIATED WITH DENTAL IMPLANT SURGERY; CASE REPORT (임플란트 수술 시의 합병증; 증례 보고)

  • Lee, Hyun-Jin;Yeo, Duck-Sung;Lim, So-Yeon;An, Kyung-Mi;Sohn, Dong-Seok
    • Journal of the Korean Association of Oral and Maxillofacial Surgeons
    • /
    • v.33 no.2
    • /
    • pp.173-180
    • /
    • 2007
  • According to the increase in use of implants in clinical dentistry, new kinds of complications happen. Complications that can happen during implant placement are bleeding, nerve injury, jaw fracture, fenestration of maxillary sinus or nasal cavity, dehiscence, fenestration, injury of adjacent tooth. And complications that can happen after implant operation are infection, bleeding, hematoma, chronic sinusitis, peri-implantitis. Problems that are confronted during implant placement happen by inadequate preoperative treatment plan, inadequate consideration about individual anatomic difference, inadequate operation process and lack of experience of clinician. It is important that clinicians consider possible complications in advance and make a comprehensive treatment plan. We report the patient who was happened ramus fracture during block bone harvesting from ramus of severely atrophic mandible, the patient who came to emergency ward due to postoperative swelling and bleeding and the patient whose implant was migrated to maxillary sinus with a review of literature.

Daylighting Performance of Refurbished Window System based on Site Plans in Recently-Planned Apartment Houses (공동주택의 배치유형에 따른 창호 시스템의 채광특성)

  • Kim, Gon;Roh, Ji-Woong
    • KIEAE Journal
    • /
    • v.8 no.1
    • /
    • pp.37-44
    • /
    • 2008
  • Though they have advantages in terms of aesthetic in modern architecture, however, rectangular-shaped towers causes being short of natural light due to deep interior space. There are compromised attempts to take advantages of each building shape selectively. As a result, we now witness the advent of Y-shaped, T-shaped, V-shaped and ㅈ-shaped buildings on the market. The mutative type of apartment houses usually faces southwest or southeast, which has lot of daylighting availability but anyhow, the proportion of the apartment houses which have a full south aspect. The need to verify the potential of daylighting in new building-block shapes exists. At the same time, the expansion of balcony area was legalized and thus, a visual buffer area does not exist any more. All-glass window wall on apartment houses without a balcony produces pretty harmful area with direct sunbeam. Recently, the refurbished version of conventional windows has been developed for the purposed of minimizing energy loss occurred around windows. This research initialized a series of research to deal with almost all on window wall for apartment houses. First of all, huge amount of already-designed examples of apartment houses have been analyzed in terms of floor plan, elevation, orientation and glazing materials.

The signal system operation plan research for a Tilting train introduction (국내 틸팅열차 도입을 위한 신호시스템 운영방안 연구)

  • Lee, Hoon-Koo;Lee, Nam-Hyeong;Lee, Soo-Hwan;Lee, Young-Ho;Baek, Jong-Hyen
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.1999-2004
    • /
    • 2009
  • Since 2003, the domestic ground signalling system of the Kyeongbu and Honam lines has been steadily improving with the introduction of the ATP system and application of the system to the train is actively being pursued for 2009 target. Therefore, new ground signalling systems are being installed to the trains and track conditions to control the train speed to a maximum of either 80km/h, 120km/h, 150km/h, or 160km/h. As well, considering safe breaking distance, block signalling has been installed and also the change over times of the track switching device has been adjusted according to the train speed. Since the new Tilting trains will be running faster than present trains, at speeds over 180 km/h, we anticipate that there will be problems with present signalling facilities. Therefore this paper attempts to examine the various problems with the interface between the ATP signalling system and the new Tilting trains and also it will propose the most effective operating plan based upon case studies of successful foreign operations.

  • PDF