• Title/Summary/Keyword: Bill of Quantities

Search Result 16, Processing Time 0.022 seconds

A Case Study on Improvement for Optimal Organization of Work Items in Construction Bill of Quantities (건축공사 내역서 세부항목 구성에 대한 사례연구)

  • Noh, Hae-Ra;Yun, Seok-Heon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.10a
    • /
    • pp.67-68
    • /
    • 2016
  • In construction management, BoQ(Bill of Quantities) has been commonly used for the cost estimation. However, many problems have been recognized about the work items used in the BoQ that could be varied by the experience and knowledge of the estimators or the project. Also, there are lots of work items that have to be written in BoQ even though the cost proportion of those items is relatively lower than the others. In this study we consider the way how to organize optimally the work items through the analysis of case. The results of this study could be useful for improving the efficiency of preparing construction BoQ and conducting Quantity take-off in our construction management practices.

  • PDF

A Study on the Simplification for Quantity Bill Writing and Structure in the Electrical Extension Field (내선분야 내역서 작성 및 체계 간소화 방안 고찰)

  • Hyun, So-Young;Kim, Gwang-Gon;Park, Min-Young;Choi, Seung-Dong
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.61 no.1
    • /
    • pp.173-178
    • /
    • 2012
  • The quantity bill writing of organized electrical construction can be an effective to quality and process management in the construction. Therefore, in order to overcome confusion of the construction and doing an effective work, the clearly quantity bill writing is need. This paper is a focused to solve a problem of existing quantity bill as the difference in terms of work section and item information, regulatory information of ordering authority. Therefore, a terms of work section and item information, regulatory information of ordering authority has been normalized. Moreover, basic data of simplification for quantity bill writing and structure has been guaranteed.

Improvement of Bill of Quantities of Door and Window Work for BIM-based Cost Estimation (BIM 기반 견적을 위한 창호공사 내역 작성체계 개선 방안)

  • Kim, Mi-Hyeon;Jo, Chan-Won;Yun, Seok-Heon
    • Journal of KIBIM
    • /
    • v.10 no.2
    • /
    • pp.12-20
    • /
    • 2020
  • Recently, interest in BIM technology has been growing in the domestic construction market as the number of construction projects requiring the application of BIM technology has increased. The use of BIM allows the use of various visualization functions through 3D models as well as drawing interference review, quantity calculation and integrated management of information. In particular, estimates of construction costs based on BIM can increase work efficiency by reducing the burden of calculating construction costs and managing them. In order to increase the efficiency of BIM-based cost estimates, it is necessary to improve the correlation between the BoQ(Bill of Quantity) information and the BIM model. For this purpose, the ratio of the amount and item to the detailed construction of the current BoQ was analyzed, especially the problem of the calculation of construction cost in the window work in this study. In addition, we would like to suggest a method for systematically linking the BoQ information with the BIM model by improving the BoQ information structure of the window work. It is expected that this will increase the efficiency of the quantity calculation and analysis work of construction cost of window work. In addition, it is expected that this method will help to analyze and predict changes in construction cost of windows and doors by facility characteristics and type.

Apartment house project cost schedule for integrated management BIM-based BoQ application plan (공동주택 프로젝트 비용일정통합 관리를 위한 BIM 기반 BoQ 구축 및 활용 방안)

  • Zheng, Lianyi;Kim, Woong-Gi;Ham, Nam-Hyuk;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.11 no.2
    • /
    • pp.1-16
    • /
    • 2021
  • Since entering the 21st century, the construction industry has developed faster and faster, and more and more technologies have been applied in the construction industry. BIM technology (Building Information Modeling) was born in this environment. The application of BIM technology can greatly improve the efficiency of cost management and help achieve the goal of cost management. But through BIM to realize project cost management, there is still no good solution. In order to solve this problem, this paper puts forward the concept of WBS structure applied to construction projects by studying the BoQ (Bill of Quantities) list based on BIM, and proposes the numbering method of the structure. The WBS (Work Breakdown Structure) structure proposed in this paper divides more than 5000 cost objects into 133 projects according to the type of work and project schedule. This structure helps to realize the application of BIM in project cost management. Although this article has studied more than 5000 data of three projects, it does not think that it can cover all cost objects in the existing construction industry. The purpose of this article is to propose a solution for cost and Process Control using BIM-based BoQ data.

Comparative Analysis on Productivity Data and Cost Estimate System of Road Bridge Construction in Korea and China (한국 및 중국 도로교량공사의 생산성자료 및 예정가격 산정시스템 비교분석)

  • Chang, Cheng;Huh, Youngki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.3
    • /
    • pp.39-47
    • /
    • 2020
  • There are two kinds of cost estimate system in construction in china. Quota valuation model is a traditional cost estimate system under the unity of quantity and price, which is easier and has been used for decades. But the Quota valuation model becomes increasingly unsuited to the needs of society with the development of market economy. To meet the needs of China's market economy development and construction works in the field of international cooperation, the Bill of Quantities valuation model was introduced in 2003. However, there are still many shortcomings and deficiencies in the course of implementation of Bill of Quantities valuation model. In addition, interest in the Chinese construction market continues to increase in Korea due to the recent new North Korean policy and China's the Belt and Road policy. This paper aims to examine the cost estimate system of public construction works in China, and to provide basic data for deriving future improvement plans by comparing and analyzing it with standard cost estimate system in Korea.

Estimation Method of Waste Amount from Materials to Develop Generation Rates of Construction Waste in New Apartment Construction Sites: Focused on Bill of Quantities for Architectural Works (신축아파트 현장의 건설폐기물 발생원단위 개발을 위한 자재별 폐기물 수량 예측 방법: 건축공사 내역서의 투입 물량을 중심으로)

  • Jung, Jong-Suk;Song, Sang-Hoon;Park, Seong-Sik;Lee, Seok-Je
    • Land and Housing Review
    • /
    • v.5 no.1
    • /
    • pp.41-51
    • /
    • 2014
  • The amount of new apartment construction has been trending upward in 3~4% each year since 11% increase in 2002. Currently, in public apartment construction sites under separate delivery system for construction waste processing, the significant difference between estimated quantity for contract and actual amount frequently causes severe controversy among project participants. Many factors such as poor environmental management, inadequate contractual amount are assumed to influence the above problem, and the requirement to revise existing generation rates, the key criteria applied in estimating the quantities of waste, is increasing. Most of generation rates were established in early 2000's, and have difficulty in reflecting the changes from new materials and technologies accordingly. Therefore, this study aims to clarify the types of construction waste for each trade and the forecast method as preliminary work in order to develop more accurate generation rates for construction waste in new construction. To achieve this purpose, the architectural bills of quantities in ten apartment projects executed during 2010~2013 were collected, and the possible waste types and reasonable material loss ratio for each item from temporary works to owner-supplying material area were defined and compared through the workshops and interviews with the experts and on-site environmental managers. The results of this study will contribute to establishing the categories of construction waste for construction trades and proper generation rates by the indirect estimation method in new apartment construction in the follow-up study.

Risk Analysis in Tender Stage for Successful Construction Project in China (중국건설시장에서의 성공적인 발주를 위한 입찰단계 리스크 분석)

  • Liu, Yue-Fei;Oh, Jae-Hun;Huh, Young-ki
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.140-141
    • /
    • 2015
  • Although the depression of oversea construction market becomes more serious recent years, asian construction market is relatively dynamic, particularly in china. However, few research has been conducted about how to manage construction projects in china as foreign developers. Four important risks are identified from series of surveys using the WBS-RBS method, the result shows that the main risk of tender stage is 'Tender max price error', ' Bill of quantities error', 'Unusual low price' and 'Moral risk' respectively.

  • PDF

Methods for Quantitative Disassembly and Code Establishment of CBS in BIM for Program and Payment Management (BIM의 공정과 기성 관리 적용을 위한 CBS 수량 분개 및 코드 정립 방안)

  • Hando Kim;Jeongyong Nam;Yongju Kim;Inhye Ryu
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.36 no.6
    • /
    • pp.381-389
    • /
    • 2023
  • One of the crucial components in building information modeling (BIM) is data. To systematically manage these data, various research studies have focused on the creation of object breakdown structures and property sets. Specifically, crucial data for managing programs and payments involves work breakdown structures (WBSs) and cost breakdown structures (CBSs), which are indispensable for mapping BIM objects. Achieving this requires disassembling CBS quantities based on 3D objects and WBS. However, this task is highly tedious owing to the large volume of CBS and divergent coding practices employed by different organizations. Manual processes, such as those based on Excel, become nearly impossible for such extensive tasks. In response to the challenge of computing quantities that are difficult to derive from BIM objects, this study presents methods for disassembling length-based quantities, incorporating significant portions of the bill of quantities (BOQs). The proposed approach recommends suitable CBS by leveraging the accumulated history of WBS-CBS mapping databases. Additionally, it establishes a unified CBS code, facilitating the effective operation of CBS databases.

Priority Derivation of Modular House Cost Reduction Factors through Case Analysis (시공사례 분석을 통한 모듈러 주택 원가절감 우선순위 항목 도출)

  • Ryu, Kuk-Mu;Moon, Ye-Ji;Cho, Byoung-Hoo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.66-67
    • /
    • 2016
  • Modular construction is attracting attention as the solution of recent problems in construction site. Such as lack of construction workforce, increasing labor costs, work delay due to extreme weather events and strengthening government regulations. However, despite the many advantages, Modular construction has not been activated dueto high construction costs compared to other construction methods. Accordingly, the object of this study is priority derivation of prefabricated house cost reduction factors and use as basic research data. For research performance, we have analyzed the blueprint and bill of quantities of a modular construction based public dormitory which was built in 2013. In result, the proportion of modular construction and on-site construction is 66% and 34%, and the construction cost proportion by activity was devided in to construction(79%), machinery(7%), electricity(5%) and civil(9%). Among these results in order to reduce costs, interior finishing(19.4) steel-frame(16.9%), metal works(13.5%), RC(11.8%), joinery(7.3%) is the order requires focused management.

  • PDF

A Method to Build Daily Progress Management Model based on BIM Estimate Data in Construction Phase (BIM 기반의 시공단계 견적데이터를 활용한 일일 진도관리모델 구축 방안)

  • Jung, Jun-Ho;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.5
    • /
    • pp.23-34
    • /
    • 2011
  • Reliable progress management at construction requires integrated information of cost and schedule, and information is used as a basis for project performance measurement. However, separate handling of cost and schedule information at construction projects makes objective measurement more difficult and decreases management productivity due to additional works for breaking down bill of quantities into corresponding activities. Recently, research related to BIM addresses issues on effective progress management based on BIM with incorporation of daily progress management. Therefore, the objective of this paper is to propose information model for daily progress rate and budgeted cost of work performed by utilizing BTM-based quantity and location information.