Effects of an Engineering-Focused STEAM Program Based on the Project Approach for Young Children on Their Scientific Inquiry Ability, Mathematical Problem-Solving Ability, and Creativity (유아 대상 프로젝트 접근법 기반 공학적 STEAM 프로그램이 유아의 과학적 탐구능력, 수학적 문제해결력, 창의성에 미치는 효과)

  • Kwangjae Yu;Jihyun Kim
    • Korean Journal of Childcare and Education
    • /
    • v.19 no.4
    • /
    • pp.29-52
    • /
    • 2023
  • Objective: This research aims to examine the effect of a young children's engineering-focused STEAM program based on the project approach - a program that constructs components aligned with children's interests in their play through an engineering design process - on their scientific inquiry ability, mathematical problem-solving ability, and creativity. Methods: In this research, 42 five-year-old children from a public kindergarten in S district, I city, were randomly divided into experimental and comparative groups, each with 21 children. The engineering-focused STEAM program was conducted from April 18 to June 10, 2022, with the experimental group exploring the 'car' theme and the comparison group focusing on a different theme. The study employed an independent sample t-test and analysis of covariance(ANCOVA), using the pretest as a covariate to control variables. Results: The children-selected 'cars' themed engineering-focused STEAM program was effective in enhancing their scientific inquiry ability, mathematical problem-solving ability and creativity. Conclusion/Implications: The engineering-focused STEAM program, which emerges from young children's interesting daily play, had positive effects on enhancing their scientific inquiry ability, mathematical problem-solving ability, and creativity. This research can serve as fundamental data for developing education programs focused on engineering within the STEAM framework, guided by children's emergent play.

Prediction and Evaluation of Schedule Exceptions on the EPC Projects of Overseas Plants (플랜트 프로젝트 일정위험 예외상황 예측 및 평가)

  • Sung, Hongsuk;Jung, Jong-yun;Park, Chulsoon
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.39 no.4
    • /
    • pp.72-80
    • /
    • 2016
  • The market size of plant projects in overseas is so large that domestic EPC project contractors are actively seeking the overseas projects and then trying to meet completion plans since successful fulfillment of these projects can provide great opportunities for them to expand into new foreign markets. International EPC projects involve all of the uncertainties common to domestic projects as well as uncertainties specific to foreign projects including marine transportation, customs, regulations, nationality, culture and so on. When overseas project gets off-schedule, the resulting uncertainty may trigger unexpected exceptions and then critical effects to the project performance. It usually require much more time and costs to encounter these exceptions in foreign sites compared to domestic project sites. Therefore, an exception handling approach is required to manage exceptions effectively for successful project progress in foreign project sites. In this research, we proposed a methodology for prediction and evaluation of exceptions caused by risks in international EPC projects based on sensitivity analysis and Bayesian Networks. First, we identified project schedule risks and related exceptions, which may meet during the fulfillment of foreign EPC projects that is performed in a sequence of engineering, procurement, preparatory manufacture, foreign shipping, construction, inspection and modification activities, and affect project performance, using literature review and expert interviews. The impact of exceptions to the schedule delay were also identified. Second, we proposed a methodology to predict the occurrence of exceptions caused by project risks and evaluate them. Using sensitivity analysis, we can identify activities that critically affect schedule delay and need to focus by priority. Then, we use Bayesian Networks to predict and evaluate exceptions. Third, we applied the proposed methodology to an international EPC project example to validate the proposed approach. Finally, we concluded the research with the further research topics. We expect that the proposed approach can be extended to apply in exception management in project management.

Development of a Heuristic Algorithm Based on Simulated Annealing for Time-Resource Tradeoffs in Project Scheduling Problems (시간-자원 트레이드오프 프로젝트 스케줄링 문제 해결을 위한 시뮬레이티드 어닐링 기반 휴리스틱 알고리즘 개발)

  • Kim, Geon-A;Seo, Yoon-Ho
    • The Journal of Information Systems
    • /
    • v.28 no.4
    • /
    • pp.175-197
    • /
    • 2019
  • Purpose This study develops a heuristic algorithm to solve the time-resource tradeoffs in project scheduling problems with a real basis. Design/methodology/approach Resource constrained project scheduling problem with time-resource tradeoff is well-known as one of the NP-hard problems. Previous researchers have proposed heuristic that minimize Makespan of project scheduling by deriving optimal combinations from finite combinations of time and resource. We studied to solve project scheduling problems by deriving optimal values from infinite combinations. Findings We developed heuristic algorithm named Push Algorithm that derives optimal combinations from infinite combinations of time and resources. Developed heuristic algorithm based on simulated annealing shows better improved results than genetic algorithm and further research suggestion was discussed as a project scheduling problem with multiple resources of real numbers.

Minimizing Project Quality Costs by Activity-Based Prevention (활동기준예방에 의한 프로젝트 품질코스트 최소화)

  • Kim, Jong-Yul;Kang, Chang-Wook;Hwang, In-Keuk
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.34 no.4
    • /
    • pp.89-97
    • /
    • 2011
  • Traditional quality control for manufacturing or service sector is not suitable for the quality control of a project as the project is one-time task constrained by time, cost, and quality. To meet the internal and external customers' requirements, quality costs approach to the project will be effective. Hence, we propose PONC (price of nonconformance) estimation procedure and a mathematical model, which are focused on activity-based prevention in the execution step and warranty step of EPLC (extended project life cycle). This procedure and model will help project manager develop preventive action plan for project quality costs minimization from nonconformance risk activities and PONC estimates information.

Managing Mega-Project Complexity in Five Dimensions

  • Gransberg, Douglas D.;Jeong, H. David
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.6-9
    • /
    • 2015
  • Traditional project management theory is based on a three-dimensional life cycle approach where the project managerseeks to optimize the dimensions of cost-schedule-technical (quality or design). This paper reports the findings of a case study analysis of two complex mega-projects in Michigan which confirm the findings of previous research and illustrates the use of a framework for five-dimensional project management (5DPM) that is for conceptualizing a complex project's scope of work. The framework elevates the recognition that the project's social/political context and the financial arrangements create complexity adding two new dimensions. This paper also demonstrates a methodology to graphically display a project's complexity to better understand and prioritize the available resources. The result is a "complexity footprint" that may help a complex project manager identify the boundary between controllable and uncontrollable projects impacts. The paper finds that applying 5DPM to the two case study projects has given the project delivery team a tool which is actually adding value to the complex project management process.

  • PDF

Evaluation Method of Technology Development Project based on Decomposition Approach and Options Thinking (분해접근과 옵션사고에 기반한 기술개발 프로젝트의 평가방법)

  • Cho Kyu-Kab;Moon Byung-Keun
    • Journal of Korea Technology Innovation Society
    • /
    • v.8 no.3
    • /
    • pp.1117-1138
    • /
    • 2005
  • Due to the increasing importance of technology development project evaluation, many evaluation methods have been developed. However, most project evaluation methods are not directly applicable for evaluating performance improvement projects in a manufacturing system. It is due to the fact that the existing project evaluation methods do not deal with the performance evaluation of the system. This paper deals with performance measurement model of a manufacturing system based on decomposition method and evaluation method for technology development project based on options thinking. A case example is discussed to illustrate the process of the proposed evaluation method.

  • PDF

Analysis of Learning Experience on Team-based Technology Design Project of Non-Engineering Students

  • KIM, Insu
    • Educational Technology International
    • /
    • v.15 no.2
    • /
    • pp.201-215
    • /
    • 2014
  • The design project of a technology product provides an opportunity for students to experience the inter-connectedness of academic information and ill-defined real-world problems. This study focuses on non-engineering students' activity and perception through the assistive technology design project. For this purpose, participants engaged in a team-based technology design project. Then, a qualitative research approach was adopted, which included reflective journals with 24 undergraduate students majored in Adaptive Physical Education. The analysis identified six factors (knowledge value, social value, reality value, accomplishment value, perspective value, benefit value) of perception and five stages (topic selection, function suggestion, visualization, presentation preparation, and presentation) of activity.

A Study on the Application System of the Systems Engineering for the Railway Total Safety Project (철도종합안전프로젝트를 위한 시스템엔지니어링 적용 체계 연구)

  • Choi Yo-Chul;Cho Yun-Ok
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.4 s.35
    • /
    • pp.487-492
    • /
    • 2006
  • This paper presents the Case of Systems Engineering Application for the Railway Total-Safety Project. Key points to consider for project are: 1) Establish the SE Based-Project organization system, 2) Define the SE Activities, 3) Manage technically the SE Based-Project, etc. They were of much help that the Railway Total-Safety Project which were efficiently implemented and managed. As I take it, the Systems Engineering is very reasonable approach for the systematical and technical conduct of a project.

QUANTITATIVE ANALYSIS ON PROJECT PERFORMANCE ANALYSIS AND DELIVERY METHODS

  • Seta Ohanesian;Jin-Lee Kim;Tang-Hung Nguyen;Ok-Kyue Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.332-337
    • /
    • 2013
  • Various project delivery methods have been utilized by owners over the years to maximize project performance. The design-build delivery method is being increasingly used due to the advantages it can offer to an engineering construction industry. Numerous studies have advocated the use of design/build over the traditional design/bid/build delivery approach. This study represents comprehensive analysis of 40 projects from the construction industry and shows that design/build method may not provide all the benefits to project performance. This study found timesaving was a definitive advantage of design/build project delivery, but the positive effects of cost changes was not convincing. Based on the results of the study, the project management expertise and experience of the contractor may have a greater impact on project performance outcomes than focusing on project delivery strategy only.

  • PDF

Project Performance Improvement of Employees: A Psychological Empowerment Approach

  • Oh, Sung-Tae;Kim, Sodam;Kim, Hee-Woong
    • Asia pacific journal of information systems
    • /
    • v.26 no.4
    • /
    • pp.509-525
    • /
    • 2016
  • According to the dynamic changes in the business environment, the structural transformation of firms has had an observable trend. An increasingly large number of firms have been transforming into either project-based organizations or project expert groups. This study aims to investigate the antecedents required for the optimal level of empowerment with consideration of the project-based team environmental nature and job characteristic. Three factors are applied to measure the significant effects on psychological empowerment as the result variables. To determine the antecedents and consequent factors of psychological empowerment, employees' interviews and precedent studies are used. For the empirical study, four determinants of empowerment variables are modeled into a second-order reflective construct. This study finds that psychological empowerment significantly affects performance. Therefore, this study can serve as a guideline for development and operating methods for project success.