References
- 김준우. "Job Shop 일정계획 문제 풀이를 위한 유전 알고리즘의 복호화 방법". 정보시스템연구, 25(4), 2016, pp105-119.
- 정성욱, & 김준우. "후보순위 기반 타부 서치를 이용한 제약 조건을 갖는 작업 순서결정 문제 풀이" 정보시스템연구, 25(1), 2016, pp159-182.
- Bell, C. E., & Park, K., "Solving resource - constrained project scheduling problems by a* search." Naval Research Logistics (NRL), 37(1), 1990, pp. 61-84. https://doi.org/10.1002/1520-6750(199002)37:1<61::AID-NAV3220370104>3.0.CO;2-S
- Blazewicz, J., Lenstra, J. K., & Kan, A. R., "Scheduling subject to resource constraints: classification and complexity." Discrete applied mathematics, 5(1), 1983, pp. 11-24. https://doi.org/10.1016/0166-218X(83)90012-4
- Christofides, N., Alvarez-Valdes, R., & Tamarit, J. M., "Project scheduling with resource constraints: A branch and bound approach." European Journal of Operational Research, 29(3), . 1987. Pp. 262-273. https://doi.org/10.1016/0377-2217(87)90240-2
- Ciesielski, V., & Scerri, P., "Real time genetic scheduling of aircraft landing times." In 1998 IEEE International Conference on Evolutionary Computation Proceedings. IEEE World Congress on Computational Intelligence (Cat. No.98TH8360), 1998, May, pp. 360-364
- De Reyck, B., Demeulemeester, E., & Herroelen, W., "Local search methods for the discrete time/resource trade-off problem in project networks." Naval Research Logistics (NRL), 45(6), 1998, pp. 553-578. https://doi.org/10.1002/(SICI)1520-6750(199809)45:6<553::AID-NAV2>3.0.CO;2-1
- Demeulemeester, E., & Herroelen, W., "The discrete time/resource trade-off problem in project networks: a branch-andbound approach". IIE transactions, 32(11), 2000, pp. 1059-1069. https://doi.org/10.1080/07408170008967461
- Dewi, D. S., & Septiana, T., "Workforce scheduling considering physical and mental workload: a case study of domestic freight forwarding." Procedia Manufacturing, 4, 2015, pp. 445-453. https://doi.org/10.1016/j.promfg.2015.11.061
- Hong, K. S., & Leung, J. T., "On-line scheduling of real-time tasks." In Proceedings. Real-Time Systems Symposium, IEEE, 1988, December, pp. 244-250.
- Icmeli, O., & Erenguc, S. S., "A tabu search procedure for the resource constrained project scheduling problem with discounted cash flows." Computers & operations research, 21(8), 1994, pp. 841-853. https://doi.org/10.1016/0305-0548(94)90014-0
- Ortner, M., Descombes, X., & Zerubia, J. "An adaptive simulated annealing cooling schedule for object detection in images". 2007, Research Report, INRIA, Vol. 6336
- Jia, Q., & Seo, Y., "An improved particle swarm optimization for the resource-constrained project scheduling problem." The International Journal of Advanced Manufacturing Technology, 67(9-12), 2013a, pp. 2627-2638. https://doi.org/10.1007/s00170-012-4679-x
- Jia, Q., & Seo, Y., "Solving resource-constrained project scheduling problems: conceptual validation of FLP formulation and efficient permutationbased ABC computation." Computers & Operations Research, 40(8), 2013b, pp. 2037-2050. https://doi.org/10.1016/j.cor.2013.02.012
- Kelley, J. E., "The critical-path method: resource planning and scheduling." Industrial scheduling. 1963.
- Kirkpatrick, S., Gelatt, C. D., & Vecchi, M. P., "Optimization by simulated annealing." science, 220(4598), 1983, pp. 671-680. https://doi.org/10.1126/science.220.4598.671
- Kolisch, R., Sprecher, A., & Drexl, A. "Characterization and generation of a general class of resource-constrained project scheduling problems." Management science, 41(10), 1995, pp. 1693-1703. https://doi.org/10.1287/mnsc.41.10.1693
- Kolisch, R., & Hartmann, S., "Heuristic algorithms for the resource-constrained project scheduling problem: Classification and computational analysis." In Project scheduling, Springer, Boston, MA, 1999, pp. 147-178.
- Ranjbar, M. R., & Kianfar, F., "Solving the discrete time/resource trade-off problem in project scheduling with genetic algorithms." Applied Mathematics and Computation, 191(2), 2007, pp. 451-456. https://doi.org/10.1016/j.amc.2007.02.109
- Ranjbar, M., De Reyck, B., & Kianfar, F., "A hybrid scatter search for the discrete time/resource trade-off problem in project scheduling." European Journal of Operational Research, 193(1), 2009, pp. 35-48. https://doi.org/10.1016/j.ejor.2007.10.042
- Sprecher, A., Kolisch, R., & Drexl, "A. Semi-active, active, and non-delay schedules for the resource-constrained project scheduling problem." European Journal of Operational Research, 80(1), 1995, pp. 94-102. https://doi.org/10.1016/0377-2217(93)E0294-8