우선순위 규칙을 적용한 BIM 기반 설계검증 성과 분석 (BIM-based Design Verification Performance Analysis with Priority Rules Applied)

  • 허승하;심재형;함남혁;김재준
    • 한국BIM학회 논문집
    • /
    • 제11권3호
    • /
    • pp.1-11
    • /
    • 2021
  • BIM is one of the means of reducing the economic loss caused by design errors. These features of BIM have led to increased use of BIM. With the increasing use of BIM, several studies have been conducted to analyze the performance of BIM. As the importance of BIM staff is emphasized in the performance analysis of BIM, the human resource allocation of BIM staff can become an important research issue. However, there are few studies to measure the workforce effectiveness of BIM staff. Ham et al (2020) measured BIM workforce efficiency using FCFS queue model rules. Since design errors can have different effects on the project depending on the type, there are design errors that must be dealt with first. Therefore, in this study, a priority queue was used to solve design errors with high priority first. The performance of BIM-based design verification was analyzed by quantitatively analyzing the performance of BIM staff when the priority rule was applied to the design error processing sequence.

대기행렬 모형을 활용한 시공단계 BIM 코디네이터 업무 성과 분석 (Empirical Evaluation of BIM Coordinator Performance using Queuing Model in Construction Phase)

  • 함남혁;여옥경;지규현
    • 한국BIM학회 논문집
    • /
    • 제8권3호
    • /
    • pp.31-42
    • /
    • 2018
  • This study focuses on the BIM request for information(RFI) processing performance and quantitatively analyzes the performance of the BIM coordinator and the loss due to the waiting of the project participants. For these purposes, a method to quantitatively evaluate the performance of the BIM coordinator was proposed using a queueing model. For the verification, two projects in which BIM was applied in the construction phase were selected, and the BIM RFI data were collected through the analysis of the BIM monthly report and BIM coordinator work log of each project. In addition, the BIM input personnel, labor cost, and productivity data were collected through interviews with the experts of the case projects. The analysis of the BIM RFI processing performance of the BIM coordinator using the queueing model exhibited on a probabilistic basis that the waiting status of the project participants could vary depending on the preliminary BIM application to the design verification as well as the input number and level of the BIM coordinator personnel. In addition, the loss cost due to the waiting of the project participants was analyzed using the number of BIM RFIs waiting to be processed in the queueing system. Finally, the economic feasibility analysis for the optimal BIM coordinator input was performed considering the loss cost. The results of this study can be used to make decisions about the optimal BIM coordinator input and can provide grounds for the BIM return on investment (ROI) analysis considering the waiting cost of the project participants.

철도인프라 BIM 성과관리를 위한 업무 및 성과기록 표준 템플릿 개발 (Development of Business and Performance Record Standard Template for Rail Infrastructure BIM Performance Management)

  • 신민호;김환용;최영우;한상천
    • 한국BIM학회 논문집
    • /
    • 제10권4호
    • /
    • pp.50-59
    • /
    • 2020
  • Recently, the government has actively promoted the introduction of BIM at the national level to improve the efficiency and productivity of the construction industry, and private interest in the application of BIM has also increased. However, despite the large amount of references and information, not much research has been done in quantitative ways to accurately measure the performance of BIM projects. The purpose of this study is to review performance measurement cases using ROI, investment effect analysis, and queue model analysis using domestic and overseas BIM guideline research and to present standard templates that can quantitatively measure BIM performance records according to domestic conditions based on this. Performance measurement trends and cases according to the application of BIM were analyzed, and nine quantification elements were derived from this, and based on this, a performance measurement data collection template at the BIM life cycle stage was prepared. Detailed items and contents were prepared for the nine quantification elements, and the final template consisted of a total of 43 questions, divided into the entire stage (15), the beginning (8), the middle (8), and the latter (12) areas. It is expected that by using the standard template of railway BIM performance records developed in this study, the BIM design stage will be diagnosed and the deficiencies will be supplemented, which will be the basic data for measuring actual quantitative performance in all life cycle performance of future BIM projects.

BIM기반 공동주택 환경성능 및 에너지 해석 시스템 통합 개발 (BIM-Based Integrated Module for Apartment Environmental Performance and Energy Analysis)

  • 서혜수;이수현;임재상;최철호
    • 한국BIM학회 논문집
    • /
    • 제4권2호
    • /
    • pp.1-9
    • /
    • 2014
  • As interest in green building has increased, construction market has evolved through BIM-based architecture also, BIM-based technologies have been developed simultaneously. Due to this aspect, the need of environmental analysis software utilizing BIM data became essential. This study shows that BIM-based integrated module provides objective analysis to proceed quick decision-making for a proposal. In addition to that, this integrated module creates a model through BIM data to analyze and report residential environment and energy consumption such as, daylight, view, ventilation and privacy in order to practically apply the BIM technology from the schematic design.

사례분석을 활용한 시공단계 BIM 인력 투입 성과 분석 (Performance Analysis of BIM Labor using Case Analysis)

  • 김형진;유무영;김재준;최창식
    • 한국BIM학회 논문집
    • /
    • 제7권3호
    • /
    • pp.31-39
    • /
    • 2017
  • BIM is effective to improve the labor productivity of construction participants. From this point of view, it is important to analyze the outcome related with BIM Labor which covers most of the BIM investment costs. This research focuses on BIM RFI which is one of the major task of the BIM labor and analyze the outcomes. In addition, this research was quantitatively analyzed by the standby time and related cost caused by BIM labor, which affect the results of the project participants. To this end, analytical standby queue model was utilized to analyze the labor focusing on micros TASK. 11 projects were selected to analyze the results of BIM labor and RFI that the project participants requested to the BIM labor was collected. Through this, it collected variables for analyzing results, and Finally, we pulled out 4 projects for analysis. In this study, the basic results analysis of RFI processing of the BIM labor, the probabilistic analysis of BIM labor service status, and the economic analysis of BIM labor optimal inputs were performed by using the research model presented. The results of this study can be utilized to formulate the optimal strategy for BIM labor inputs(e.g. number of employees, level, time point, etc.) of the construction phase. Moreover, it can contribute to ensuring the credibility of the BIM ROI results by presenting the cost of BIM services in BIM ROI analysis and the standby cost of project participants.

건축정보모델링(BIM)기반 건축 환경 성능 사례 분석 (Case studies on BIM-based architectural environment performance analysis)

  • 문현준;최민석;박진우;유승호
    • 대한설비공학회:학술대회논문집
    • /
    • 대한설비공학회 2009년도 하계학술발표대회 논문집
    • /
    • pp.1412-1417
    • /
    • 2009
  • BIM(Building Information Modeling) is considered a new paradigm and a powerful method in building design, construction and maintenance. However, it is still hard to implement environmental performance analysis using BIM in design stages. This study aims to reveal practical problems and evaluate interoperability between building design information and performance analysis with case studies. Three case studies are performed using two environmental analysis programs (IES/VE, EnergyPlus) and BIM-based architectural design programs (Revit, GoogleSketchUp) in this paper.

  • PDF

시공현장 BIM 운영 및 성과측정을 위한 사례분석 (A Case Study on BIM Operating and Performance Measurement in Construction Phase)

  • 함남혁;김재준
    • 한국BIM학회 논문집
    • /
    • 제5권2호
    • /
    • pp.1-11
    • /
    • 2015
  • Despite a lot of research on BIM, there is no quantitative study to measure accurately the performance of BIM coordination service. Thus, this study suggested method to measure the performace of BIM coordination services, applying queueing models in the field of management science. To analyze queuing system of BIM coordination services, a group of BIM coordinator were selected. Through focus group interviews with experts were used in the analysis to derive mean arrival rate(${\lambda}$), mean service rate(${\mu}$) of BIM coordination services. Single-server queuing model(M/M/1), multiple server queuing model(M/M/s) is utilized for the BIM coordination services performance measurement in construction phase. This study has significant quantitative performance measurement approaches that can be utilized in the decision-making for the improvement of the BIM coordination services and to support the review of the alternatives accordingly. But There is a limit but it is difficult to take into account the increase or decrease of the cost of alternatives according to the review.

BIM and Thermographic Sensing: Reflecting the As-is Building Condition in Energy Analysis

  • Ham, Youngjib;Golparvar-Fard, Mani
    • Journal of Construction Engineering and Project Management
    • /
    • 제5권4호
    • /
    • pp.16-22
    • /
    • 2015
  • This paper presents an automated computer vision-based system to update BIM data by leveraging multi-modal visual data collected from existing buildings under inspection. Currently, visual inspections are conducted for building envelopes or mechanical systems, and auditors analyze energy-related contextual information to examine if their performance is maintained as expected by the design. By translating 3D surface thermal profiles into energy performance metrics such as actual R-values at point-level and by mapping such properties to the associated BIM elements using XML Document Object Model (DOM), the proposed method shortens the energy performance modeling gap between the architectural information in the as-designed BIM and the as-is building condition, which improve the reliability of building energy analysis. Several case studies were conducted to experimentally evaluate their impact on BIM-based energy analysis to calculate energy load. The experimental results on existing buildings show that (1) the point-level thermography-based thermal resistance measurement can be automatically matched with the associated BIM elements; and (2) their corresponding thermal properties are automatically updated in gbXML schema. This paper provides practitioners with insight to uncover the fundamentals of how multi-modal visual data can be used to improve the accuracy of building energy modeling for retrofit analysis. Open research challenges and lessons learned from real-world case studies are discussed in detail.