The Improvement of Point Cloud Data Processing Program For Efficient Earthwork BIM Design (토공 BIM 설계 효율화를 위한 포인트 클라우드 데이터 처리 프로그램 개선에 관한 연구)

  • Kim, Heeyeon;Kim, Jeonghwan;Seo, Jongwon;Shim, Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.5
    • /
    • pp.55-63
    • /
    • 2020
  • Earthwork automation has emerged as a promising technology in the construction industry, and the application of earthwork automation technology is starting from the acquisition and processing of point cloud data of the site. Point cloud data has more than a million data due to vast extent of the construction site, and the processing time of the original point cloud data is critical because it takes tens or hundreds of hours to generate a Digital Terrain Model (DTM), and enhancement of the processing time can largely impact on the efficiency of the modeling. Currently, a benchmark program (BP) is actively used for the purpose of both point cloud data processing and BIM design as an integrated program in Korea, however, there are some aspects to be modified and refined. This study modified the BP, and developed an updated program by adopting a compile-based development environment, newly designed UI/UX, and OpenGL while maintaining existing PCD processing functions, and expended compatibility of the PCD file formats. We conducted a comparative test in terms of loading speed with different number of point cloud data, and the results showed that 92 to 99% performance increase was found in the developed program. This program can be used as a foundation for the development of a program that reduces the gap between design and construction by integrating PCD and earthwork BIM functions in the future.

Development of BIM Templates for Vest-Pocket Park Landscape Design (소공원의 조경설계를 위한 BIM 템플릿 개발)

  • Seo, Young-hoon;Kim, Dong-pil;Moon, Ho-Gyeong
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.44 no.1
    • /
    • pp.40-50
    • /
    • 2016
  • A BIM, which is being applied actively to the construction and civil construction industries, is a technology that can maximize efficiency of various sectors from initial planning and design, construction, and maintenance, to demolition; however, it is in the introductory phase in the field of domestic landscaping. In order to introduce and promote BIM in the field of landscape design, this study developed a prototype of a library and template and analyzed the performance of trial application. For the development of a prototype, annotations and types were analyzed from floor plans of existing small parks, and components of landscape template were deduced. Based on this, play facilities, pergola, and benches were madeintofamily and templates, making automatic design possible. In addition, annotations and tags that are often used in landscape design were made, and a 3D view was materialized through visibility/graphic reassignment. As for tables and quantities, boundary stone table, mounding table, summary sheet of quantities, table of contents, and summary sheet of packaging quantities were grouped and connected with floor plans; regarding landscaping trees, classification criteria and name of trees that are suitable for domestic situations were applied. A landscape template was created to enable the library file format(rfa) that can be mounted on a building with BIM programs. As for problems that arose after the trial application of the prepared template, some CAD files could not be imported; also, while writing tables, the basis of calculation could not be made automatically. Regarding this, it is thought that functions of a BIM program and template need improvement.

Automation of Rebar Quantity Estimation in the Detailed Design Stage Using BIM Model Properties - Focused on the Calculation of Column Reinforcement Quantity - (BIM모델 속성정보를 활용한 상세설계단계에서의 철근 수량산출 자동화 방안 - 기둥 철근 수량산출 중심으로 -)

  • Lee, Ha-Neul;Yun, Seok-Heon
    • Journal of KIBIM
    • /
    • v.14 no.3
    • /
    • pp.13-21
    • /
    • 2024
  • This study aims to simplify the rebar quantity estimation process during the detailed design stage of buildings by addressing identified issues in the existing rebar quantity estimation process and establishing a BIM-based simplification method. To validate the applicability of the proposed method, it was applied to a case study of 'K' High School, with the results compared to rebar quantities from shop drawings to assess usability in real projects. It showed an error rate of 1.4% for SHD22S and 2.63% for HD10 among the types of rebar used in the case model. SHD22S, used as the main rebar in the columns, exhibited this error due to differences in the calculation method for splice and anchorage lengths. HD10, used as stirrup rebar in the columns, showed errors due to the omission of hook length considerations in the simplified estimation formula. Although these discrepancies resulted in cumulative errors of 10 to 20 meters, the error rates of 1.4% and 2.63% respectively fall within the generally accepted rebar overage rate of 5%, suggesting that this method is sufficiently accurate for quantity estimation during the detailed design stage. This study presents a method for efficiently estimating rebar quantities based on BIM during the detailed design stage. While traditional 2D quantity estimation and BIM-based methods often suffer from inefficiencies due to repetitive tasks and high modeling complexity, the proposed method assumes BIM models at LOD200, which are less complex and automate most of the structural information required for rebar quantity estimation, thereby reducing repetitive tasks. However, to further minimize errors, especially those related to hook and anchorage length calculations, additional research is needed to refine the estimation process and expand its applicability to the entire building's rebar quantity estimation.

Reliability Analysis and Utilization of BIM-based Highway Construction Output Volume (BIM기반 고속도로 공사 물량산출 신뢰성 검토 및 활용)

  • Jung, Guk-Young;Woo, Jeong-Won;Kang, Kyeong-Don;Shin, Jae-Choul
    • Journal of KIBIM
    • /
    • v.3 no.3
    • /
    • pp.9-18
    • /
    • 2013
  • In case of applying the BIM method in the civil engineering of irregularly shaped structure, BIM method began to be introduced in the current building engineering area compared with the expected effects of the relatively high construction productivity has been recognized. In this paper, I have developed quantity calculation algorithms applying it to earthwork and bridge construction, tunnel construction, retaining wall construction, culvert construction and implemented BIM based 3D-BIM Modeling quantity calculation. Structure work in which errors occurred in range between -6.28% ~ 5.17%. Especially, understanding of the problem and improvement of the existing 2D-CAD based of quantity calculation through rock type quantity calculation error in range of -14.36% ~ 13.07% of earthwork quantity calculation. It's benefit and applicability of BIM method in civil engineering. In addition, routine method for quantity of earthwork has the same error tolerance negligible for that of structure work. But, rock type's quantity calculated as the error appears significantly to the reliability of 2D-based volume calculation shows that the problem could be. Through the estimating quantity of earthwork based 3D-BIM, proposed method has better reliability than routine method. BIM, as well as the design, construction, maintenance levels of information when you consider the benefits of integration, the introduction of BIM design in civil engineering and the possibility of applying for the effectiveness was confirmed. In addition, as the beginning phase of information integration, quantity document automation program has been developed for activation of BIM. And automatically enter the program code number, linkage and manual volume calculation program, quantity document automation programs, such as the development is now underway, and step-by-step procedures and methods are presented.

A Study on Automated Reinforcement Detailing for Reinforced Concrete Structures Using BIM (BIM 기반 철근콘크리트 구조물의 자동 배근 모델 생성)

  • Park, U-Yeol;Yun, Seok-Heon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.24 no.4
    • /
    • pp.507-515
    • /
    • 2024
  • Recent advancements in Building Information Modeling(BIM) have significantly impacted the construction industry, driving competitiveness and innovation. However, rebar construction, a critical component influencing project quality and cost, has lagged behind in BIM adoption. Traditional methods relying heavily on 2D drawings for rebar detailing have hindered efficiency and introduced potential errors. This paper presents a novel system designed to automate the detailed modeling of rebar, thereby promoting BIM integration within rebar construction and optimizing construction management processes. The system leverages confirmed structural drawings from the post-structural design phase to automatically generate intricate rebar models for columns and beams. To ensure adherence to domestic structural design standards, the system is developed using C# programming language and the Revit API. By automating rebar modeling, this system aims to minimize human error, reduce labor-intensive tasks, and enhance overall rebar construction efficiency through the effective utilization of generated rebar model data.

Geometry-to-BIM Mapping Rule Definition for Building Plane BIM object (건축물 평면 형상에 대한 형상-to-BIM 맵핑 규칙 정의)

  • Kang, Tae-Wook
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.10
    • /
    • pp.236-242
    • /
    • 2019
  • Recently, scanning projects have been carried out in various construction and construction fields for maintenance purposes. The point cloud generated by the scan results is composed of a number of points representing the object to be scanned. The process of extracting the necessary information, including dimensions, from such scan data is called paradox. The reverse engineering process of modeling a point cloud as BIM involves considerable manual work. Owing to the time-consuming reverse engineering nature of the work, the costs increase exponentially when rework requests are made, such as design changes. Reverse engineering automation technology can help improve these problems. On the other hand, the reverse design product is variable depending on the use, and the kind and detail level of the product may be different. This paper proposes the G2BM (Geometry-to-BIM mapping) rule definition method that automatically maps a BIM object from a primitive geometry to a BIM object. G2BM proposes a process definition and a customization method for reverse engineering BIM objects that consider the use case variability.

Analysis for the Applicability of Automated Quantity Take-off Technique Using BIM Authoring Tools on Road Construction (BIM 저작도구를 활용한 도로공사 수량산출 자동화 활용성 분석)

  • Moon, Jin-Seok;Sun, Ji-Won;Choi, Won-Sik
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.10
    • /
    • pp.5184-5191
    • /
    • 2013
  • The automated quantity take off technique using BIM authoring tools has been recently issued, and the studies of this method for the accuracy, efficiency, and the unit computing for the simple volume, area and number have been developed. Meanwhile the main concerns such as the details for the level of modelling, and the costs and time for the calculating BOQ item are still required to study. In this paper, the earth works, drainage works, pavement works, and facility works using BIM authoring tools are designed in 3D, and the applicability of automated quantity take off technique using BIM authoring tools is discussed, respectively. As a result, automated quantity take off are limited in the earth works, drainage works, pavement works, and facility works. But Most items of BOQ can be supported in Re-bar model.

Developing Object Library Browser for Reclamation Based BIM (BIM 기반의 준설매립전용 Library Browser 개발)

  • Lee, Dongyun;Lee, Junho;Lee, Sangwoong;Choi, Chaseok;Gu, Bonhyo
    • Journal of the Korean GEO-environmental Society
    • /
    • v.15 no.3
    • /
    • pp.57-63
    • /
    • 2014
  • This study has been conducted to building a library intended for structures considered in the design of reclamation for design automation and developing browser for integrated management system. The library has been developed using a parametric modeling method capable of changing section shape, also classifying standard crossing and family library, has been developed according to the working environment. Classified library by the characteristics manages objects and working modeling on based BIM has been developed browser using the C# program for objects to use conveniently. By interworking between developed Browser and 3D Autocad based BIM, it is possible to use easily at design drafting, calculating quantities, developing a new library, and managing a library. The browser using effectively exclusive library to reclamation is developed in this study.

BIM-based visualization technology for blasting in Underground Space (지하공간 BIM 기반 발파진동 영향 시각화 기술)

  • Myoung Bae Seo;Soo Mi Choi;Seong Jong Oh;Seong Uk Kim;Jeong Hoon Shin
    • Smart Media Journal
    • /
    • v.12 no.11
    • /
    • pp.67-76
    • /
    • 2023
  • We propose a visualization method to respond to civil complaints through an analysis of the impact of blasting. In order to analyze the impact of blasting on tunnel excavation, we propose a simulation visualization method considering the mutual influence of the construction infrastructure by linking measurement data and 3D BIM model. First, the level of BIM modeling required for simulation was defined. In addition, vibration measurement data were collected for the GTX-A construction site, terrain and structure BIM were created, and a method for visualizing measurement data using blast vibration estimation was developed. Next, a spherical blasting influence source library was developed for visualization of the blasting influence source, and a specification table that could be linked with Revit Dynamo automation logic was constructed. Using this result, a method for easily visualizing the impact analysis of blasting vibration in 3D was proposed.

Establishment of Integrated Design Bases Management System of APR1400 Using BIM based Algorithm (BIM기반 Algorithm을 활용한 APR1400 설계기준 통합관리 체계 구축)

  • Shin, Jaeseop;Choi, Jaepil
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.5
    • /
    • pp.52-60
    • /
    • 2019
  • The APR1400 is a 1400MWe nuclear power plant developed through national technology development project over a period about 10years. Approximately 65,000 design drawings are produced for APR1400 construction. In order to maintain consistency among numerous drawings, the highest level of design bases drawings (DBDs) are created according to design bases and this is used in the subsequent design. However, DBDs are produced and managed on a document basis and they are managed various field, it was difficult to accurately reflect the design bases information in the subsequent design. Therefore, this study recognizes limitations of the document based DBDs and develops a system that can accurately reflect the design bases information to subsequent design by adopting BIM based design bases integrated information system. Especially, by introducing DBIL(Design Bases Information Layer) concept, DBIL was created and analyzed based on five design bases(Physical protection, Fire protection, Internal missile protection, Internal flood protection, Radiation protection) applied to APR1400. In the final result DBIL set and Datasheet are integrated of room, design bases information, building data(wall, slab, door, window, penetrations). So it can be used for subsequent design automation and design verification. Furthermore, it is expected that APR1400 DBILs data can be used extensively in constructability and design economics analysis through comparison with next generation nuclear power plant.