Park, Sang Mi;Kim, Hyeon Seung;Han, Seon Ju;Kang, Leen Seok
KSCE Journal of Civil and Environmental Engineering Research
/
v.37
no.6
/
pp.1109-1117
/
2017
Recently, 3D printer technology has been attracting attention in various industrial fields, and research papers are being conducted to utilize 3D printers in the construction industry. Actual structures such as bridges and buildings are being printed to 3D printers, and various applications such as mock-up structures using 3D printers are being proposed. In order to utilize 3D printer technology in the construction field, a 3D model is required, and the 3D BIM data produced at the design stage can be printed by a 3D printers, saving the cost and time of 3D model generation. However, 3D BIM data often does not satisfy the conditions for 3D printer output, causing many errors on output. In this paper, authors propose a problem analysis for 3D BIM model output to 3D printer and a method for reducing errors in 3D printing process of 3D BIM model. In addition, this paper presents a practical application of 3D model output from 3D printer.
Korean Journal of Construction Engineering and Management
/
v.13
no.4
/
pp.3-15
/
2012
Currently, Building Information Modeling (BIM) is an emerging technological shift that involves applying and maintaining an integral digital representation of all building information for different phases of the project life-cycle. Although BIM has been recognized as a main stream in the construction industry, it is difficult to ensure the quality of BIM data due to the problems such as internal errors of BIM tools and lack of guidelines considering design quality. Such problems give lots of difficulties to BIM adoption for designers, constructors, and owners. Therefore, it is necessary to develop the requirements including the object-oriented modeling method and property definition by applying the Industry Foundation Classes (IFC) which is an ISO/PAS 16739 standard for ensuring the quality of BIM data. This research aims at proposing the requirements considering the quality of BIM data and demonstrating the efficiency of the requirements with using the Solibri Model Checker (SMC) which is a quality control tool in a case study.
Proceedings of the Computational Structural Engineering Institute Conference
/
2009.04a
/
pp.573-577
/
2009
최근 건설업계에서는 3D객체기반인 Building Information Modelling(이하 BIM)에 대해 관심이 증가하기 시작했다. 하지만 BIM도입에 어려움을 격고 있는 것이 현실이며 특히 전통적인 정보교환 방식에서의 BIM을 적용하는데 가장 큰 어려움을 격고 있다. 현재 국내에 활용되는 전자도면 표준지침에는 BIM도입에 필요한 2D표준에 대한 내용은 없으며, BIM소프트웨어들도 이 부분에 대해서 충분히 커스터마이징 되지 않았다. 이는 BIM과도기에 2D도면의 필요성을 인식한다면 원할한 BIM도입을 위해서 반드시 그 대안이 필요하다. 따라서 본 논문에서는 국내 BIM 도입 시 국내 2D 전자도면표준을 고려한 BIM 모델에서의 원할한 2D도면추출에 대해 Template을 활용하는 방안을 제안하였다. 도면표준의 기준은 "건설CALS/EC 전자도면 작성 표준"에 근거 하여 표현기준 및 데이터 작성기준을 Template파일에 적용 시켰으며, 이 후 실험을 통해 BIM 도입 시 효율적인 도면 생산의 가능성을 확인 하였다.
The Journal of Korean Institute of Communications and Information Sciences
/
v.38C
no.4
/
pp.344-350
/
2013
It is essential to consider geometry in the early design stage for rational design decisions. However, a crucial decision had been taken by conversation, physical model, and gesture rather than BIM mode which can analyze geometry efficiently. This research proposes the framework of interaction between BIM model and physical model for real-time BIM analysis. Through this real-time system framework of two models, architects can adopt BIM data at early design stage to review analysis of BIM model. It should facilitate dynamic design based on rich BIM information from an early stage to a final stage.
Korean Journal of Construction Engineering and Management
/
v.12
no.5
/
pp.23-34
/
2011
Reliable progress management at construction requires integrated information of cost and schedule, and information is used as a basis for project performance measurement. However, separate handling of cost and schedule information at construction projects makes objective measurement more difficult and decreases management productivity due to additional works for breaking down bill of quantities into corresponding activities. Recently, research related to BIM addresses issues on effective progress management based on BIM with incorporation of daily progress management. Therefore, the objective of this paper is to propose information model for daily progress rate and budgeted cost of work performed by utilizing BTM-based quantity and location information.
Journal of the Korea Institute of Building Construction
/
v.20
no.2
/
pp.191-198
/
2020
The several smart construction technologies are being introduced to the construction industry, and among these technologies, a few companies are attempting quality control using 3D scanning and BIM. Therefore, in this study, 3D scanning and BIM were applied to cases of on-site quality inspection to confirm the applicability and utility. As a result, it was confirmed that the quality inspection using 3D scanning and BIM was shorter in time than the previously performed quality inspection and can be realized with less manpower. Therefore, it is considered that 3D scanning and BIM-enabled technologies can be applied to various items of quality inspection.
Proceedings of the Computational Structural Engineering Institute Conference
/
2011.04a
/
pp.132-135
/
2011
최근 설계 단계에서 설계품질 향상과 시공 단계에서 비용 절감을 효과를 기대하며 3차원 BIM 관련 기술에 대한 관심이 높아가고 있으며, 또한 부분적으로 기술 도입 효과가 나타나고 있다. BIM 기술은 크게 BIM 도구를 활용하여 설계정보를 디지털화하는 모델링 단계 기술과 BIM 모델로부터 설계 정보를 추출하여 업무 진행에 필요한 형태로 가공, 변환하는 정보 활용 기술로 구분하여 생각할 수 있다. BIM 기술에 대한 근자의 높은 관심에도 불구하고 실제 현장에 적용되어 가시적인 성과를 내는 데에 한계를 보이고 있는 이유 중 하나로 후자의 정보 추출 및 활용 기술의 범위와 완성도의 한계를 들 수 있다. 즉 많은 노력을 통하여 BIM 모델을 구축하더라도 이를 기반으로 물량산출, 도면 생성 등 가장 기본적인 업무조차도 현장에서 바로 사용할 수 있는 수준의 기능이 제공되고 있지 않다. 본 연구에서는 건축 골조를 대상으로 3차원 골조 모델을 이용하여 골조 물량, 특히 정확한 물량산출이 상대적으로 어려운 철근에 대하여 철근의 이음, 정착 등이 고려된 실행물량을 산출할 수 있는 시스템을 설계하고 구현하였다. 또한 3차원 모델을 기반으로 철근 배근시공도와 가공일람표를 관련 기준에 따라 정확히 자동 작성함으로써 골조공사가 효율적으로 수행되고, 특히 정확한 이음 및 정착과 가공 계획을 통하여 철근 손실율을 최소화함이 기대된다. 본 논문에서는 이러한 BIM 기반 골조 물량산출 및 도면생성 시스템과 관련하여 주요 시스템 설계 내용과 구현 결과에 대하여 기술한다.
Journal of the Korea Academia-Industrial cooperation Society
/
v.15
no.5
/
pp.3169-3175
/
2014
In this paper, we have established the procedures for $CO_2$ emission estimation BIM libraries by using the material takeoff function that BIM tools fundamentally provide, and verified its availability by applying to steel structures. The BIM library set-up procedures were made up of $CO_2$ emission coefficients and parameter extraction, project unit setting, parameter setting, and $CO_2$ emission quantity calculation formula set-up. We used Revit Architecture 2013 as BIM tool, and established the steel members' family libraries as BIM libraries. It is possible to calculate the $CO_2$ emission quantity by following the proposed BIM library set-up procedures, and users have only to input the $CO_2$ emission coefficients and unit weights of steel members being used. We expect that the results contribute to practical use of BIM in field, and vitalizations of the eco-friendly construction.
Journal of the Korea Academia-Industrial cooperation Society
/
v.16
no.9
/
pp.6297-6304
/
2015
Nuclear power plant decommissioning has attracted attention according to the shutdown decision of Kori 1 which is Korea's first nuclear power plant. Nuclear power plant decommissioning is the one who never experienced ever in our country. So, its process is difficult and time-consuming. In addition, it is difficult to determine the decommissioning quantity. This study proposed the plan that can be used in quantity take-off for nuclear power plant decommissioning using BIM technology being utilized in recent construction industry. As a result, we suggested the method of BIM-based quantity take-off such as the selection decommissioning method and process, setting up of BIM modeling environment, establishment of OBS & WBS, integrated BIM modeling, the definition of quantity property. The proposed plan can be utilized usefully from when permanent stopping nuclear power plant occurs intensively. Furthermore, the overseas nuclear power plant decommissioning project order also are expected through technology securement based on this plan.
KSCE Journal of Civil and Environmental Engineering Research
/
v.38
no.1
/
pp.133-140
/
2018
The purpose of this paper is to provide baseline on the current status and the activation of BIM in civil engineering which can integrate and manage the information and tasks generated during the life cycle. Hierarchical analysis was conducted to identify the level of BIM application, recognition survey for practitioners, and activation plans. The survey results show similar trends in BIM activation inhibition factor, the need for BIM, the effect of BIM and the future possibility of BIM. The utilization of BIM and the technical training in the civil engineering field were lower than those in the architectural field. The analysis of AHP(Analytic Hierarchy Process) is performed to identify the degree of importance in financial, operational, investment, technical, and institutional sections as its activating factors. As a result, the technical factor points the highest degree. Thus, study shows the direction to apply BIM in civil engineering in the future by suggesting an efficient plan.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.