1 |
BuildingSMART, http://www.buildingsmart.or.kr/overview/BIM.aspx (accessed: July 23, 2015) (in Korean).
|
2 |
Choi, J. S., Kim, I. H., Jo, C. W. and Choi, J. H. (2009). "Application status of domestic architectural industry of open BIM and development direction." International Juornal of CAD/CAM, Vol. 14, No. 6, pp. 355-363 (in Korean).
|
3 |
HOUD (2011). "BIM technology progress: current status and application cases." HOUD Report, No. 26 (in Korean).
|
4 |
Hwang, S. H., Jun, J. P., Seo, J. W. and Hwang, G. W. (2014). "Civil and infra BIM." Journal of the Architectural Institute of Korea, Vol. 15, No. 11, pp. 97-104 (in Korean).
|
5 |
Jeong, Y. S. (1999). "Analytical validation of a CIC framework." Journal of the Architectural Institute of Korea, Vol. 15, No. 11, pp. 97-104 (in Korean).
|
6 |
Ju, K. B. (2013). "BIM in Civil infrastructure sector." KICT Construction Brief (in Korean).
|
7 |
Public Procurement Survice (2015). "BIM guide for facility projects" (in Korean).
|
8 |
Kang, L. S., Kim, S. G., Kim, H. S. and Moon, H. S. (2011). "BIM application for civil enginerring project in planning and design phases." Journal of KIMBIM, Vol. 1, No. 1, pp. 26-31 (in Korean).
|
9 |
Lee, S. Y. and Jo, Y. S. (2011). "A study on the application methodology of set-based design approach of outrigger system based on lean process." Korea Journal of Construction Engineering and Management, Vol. 12, No. 4, pp. 50-58 (in Korean).
DOI
|
10 |
Ministry of Land, Infrastructure, and Transport (2010). "BIM guide for architectural projects" (in Korean).
|
11 |
Saaty, T. L. (1980). "Analytic hierarchy process." McGraw-Hill, New York.
|
12 |
Seo, M. B. and Ju, K. B. (2012). "Strategies to revitalize BIM (Building Information Modeling) by the survey questionnaires from design experts in field of civil engineering." International Journal of contents, Vol. 12, No. 1, pp. 446-457 (in Korean).
|