• Title/Summary/Keyword: BIM(Building information Modeling)

Search Result 800, Processing Time 0.027 seconds

Development of Virtual Construction Equipment Simulation System Based on BIM for Civil Engineering Project (토목시설물에 대한 BIM 기반 가상건설 장비 시뮬레이션 시스템 개발)

  • Kim, Sung-Hoon;Yoon, Young-Cheol;Joo, Cheol-Beom;Yoon, Dong-Ju
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.30 no.3
    • /
    • pp.223-230
    • /
    • 2017
  • BIM(building information modeling) has been actively applied to construction industries and to maximize its application through the life cycle of structure, various relevant technologies have been proposed. In particular, 4D sequencing management and 5D cost-related management were introduced as an improved version of the design review and interface control by 3D information design. On the other hand, the virtual construction using virtual construction equipment can sophisticatedly handle capacity, dynamic movement, collision boundaries of actual construction machines but it still stays at a low level in a technical sense. In this study, simulation systems based on BIM involving virtual construction equipment have been developed; then it is applied to the actual construction project to evaluate the safety and efficiency of construction equipments. It was confirmed that the simulation systems can be utilized to construct virtual construction site by using an effective 3D library of construction equipment and can plays a key role to secure construction safety and economic feasibility. Specifically, the simulation system are very useful for decision making by construction managers to select the optimum equipment and construction method with a better understanding for safety and cost-saving.

Space Management on Campus of a Mobile BIM-based Augmented Reality System

  • Ji, Seung-Yeul;Kim, Mi-Kyoung;Jun, Han-Jong
    • Architectural research
    • /
    • v.19 no.1
    • /
    • pp.1-6
    • /
    • 2017
  • Over the past decade, building information modeling (BIM) has gained a foothold in the construction sector. However, as digital data generated in the virtual space of a computer environment, BIM-based data have an inherent limitation in their application efficacy under field conditions. To overcome this, the present study employs augmented reality (AR) to reduce the discrepancy between the digital data generated in virtual spaces and real-world conditions. We assessed the potential applicability of an AR-based interface by analyzing existing examples of Apple, Google, and Facebook, which reflect the recent developments of technologies focusing on user experience. We then proceeded with an AR study, restricting the scope of application to a mobile environment in which an efficient information transmission between a digital model and real life can take place. Object-oriented software engineering was employed to ensure an efficient implementation of a BIM-based AR system for campus space management (CSM) in a mobile environment. Finally, we conducted a module test to check the reliability of the CSM method by using an AR-based mobile system with a prototype of the model used in university campuses, and extracted and itemized the supplementary requirements for CSM by using BIM tools for running AR applications.

Schedule Optimization in Resource Leveling through Open BIM Based Computer Simulations

  • Kim, Hyun-Joo
    • Journal of KIBIM
    • /
    • v.9 no.2
    • /
    • pp.1-10
    • /
    • 2019
  • In this research, schedule optimization is defined as balancing the number of workers while keeping the demand and needs of the project resources, creating the perfect schedule for each activity. Therefore, when one optimizes a schedule, multiple potentials of schedule changes are assessed to get an instant view of changes that avoid any over and under staffing while maximizing productivity levels for the available labor cost. Optimizing the number of workers in the scheduling process is not a simple task since it usually involves many different factors to be considered such as the development of quantity take-offs, cost estimating, scheduling, direct/indirect costs, and borrowing costs in cash flow while each factor affecting the others simultaneously. That is why the optimization process usually requires complex computational simulations/modeling. This research attempts to find an optimal selection of daily maximum workers in a project while considering the impacts of other factors at the same time through OPEN BIM based multiple computer simulations in resource leveling. This paper integrates several different processes such as quantity take-offs, cost estimating, and scheduling processes through computer aided simulations and prediction in generating/comparing different outcomes of each process. To achieve interoperability among different simulation processes, this research utilized data exchanges supported by building SMART-IFC effort in automating the data extraction and retrieval. Numerous computer simulations were run, which included necessary aspects of construction scheduling, to produce sufficient alternatives for a given project.

Research on the use of BIM for smart construction of Complex Geometry buildings (비정형 건축물의 스마트건설을 위한 BIM 활용에 대한 연구 - 세종포천선 처인휴게소 시공사례)

  • Park, Yang-Heum;Nam, Dong-Hun;Kim, Byung-Soo;Park, Jungjoon;Kim, Sungjin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.53-54
    • /
    • 2023
  • Because irregular shaped buildings are designed with various three-dimensional curves, the difficulty of design and construction is very high, and more construction drawings are needed to reduce construction errors. General 2D drawings may have limitations in conveying the information necessary for construction. By utilizing BIM, it is possible to three-dimensionally design parts that are not expressed on 2D drawings and additional structurall components required for the construction of the curved exterior finishing materials. This study examines the necessity of BIM at the construction stage, its performance through it, and how it can be linked to smart construction technology through construction BIM being applied to the new construction site of Sejong-Pocheon Line Cheoin Rest Area.

  • PDF

Case Studies of Precast Facade Digital Design and Fabrication Strategies (사례 분석을 통한 프리캐스트 입면 디지털 설계 및 패브리케이션 전략)

  • Kim, Jin-Ho
    • Journal of KIBIM
    • /
    • v.9 no.3
    • /
    • pp.8-18
    • /
    • 2019
  • Precast concrete manufacturing has proved economies of scale through the repetitive production by means of standardization, automation, and prefabrication. Advanced digital design and fabrication technologies can empower its benefits by enabling mass customization in the building design and construction. This study analyzed five case studies in terms of 1) design intent and background, 2) module development and facade construction, 3) integrated process among project stakeholder. This article has attempted to establish the following three points in conclusion: 1) Form generating digital design tools such as Rhino, CATIA, Generative Component, and Digital Project were implemented to produce parametric surface pattern and rationalization to maximize existing precast manufacturing benefits. Also, BIM program has been used to promote coordination and communication among engineering consultants and contractors, 2) In addition to traditional precast concrete materials, GFRC, RFP, brick cladding precast and 3D printed mould have been introduced to reduce the weight and cost and to comply the code from the zoning, seismic, and fireproof requirements, 3) Design-assist contract, design-assist financial support, and co-location measures have been introduced to facilitate collaboration between architect, fabricator, and contractor from the beginning of the project.

BIM-based cost estimation by integration with BIM mdel data and cost information - Case Study on Economy Evaluation of Apartment in Sejong Special Self-Governing city - (BIM 기반 견적 산출을 위한 공종별 BIM 데이터 구축 및 연계 방안 - 세종특별자치시 공동주택 경제성 평가 사례 연구 -)

  • Lee, Hae-Chan;Kim, Jin-Man;Choi, Cheol-Ho;Song, Sang-Hoon
    • Journal of KIBIM
    • /
    • v.7 no.3
    • /
    • pp.11-20
    • /
    • 2017
  • BIM technology, which is widely used in the construction industry, has been introduced in various fields for the purpose of saving construction cost and reducing construction schedule. However, in the case of BIM-based cost estimate, there are various trials and errors in applying BIM technology which can be applied for calculating quantity and cost estimate. BIM-based cost estimate can improve the quantity accuracy and allow to easy modifications that were not expected in 2D-based construction process. However, for this purpose, it is necessary to take into consideration that interoperability between BIM data and cost information should be planed in advance. Besides, the definition of a BIM data specification is also required for the seamless data exchange and integrity in each phase of the construction process. Therefore, in this study, we propose a BIM - based cost estimation method and technology in each type of work applicable to the current domestic construction industry.

Development of Business and Performance Record Standard Template for Rail Infrastructure BIM Performance Management (철도인프라 BIM 성과관리를 위한 업무 및 성과기록 표준 템플릿 개발)

  • Shin, Min-Ho;Kim, Hwan-Yong;Choi, Young-Woo;Han, Sang-Cheon
    • Journal of KIBIM
    • /
    • v.10 no.4
    • /
    • pp.50-59
    • /
    • 2020
  • Recently, the government has actively promoted the introduction of BIM at the national level to improve the efficiency and productivity of the construction industry, and private interest in the application of BIM has also increased. However, despite the large amount of references and information, not much research has been done in quantitative ways to accurately measure the performance of BIM projects. The purpose of this study is to review performance measurement cases using ROI, investment effect analysis, and queue model analysis using domestic and overseas BIM guideline research and to present standard templates that can quantitatively measure BIM performance records according to domestic conditions based on this. Performance measurement trends and cases according to the application of BIM were analyzed, and nine quantification elements were derived from this, and based on this, a performance measurement data collection template at the BIM life cycle stage was prepared. Detailed items and contents were prepared for the nine quantification elements, and the final template consisted of a total of 43 questions, divided into the entire stage (15), the beginning (8), the middle (8), and the latter (12) areas. It is expected that by using the standard template of railway BIM performance records developed in this study, the BIM design stage will be diagnosed and the deficiencies will be supplemented, which will be the basic data for measuring actual quantitative performance in all life cycle performance of future BIM projects.

Definition of requirements for creating BIM models for the development of SCAN to BIM guidelines (SCAN to BIM 지침 개발을 위한 BIM 기반 조달프로세스와 모델의 요구사항)

  • Kim, Do-Young
    • Journal of KIBIM
    • /
    • v.11 no.1
    • /
    • pp.11-20
    • /
    • 2021
  • In the domestic construction field, BIM and 3D scanning technology are combined to perform reverse engineering. It is necessary to develop guidelines or processes for domestic situations through 3D scenario investigation and reverse engineering projects using BIM. Using the case of actual construction service that performed reverse engineering, we analyze the areas that need to be reinforced compared to the existing advanced cases when creating guidelines. It is recommended to encourage the convergence between 3D scanning and BIM, and to define the requirements and levels of the BIM model in the procedure.

Interview - "BIM, Fits well with small and medium-sized architect offices!" (인터뷰 - "BIM, 중소규모 건축사사무소에도 잘 맞는다!")

  • Yuk, Hye-Min
    • Korean Architects
    • /
    • s.615
    • /
    • pp.32-35
    • /
    • 2020
  • 코로나19 이후 건축사업계 비대면 작업 등의 필요성이 대두되면서, 스마트건설 플랫폼 기술인 BIM(Building Information Modeling, 건설정보모델링) 활성화에 관한 목소리도 높아지고 있다. 최근 한국건설기술연구원에서는 공공분야 BIM 기술의 성숙도를 4단계(레벨1~4)로 봤을 때, 우리나라의 평가치는 '레벨1' 초보 수준에 머물러 있다는 진단을 냈다. 이미 '레벨3' 수준에 진입한 영국 등 선진국보다 뒤처져 있다는 분석인데, 이는 2D 환경을 기반으로 설계 또는 시공업무에 대해 제한적으로 BIM을 적용하면서, 일정 규모 이상의 설계BIM만 의무화한 수준이기 때문이다. BIM 트렌드가 '기술개발'에서 '활용' 단계로 넘어가는 과정 가운데 건축분야에서의 활성화 방안은 무엇일까. 월간 '건축사'가 'WBIM(주.더블유빔)'사(社)의 이재환 대표를 만나 BIM의 현장 활용성, 그리고 적용 측면에서의 현실문제 등에 대한 현장 이야기를 들어봤다. 각종 개발사업과 설계파트를 지원하며 BIM전문가로 활동해 온 이재환 대표는 "기획단계부터 BIM을 활용하면 사업 진행 전 과정에서 실시간 검증이 가능하고 동시에 각종 아이디어를 효과적으로 적용할 수 있다"면서도 "활용성을 확보하려면 업계뿐 아니라 발주처, 감독 등도 BIM에 대한 이해도를 높여야 한다"고 말했다.

  • PDF

Standardization of Infrastructure Information Modeling based on BIM Information Framework (BIM 정보프레임워크 기반의 토목구조물 정보모델링 표준화방안)

  • Nam, Jeong-Yong;Jo, Chan Won
    • Korean Journal of Computational Design and Engineering
    • /
    • v.19 no.3
    • /
    • pp.281-293
    • /
    • 2014
  • Although there have been a lot of BIM R&Ds in the civil engineering and their applications to the real projects, BIM in the field is still known to be behind the other areas. One of the reasons for this should be that the civil projects is generally too public for private participants to try new technologies, but it is mainly because the projects are so huge and complex that we still have the working environment where the systematic information sharing or exchanging is not smooth enough. In this paper, we are verifying the possibility and proposing the direction of BIM information standardization technology in civil engineering based on the integrated BIM information standard framework. For this purpose, after reviewing the introduction plan for BIM information framework, we applied it to an actual civil structure for test. The implementation result proved that the framework has possibility and effectiveness for the takeoff and construction cost calculation, which confirmed the standard framework needs to be extended consistently. This study is expected to contribute to the standard system establishment and its technology propagation for BIM development in the civil engineering.