• Title/Summary/Keyword: BIM(Building information Modeling)

Search Result 800, Processing Time 0.025 seconds

Propose to Modeling standard for automation quantity take-off of BIM-based (BIM 기반 물량산출 자동화를 위한 모델링의 기준제시)

  • Jun, Kl-Hyun;Yun, Seok-Heon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.143-144
    • /
    • 2011
  • Recently the construction project is intricately linked to the between participants. it is because construction informations are not integrate. This study suggests 3D modeling standard for integrated construction information. These suggestions can be useful to automation quantity take-off.

  • PDF

SUSTAINABLE AND ENVIRONMENTALLY RESPONSIBLE DESIGN USING BIM: A CASE STUDY OF A RESIDENTIAL PROJECT

  • Hyunjoo Kim;Kwok K. Tam
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.84-87
    • /
    • 2011
  • This paper describes the application of the three sustainable design elements for a residential project in the county of Los Angeles, USA. The first design element is the green building design in which a base model will be created using the Autodesk REVIT MEP program for the analysis by Building Information Modeling (BIM) for the energy analysis modeling process to determine the energy savings for each of the recommended design features. The second element is the Low Impact Development design for the site design using specialty material and structural devices for infiltration and recycling of storm water for reuse. The third element is the application of drought tolerant plant species in the site's landscaping design as a means to conserve water. The construction cost associated with the application of these three elements will be reviewed to determine the practicality and effectiveness of this sustainable design approach.

  • PDF

Case study of Civil Engineering BIM Projects: Perspective of Korean Public Owners (토목분야 BIM 적용 사례 분석을 통한 발주자 관점에서의 BIM 발전 전략)

  • Kim, Changyoon;Moon, Hyoun-Seok;Nah, Heu-Suk;Kim, Jin-Uk
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.12
    • /
    • pp.7430-7437
    • /
    • 2014
  • Owing to the increase in large and complex construction projects, the design paradigm of architecture and civil engineering projects has changed from 2D CAD to 3D CAD. For this reason, to meet the strong requirements of project contractors, various efforts have been made to adopt a Building Information Modeling (BIM) technology for effective construction management. On the other hand, compared to architectural projects, only a few civil engineering project cases have been conducted in the perspective of public contractors. This is because the characteristics of civil project contractors and the negative pursuit of adopting BIM technology due to the lack of a current BIM system and technologies. Recently, positive changes in adopting BIM technology for public projects were anticipated by public owners, such as the Public Procurement Service and the Ministry of Land, Infrastructure and Transport. In this regard, this study analyzed the current BIM technology status of public owners in Korea to adopt the BIM policies and guidelines of the Korean government. Strategies for adopting BIM technologies for Korean public owners are also discussed based on an analysis of civil engineering BIM project cases.

Parametric Quantity Take-Off of Earthwork by Comparing the Use of Surface and Solid Models (Surface 및 Solid 방식의 비교를 통한 Parametric 기법의 토공물량산출 방법)

  • Hwang, Hee-Su;Lee, Jae-Hong;Kim, Tae-Young
    • Journal of KIBIM
    • /
    • v.8 no.1
    • /
    • pp.56-62
    • /
    • 2018
  • There exists no precedented case of quantity take-off, using parametric modeling, from BIM-based irregular structures. Civil 3D provides earthwork quantity take-off based on surface modeling. Generally, designers should enter data into the specification additionally after extracting quantity estimation from earthwork modeling design. The objective of this report is to suggest the method from quantity take-off to specification of BIM-based earthwork quantities. We intend to investigate earthwork take-off method by Civil3D and explain why parametric information extraction is required for quantity estimation and specification and how information of earthwork quantity based on solid and surface modeling is connected to open quantity take-off module. It is highly expected that this suggestion would be the practical methodology of earthwork quantity take-off and specification in the field of civil engineering.

Development Method of BIM Data Modeling Guide for Facility Management : Focusing on Building Mechanical System (시설물 유지관리를 위한 BIM 데이터 입력기준 개발방안 : 건축 기계설비를 중심으로)

  • Won, Ji-Sun;Cho, Geun-Ha;Ju, Ki-Beom
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.25 no.4
    • /
    • pp.216-224
    • /
    • 2013
  • Facility data is created throughout the design and construction phase. But the most facility managers bear significant costs that arise from the lack of interoperability with facility lifecycle. This paper is concerned with the way to collect facility data using BIM technology. The aim of this paper is to suggest BIM data modeling guide for the facility management using the information that need to be delivered from design and construction phase to operation and management phase. The BIM data modeling guide focus on the properties of mechanical equipment. It is to be hoped that this study will contribute to collect facility data from as-built BIM data and to build facility management system database without difficulty.

A Study on the Development of the Technology of Evaluating the Performance of Energy - saving in the BIM-based Design Process in the Real Time Manner Focused on the Analysis of Coefficient of Overall Heat Transmission (BIM기반 건축물 설계 과정에서 실시간 에너지 성능 분석을 위한 기술 개발에 관한 연구 - 열관류율 분석을 중심으로)

  • Lee, Yun-Gil;Cho, Won-Jun
    • KIEAE Journal
    • /
    • v.13 no.1
    • /
    • pp.29-37
    • /
    • 2013
  • This study intended to introduce the method of designing an eco-friendly building based on BIM(Building Information Modeling) and BIM-based application. The proposed application aimed to generate the environmental performance of the designed alternative automatically in real-time manner in the process of architectural design. We focused on the feasibility of BIM-based eco-friendly design process and the applicability of the developed application for the architectural design practice. In this manner, in the end of paper, we proposed the so-call EcoBIM which is the performance evaluation module for the designed alternative using BIM in the real-time manner and the new design process with it. EcoBIM generate the coefficient of overall heat transmission of wall, roof and slab of the designed alternative with their physical characteristics such as thickness, thermal resistance and so on.

A Study on the Automated Estimating System using BIM based Library (BIM 기반 토목 라이브러리를 통한 견적자동화시스템에 관한 연구)

  • Han, Jung-Hoon;Nam, Sang-Hyeok
    • Journal of KIBIM
    • /
    • v.1 no.2
    • /
    • pp.12-18
    • /
    • 2011
  • The BIM techniques which manages information over the life cycle of construction project based on the 3-dimensional model are developing in the direction of integrated construction management including planning, design, analysis, estimation, 3D simulation and so on. The estimation model based on the BIM has different detail level and model information. In this study, the LOD of estimation model is catched for the bridge structures. The library classes are defined with construction information classification system, and the quantities of resources are calculated by class parameter using Microstation API. Finally, the automated estimation system using BIM based library is verified by the integrated model for adjustments of level of detail.

Improvement of BoQ Documents for the BIM based Quantity Takeoff (BIM기반 물량 및 내역정보 생성을 위한 내역서 개선방안)

  • An, Ji-Won;Yun, Seok-heon
    • Journal of KIBIM
    • /
    • v.7 no.2
    • /
    • pp.16-24
    • /
    • 2017
  • It is very important to estimate accurate construction total cost needed early in the project. In the initial phase of the design, the project cost estimates are determined by total quantity from design documents and the variables that affect the calculation of the total cost of the project. In order to determine accurate total construction cost, the contractor has to produce detailed quantity information based on the drawings and specifications. The process of preparing quantification and cost estimation documents is still being worked out manually, and a lot of errors have been occurred in many cases. Recent advances in information technology have led to the BIM based quantity takeoff and cost estimation. However, there are some limits to the extent to which the current specifications for BoQ documents are computed from BIM model. This research analyze the current BoQ cases and analyze how to make quantity takeoff possible through BIM. The study defined five levels of quantity category that could be produced by BIM. Only about 40% or indirectly usable items can be used when information is extracted to BIM modelling. This is very insufficient to fill out the BoQ. The BoQ document structure quantity takeoff specifications should be simplified in order to BIM based cost estimation more efficiently.

A Study for Derivation of Participant's Information Flow At Framework Construction based on BIM (BIM 기반의 골조공사에서 참여자별 정보의 흐름 도출에 관한 연구)

  • Kim, Yong-Hwa;Lee, Ju-Sung;Oh, Jung-Keun;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.2
    • /
    • pp.22-34
    • /
    • 2013
  • As construction project has been becoming larger, specialized and complicated, it is important to utilize a lot of information that is made by diverse participants. Especially this information is mainly produced in construction site that plays a leading role in construction project. The problem of information exchange between participants of construction site causes decline of construction productivity. So as to resolve this problem, there is a many interest in BIM(Building Information Modeling) that makes and manages a necessary data during building life cycle. But in Korea construction industry, applying BIM in construction phase is less active than in design phase. Through studying previous research, this study classify the main cause of failure related to information exchange in framework construction. And by interviewing expert, it draw a work that is possible to apply BIM. Next through analyzing framework construction site that is applied with BIM, this study proposes specific information flow model for supporting work by BIM.

A study on the possibility of reconfigurations of architectural cultural assets spatial Information by BIM -The case of spatial configurations of Sungnyemun recovery process- (BIM기반 건축문화재 공간정보 구성방식의 보완 가능성 -숭례문 복구공정 3차원 정보구축 사례를 중심으로-)

  • Choi, Hyun-Sang
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.294-295
    • /
    • 2014
  • Recently, it is becoming necessary for architectural heritage to make spatial information structure by using BIM(Building Information Modeling). However, current BIM system can not be used because its information classification and structure is not suitable for architectural heritage. This is a basic study which focuses on upgrading spatial information structure of BIM so that it would be possible to use BIM in management of preservation of architectural heritage, too. This study analyzes Sungnyemun case and its spatial information structure.

  • PDF