Parametric Quantity Take-Off of Earthwork by Comparing the Use of Surface and Solid Models

Surface 및 Solid 방식의 비교를 통한 Parametric 기법의 토공물량산출 방법

  • Received : 2018.03.14
  • Accepted : 2018.03.22
  • Published : 2018.03.31

Abstract

There exists no precedented case of quantity take-off, using parametric modeling, from BIM-based irregular structures. Civil 3D provides earthwork quantity take-off based on surface modeling. Generally, designers should enter data into the specification additionally after extracting quantity estimation from earthwork modeling design. The objective of this report is to suggest the method from quantity take-off to specification of BIM-based earthwork quantities. We intend to investigate earthwork take-off method by Civil3D and explain why parametric information extraction is required for quantity estimation and specification and how information of earthwork quantity based on solid and surface modeling is connected to open quantity take-off module. It is highly expected that this suggestion would be the practical methodology of earthwork quantity take-off and specification in the field of civil engineering.

Keywords

References

  1. Ha, C. S. (2013). Development of Automated Quantity Take off Algorithm for Irregularly Shaped Structures Basedon Surfac eModelina Construction Project, Masters Thesis, Kyeong- Sang University, pp. 12-13.
  2. Han, J. H., Nam, S. H. (2011). A Study on the Automated Estimating Systemusing BIM based Library, Journal of the Architecture Institute of Korea, pp. 1-6.
  3. Jung, G. Y., Woo, J. W., Gang, G. D., Shin, J. C. (2013). Reliability Analysis and Utilization of BIM-based Highway Construction Output Volume, Journal of the BIM Association of Korea, pp. 2-4.
  4. Hwang, H. S., Lee, J. H. (2017). BIM based Quantity and Price Automation Estimate Method, Journal of the BIM Association of Korea, pp. 2-3.
  5. Hwang, H. S., Lee, J. H., Lee, S. W. (2013). Hybrid BIM Based Automation Solution For Quantity(QBS:Quantity Breakdown System) and Price(EBS:Event Breakdown System), Journal of the BIM Association of Korea, pp. 1-2.

Cited by

  1. A measure for activating BIM by actual application analysis of integrated utilization process of quantity, process(4D), and construction cost(5D) in view of life-cycle vol.25, pp.12, 2018, https://doi.org/10.9708/jksci.2020.25.12.001